Staff
The short & long term road construction projects that could affect your drive… Please use caution, drive slowly, and watch for heavy equipment, construction workers, and traffic control flaggers.
EVERY SATURDAY — Half a block of the street closed from the Alley to N. LBJ for the Farmers Market on the Square. Main Street Program 512.393.8430.
Hopkins Street between Bishop Street and Moore Street will be closed to vehicle and pedestrian traffic for a Street Reconstruction Project. Traffic will be detoured to Craddock at both ends of the project, with only local traffic allowed. Phase 4 is underway with local traffic closures from Blanco to Moore Street. The overall completion of the project is anticipated by Spring 2022. For more information call Richard Reynosa with the City of San Marcos Engineering Department at 512.393.8235.
1300 and 1400 Blocks of Uhland Road will be closed to vehicle and pedestrian traffic for a Road Reconstruction Project. For more information call Todd Keltgen at 512.212.7990.
Sidewalk closed from Guadalupe Street at Martin Luther King Drive to the railroad crossing for reconstruction. Also, a single lane closure at Hopkins Street at Guadalupe Street. Completion is expected by end of summer 2021. For information call New Age General Contractors, Inc. at 830.560.9077.
West Sessom Drive from LBJ Drive to Canyon Road will have single-lane closures for Boring Operations – Diego Ratchford – 512.250.8310.
The sidewalk at the corner of East San Antonio and Edward Gary will be closed for Sidewalk Maintenance. Public Works – 512.393.8036
The 1200 Block of Academy Street will have single eastbound lane closure for a Gas Line Relocation. Centerpoint Energy – 830.643.6927.
Feltner Avenue between Martin Luther King and West San Antonio will be closed for Utility Construction – Jacob Snyder 737.222.1789.
MILESTONE 1 | SEPTEMBER 2021 – DECEMBER 2021
The South Bound Frontage Road from Rio Vista Street to CM Allen Parkway will be reduced to a single lane for a Texas Department of Transportation Road Reconstruction Project – Mike Harlin – TXDOT Construction Project Manager – 512.487.9501.
MILESTONE 2 | STARTING JANUARY 5, 2022
The South Bound Frontage Road will be closed at CM Allen Parkway to McKie Street with all traffic detoured through CM Allen Parkway to Cheatham Street and down Guadalupe Street for a Texas Department of Transportation Road Reconstruction Project. – Mike Harlin – TXDOT Construction Project Manager – 512.487.9501.
The San Marcos City Council received a presentation on the Sidewalk Maintenance and Gap Infill…
The San Marcos River Rollers have skated through obstacles after taking a two-year break during…
San Marcos Corridor News has been reporting on the incredible communities in the Hays County…
Visitors won't be able to swim in the crystal clear waters of the Jacobs Well Natural…
Looking to adopt or foster animals from the local shelter? Here are the San Marcos…
The Lone Star State leads the nation in labor-related accidents and especially workplace deaths and…
This website uses cookies.