The CAPCOG Regional Planning and Services’ GIS Program assisted the Texas Department of Transportation (TxDOT) and Llano County with determining height estimations for the Rural Road 2900 bridge reconstruction and disaster debris cleanup efforts through mapping and data collection shortly after the Hill Country floods.
“We are here to help in whatever way we can, especially during emergencies,” said Craig Eissler, CAPCOG GIS program manager. “The CAPCOG GIS team often conducts robust geospatial analysis, but assisting with data collection and dissemination should lead to a swifter recovery and mitigation.”
For TxDOT, CAPCOG GIS obtained the 50-yr and 100-yr flood elevations and hydrologic discharge, or water-flow, rates from the current FEMA Flood Insurance Study for the Llano River very near where the 2900 bridge to Kingsland washed away.
This baseline data will be used with other analysis to begin design for a new bridge. For Llano County, the GIS Program plotted damage assessment data collected in the field using global positioning system (GPS) receivers on a county map according to severity. Creating such a map can assist with prioritizing cleanup and recovery efforts as well as record-keeping for potential financial assistance. Read more about the GIS Program.
The San Marcos City Council received a presentation on the Sidewalk Maintenance and Gap Infill…
The San Marcos River Rollers have skated through obstacles after taking a two-year break during…
San Marcos Corridor News has been reporting on the incredible communities in the Hays County…
Visitors won't be able to swim in the crystal clear waters of the Jacobs Well Natural…
Looking to adopt or foster animals from the local shelter? Here are the San Marcos…
The Lone Star State leads the nation in labor-related accidents and especially workplace deaths and…
This website uses cookies.