Staff
While construction is tough on everyone, TxDOT is trying to do
everything it can to minimize disruptions.
Remember to support your local businesses as they are still open during construction…
.
.
On Sunday, April 25 at 10 p.m., the existing northbound I-35 to northbound US 183 flyover will close to traffic, weather permitting.
During the closure, crews will demolish and reconstruct a portion of the flyover. Construction is expected to last approximately four months.
To accommodate this reconstruction, a long-term detour will be put in place.
Northbound I-35 drivers wishing to access northbound US 183 will use the Rundberg Lane exit (#241) and take the non-signalized U-turn at Rundberg Lane to access the new southbound I-35 to northbound US 183 flyover.
.
Currently, the I-35 main lanes go under Posey Road. With the new configuration, I-35 main lanes will be going over Posey Road.
This project is made possible by a partnership between Hays County/TxDOT and is expected to cost $31.7 million funded by TxDOT.
The I-35 and Posey Road construction started in February 2019, and anticipated construction completion is planned for mid-2021. The project contractor is Webber, LLC.
All closures are weather permitting.
• CURRENT TRAFFIC ADVISORIES •
Eastbound and westbound Posey Road closed at the I-35 frontage road.
• Until further notice.
Read more on construction phasing and additional project details HERE.
.
.
The estimated construction cost is $21.9 million and is funded by the CAMPO and TxDOT. Construction commenced in September 2020, and its anticipated completion is early 2022. Hunter Industries, Ltd is the contractor for this project.
All closures are weather permitting.
• CURRENT TRAFFIC ADVISORIES •
Northbound I-35 frontage road right lane closed from FM 1626 to Kyle Crossing.
• Through late 2021.
Read more on construction phasing and additional project details HERE.
.
.
PROJECT OVERVIEW | Work includes relocating the existing northbound I-35 entrance ramp, constructing a new northbound exit ramp, reconstructing the northbound frontage road, and adding a new extended entrance/exit lane.
The estimated construction cost is $14 million funded by CAMPO and TxDOT. Construction commenced in January 2021, and its anticipated completion in mid-2022. Hunter Industries, Ltd is the contractor for this project.
.
All closures are weather permitting.
.
• NO CURRENT TRAFFIC ADVISORIES •
Read more on construction phasing and additional project details HERE.
.
.
PROJECT OVERVIEW | The project will reconstruct the bridge structures at Stassney Lane and William Cannon Drive and the frontage road bridge over Williamson Creek. Bicycle and pedestrian enhancements are also being made, and new safety lighting is being installed.
New U-turn bridges will be added in both directions at Stassney Lane and William Cannon Drive. The I-35 main lanes will be widened to incorporate shoulders and extended entrance/exit lanes to allow for a smoother merge onto I-35.
This major project is estimated to cost $78.8 million. Construction started in July 2016, with the anticipated completion in late 2020. The contractor for this project is OHL, USA, Inc.
..All closures are weather permitting.
• CURRENT TRAFFIC ADVISORIES •
Northbound I-35 right lane closed nightly at William Cannon Drive.
• Sunday, Aug. 1 through Monday, Aug. 2 from 9 p.m. until 5 a.m.
Southbound I-35 right lane closed at Slaughter Lane.
• Sunday, Aug. 1 from 9 p.m. until 5 a.m.
Southbound I-35 right two lanes closed at Stassney Lane.
• Monday, Aug. 2 from 9 p.m. until 5 a.m.
Northbound and southbound I-35 frontage road left lane closed between SH 71/Ben White Boulevard and Slaughter Lane.
• Monday, Aug. 2 from 9 p.m. until 5 a.m.
Northbound to southbound I-35 U-turn closed daily at William Cannon Drive.
• Monday, Aug. 2 through Wednesday, Aug. 4 from 9 a.m. until 3 p.m.
Eastbound and westbound Stassney Lane and William Cannon Drive closed at I-35.
• Monday, Aug. 2 from 9 p.m. until 5 a.m.
Westbound SH 71 to southbound I-35 flyover closed.
• Monday, Aug. 2 from 9 p.m. until 5 a.m.
Northbound I-35 right lane closed at SH 71/Ben White Boulevard.
• Tuesday, Aug. 3 from 9 p.m. until 5 a.m.
Northbound I-35 right lane closed nightly from William Cannon Drive to Stassney Lane.
• Wednesday, Aug. 4 through Thursday, Aug. 5 from 9 p.m. until 5 a.m.
Read more on construction phasing and additional project details HERE.
.
.
PROJECT OVERVIEW | This project includes main lanes and frontage road reconstruction and the addition of three new flyovers at US 183.
I-35 from Rundberg Lane to US 290 East is estimated to cost $124.2 million and is made possible by Texas Clear Lanes Congestion Relief Fund.
The construction commenced in January 2018, with an anticipated completion date in mid-2021. The contractor for this project is J.D. Abrams.
.
All closures are weather permitting.
.
• CURRENT TRAFFIC ADVISORIES •
Southbound I-35 US 183 exit (#240) closed.
• Through fall 2021.
Northbound to southbound I-35 U-turn closed continuously at US 183.
• Through fall 2021.
Northbound I-35 to northbound US 183 flyover closed continuously.
• Through fall 2021.
Northbound to southbound I-35 U-turn closed continuously at Rundberg Lane.
• Through fall 2021.
Northbound I-35 frontage road right lane closed continuously from US 290 East to La Posada Drive.
• Through fall 2021.
Northbound I-35 frontage road left lane closed nightly at Rundberg Lane. The Rundberg Lane entrance ramp will also be closed.
• Sunday, Aug. 1 through Thursday, Aug. 5 from 9 p.m. until 5 a.m.
Northbound I-35 frontage road left lane closed nightly from US 290 East to US 183.
• Sunday, Aug. 1 through Thursday, Aug. 5 from 9 p.m. until 5 a.m.
Northbound I-35 frontage road right lane closed from US 290 East to La Posada Drive. The St. Johns Avenue exit (#239) will also be closed.
• Sunday, Aug. 1 through Monday, Aug. 2 from 9 p.m. until 5 a.m.
Southbound I-35 frontage road left lane closed nightly from St. Johns Avenue to US 290 East. The US 290 East entrance ramp will also be closed.
• Sunday, Aug. 1 through Thursday, Aug. 5 from 9 p.m. until 5 a.m.
Southbound I-35 frontage road left lane closed nightly from US 183 to St. Johns Avenue.
• Sunday, Aug. 1 through Thursday, Aug. 5 from 9 p.m. until 5 a.m.
Southbound US 183 frontage road left lane closed at Cameron Road. The Cameron Road exit will also be closed.
• Sunday, Aug. 1 through Thursday, Aug. 5 from 9 p.m. until 5 a.m.
Westbound US 290 East frontage road right two lanes closed nightly from La Calma Drive to I-35.
• Sunday, Aug. 1 through Thursday, Aug. 5 from 9 p.m. until 5 a.m.
Northbound I-35 frontage road left lane closed daily from US 290 East to US 183.
• Monday, Aug. 2 through Friday, Aug. 6 from 9 a.m. until 3 p.m.
Northbound I-35 frontage road left lane closed daily from Rundberg Lane to Park Plaza Drive.
• Monday, Aug. 2 through Friday, Aug. 6 from 9 a.m. until 3 p.m.
Southbound I-35 closed at US 290 East.
• Monday, Aug. 2 from 11 p.m. until 5 a.m.
Southbound I-35 frontage road left lane closed nightly from Rundberg Lane to Powell Lane.
• Monday, Aug. 2 through Thursday, Aug. 5 from 9 p.m. until 5 a.m.
Northbound I-35 closed from US 290 East to US 183.
• Tuesday, Aug. 3 from 11 p.m. until 5 a.m.
Northbound US 183 frontage road left lane closed from Rutherford Road to Norwood Park Boulevard.
• Wednesday, Aug. 4 from 9 p.m. until 5 a.m.
Northbound US 183 right two lanes closed from US 290 West to the I-35/Lamar Boulevard exit. The I-35/Lamar Boulevard exit will also be closed.
• Wednesday, Aug. 4 from 9 p.m. until 5 a.m.
Southbound I-35 frontage road left lane closed from Delmar Avenue to Blackson Avenue.
• Wednesday, Aug. 4 from 9 a.m. until 3 p.m.
Southbound I-35 Rundberg Lane entrance ramp closed nightly.
• Wednesday, Aug. 4 through Thursday, Aug. 5 from 9 p.m. until 5 a.m.
Southbound I-35 right lane closed from US 183 to US 290 East. The southbound US 183 to southbound I-35 flyover will also be closed.
• Thursday, Aug. 5 from 9 p.m. until 5 a.m.
Read more on construction phasing and additional project details HERE.
.
.
PROJECT OVERVIEW | Reduced congestion, improved mobility at Parmer Lane and Lamar Boulevard, operational efficiency, more reliable travel times, lower fuel consumption.
This project’s estimated construction cost is funded by Texas Clear Lanes and CAMPO with an estimated $24.6 million cost.
Construction started in July 2019 with an estimated timeline to be completed by mid-2021. Primoris Services Corporation is the project contractor.
All closures are weather permitting.
.
Southbound I-35 left lane closed nightly from the Parmer Lane exit (#245) to Yager Lane.
• Sunday, Aug. 1 through Monday, Aug. 2 from 8 p.m. until 5 a.m.
Southbound I-35 frontage road left lane closed from Parmer Lane to Yager Lane.
• Sunday, Aug. 1 through Monday, Aug. 2 from 8 p.m. until 5 a.m.
Southbound I-35 frontage road closed from Parmer Lane to Yager Lane. The Parmer Lane entrance ramp will also be closed.
• Sunday, Aug. 1 from 8 p.m. until 5 a.m.
Northbound I-35 frontage road right lane closed daily at Parmer Lane.
• Monday, Aug. 2 through Friday, Aug. 6 from 9 a.m. until 3 p.m.
Southbound I-35 frontage road right lane closed daily at Yager Lane.
• Monday, Aug. 2 through Wednesday, Aug. 4 from 9 a.m. until 3 p.m.
Northbound I-35 bypass lane closed at Parmer Lane.
• Tuesday, Aug. 3 from 9 a.m. until 3 p.m.
Westbound Parmer Lane left lane closed at I-35.
• Tuesday, Aug. 3 from 9 a.m. until 3 p.m.
Read more on construction phasing and additional project details HERE.
.
.
PROJECT ACTIVITY | Improvements include reversing ramps, constructing an extended entrance/exit lane on the northbound I-35 mainlanes under SH-45 North, along the frontage road, installing high-mast lighting, and improvements at Picadilly Drive and the I-35 frontage road.
The projected cost is estimated at $8.2 million and funded by CAMPO and TxDOT. Construction will start in August 2020 and is anticipated to be complete in mid-2021. The project contractor is Jordan Foster Construction.
All closures are weather permitting.
.
• NO CURRENT TRAFFIC ADVISORIES •
Read more on construction phasing and additional project details HERE.
.
.
.
PROJECT OVERVIEW | These lane closures are associated with ongoing maintenance activities throughout the corridor.
All closures are weather permitting.
• CURRENT TRAFFIC ADVISORIES •
Northbound I-35 right lane closed from Holly Street to Cesar Chavez Street. The Holly Street exit (#234A) will also be closed.
• Monday, Aug. 2 from 10 p.m. until 5 a.m.
Southbound I-35 frontage road left lane closed from Covington Drive to Braker Lane.
• Monday, Aug. 2 from 10 p.m. until 5 a.m.
Southbound I-35 right lane closed from Lady Bird Lake to the Riverside Drive entrance ramp. The Woodland Avenue exit (#232B) will also be closed.
• Wednesday, Aug. 4 from 10 p.m. until 5 a.m.
Read more on construction phasing and additional project details HERE.
.
The San Marcos City Council received a presentation on the Sidewalk Maintenance and Gap Infill…
The San Marcos River Rollers have skated through obstacles after taking a two-year break during…
San Marcos Corridor News has been reporting on the incredible communities in the Hays County…
Visitors won't be able to swim in the crystal clear waters of the Jacobs Well Natural…
Looking to adopt or foster animals from the local shelter? Here are the San Marcos…
The Lone Star State leads the nation in labor-related accidents and especially workplace deaths and…
This website uses cookies.