Location | Begin Date | Est. End Date |
---|---|---|
ROAD CLOSURES | ||
PATTON ST/KNOX/WAVELL: Patton St. to Knox and Patton St. to Wavell will be closed for a utility installation on January 8 – 31 daily, weather permitting. Please obey all Detour signs. Rockin Q. Construction, 512.557.8748 | Jan. 8 | Jan. 31 |
DUTTON DRIVE: Both sides of the street, approx. 150’ north of intersection at Wonder World Drive will be closed intermittently for utility construction on Jan. 10 – 24 from 7 a.m. – 5:30 p.m. LJ Cross Plumbing, 512.263.4222 | Jan. 10 @ 7 a.m. | Jan. 24 @ 5:30 p.m. |
417 COMANCHE: All lanes in both directions at the 400 blk of Comanche between Lindsey and Pat Garrison will be closed on January 16 – 20 from 7 a.m. – 4 p.m. for construction maintenance. Be aware of flaggers. Skyline builders/Matthew Ostrowski, 512.699.6465 |
Jan. 17 @ 7 a.m | Jan. 20 @ 4 p.m. |
IH35 SB EXIT RAMP: South bound exit ramp # 202 and south bound frontage road from HWY 123 to RM 12 will have a single right lane closed for construction on January 26 – 27 from 9 p.m – 5 a.m. TxDOT, 512.695.4248 | Jan. 26 @ 9 p.m. | Jan. 27 @ 5 a.m. |
SESSOM DR: There will be single lane closures from N. LBJ to Aquarena Springs on January 15 through March 31, weather permitting, from 8 a.m. to 5 p.m. daily for overhead utility work. CenturyLink, 903.675.0406 | Jan. 15 @ 8 a.m. | March 31 @ 5 p.m. |
PEQUES ST: There will be a one lane north bound closure for telecom installation at the intersection of Peques and the 300-800 block of Sessom to the end of the Texas State Parking lot on January 19 through February 16 from 9 a.m. – 4 p.m. Grande Communications, 512.590.9658 | Jan. 19 @ 9 a.m. | Feb. 16 @ 4 p.m. |
N LBJ: From Holland St. to Camaro Way will be closed to through traffic until the Spring of 2017. Road closure will occur during daytime construction hours. City contractor will be replacing utility lines in the area. Through traffic including Emergency Vehicles, will be routed around the project limits; please follow the detours. Engineering/Capital Improvements, 512.393.8130 | Present | Spring 2017 |
WOODS ST: A segment of Woods St between Comanche and North Street will be closed during construction of the new Texas State University Engineering & Science Building beginning Monday, August 15 until August 2018. Project Manager Scott Rouse, 512.245.2202 | Aug 15, 2016 | August 2018 |
EAST SAN ANTONIO STREET: Half a block closed from the alley to N. LBJ every Saturday from 8 a.m. – 3 p.m. for the Farmers Market on the Square. Main Street Program, 512.393.8430. | Year Round |
Year Round |
Street Maintenance
Low Water Crossing & Common Flood-Prone Streets |
---|
1400 block Uhland Road at Blanco River |
Cape Road at San Marcos River |
200 block C.M. Allen Parkway at Children’s Park |
1600 block Hunter Road at Purgatory Creek |
William Pettus Road at the Creek |
900 block of Cheatham Street & Sycamore Street |
McKie Street at IH 35 |
300 block of Ellis between Knox & Alabama Streets |
200 – 400 block of South LBJ between Cheatham and MLK |
The San Marcos City Council received a presentation on the Sidewalk Maintenance and Gap Infill…
The San Marcos River Rollers have skated through obstacles after taking a two-year break during…
San Marcos Corridor News has been reporting on the incredible communities in the Hays County…
Visitors won't be able to swim in the crystal clear waters of the Jacobs Well Natural…
Looking to adopt or foster animals from the local shelter? Here are the San Marcos…
The Lone Star State leads the nation in labor-related accidents and especially workplace deaths and…
This website uses cookies.