If approved, phase 1 engineering services on the 15 low water crossings identified throughout precincts 1 & 2. Phase 1 engineering services will consist of schematic level engineering, drainage analysis of each crossing and surveying of all 15 identified crossings.
Additionally, the crossing on Chaparral Road at Bear Creek will be completely designed, and all other preliminary phase services (environmental, utility, and geotechnical) services will be performed on Cotton Gin Road near Shady Oaks.
The following minutes have not been released for public review as of yet;
Hays County Commissioners Meeting Agenda — Tuesday, March 28, 2017
[gview file=”https://smcorridornews.com/wp-content/uploads/2017/03/HCC-Agenda-3-28-2017.pdf”]The San Marcos City Council received a presentation on the Sidewalk Maintenance and Gap Infill…
The San Marcos River Rollers have skated through obstacles after taking a two-year break during…
San Marcos Corridor News has been reporting on the incredible communities in the Hays County…
Visitors won't be able to swim in the crystal clear waters of the Jacobs Well Natural…
Looking to adopt or foster animals from the local shelter? Here are the San Marcos…
The Lone Star State leads the nation in labor-related accidents and especially workplace deaths and…
This website uses cookies.