Staff Reports
HAYS COUNTY – Hays County would like to make residents aware of upcoming construction operations that will require a lane closure as part of the extension of Robert S. Light Boulevard Project.
From 7:00 p.m. to 6:00 a.m. on Monday, March 7, till Thursday, March 10, J3 Construction will be temporarily widening the southbound lane of FM 2770 that will require a lane closure. The area affected will be south of Main Street and north of FM 1626 near the Centex Materials driveways but will be allowing access to the business.
Closures will be two-way, one lane operations including flagging personnel, lighting, and proper signage in the work area of the contractor. Project limits affected will be +/- 500 FT before and after the intersection at Centex Materials.
Hays County would like to thank citizens in advance for their cooperation and attentiveness during this time.
The San Marcos City Council received a presentation on the Sidewalk Maintenance and Gap Infill…
The San Marcos River Rollers have skated through obstacles after taking a two-year break during…
San Marcos Corridor News has been reporting on the incredible communities in the Hays County…
Visitors won't be able to swim in the crystal clear waters of the Jacobs Well Natural…
Looking to adopt or foster animals from the local shelter? Here are the San Marcos…
The Lone Star State leads the nation in labor-related accidents and especially workplace deaths and…
This website uses cookies.