MyI35 Corridor Weekly Road Construction Alerts For Tuesday, Sept. 5 – Friday, Sept. 8

While construction is tough on everyone, TxDOT is trying to do everything it can to minimize disruptions. TxDOT knows you’ve got to get where you need to go.


Please note: No Scheduled Lane closures until Tuesday, Sept 5 due to the labor day holiday.

•  M Y   I – 3 5   C O R R I D O R   L A N E   C L O S U R E   A L E R T S  •  T U E S D A Y   9 / 05  –  F R I D A Y   9 / 08  •



I – 3 5   A T   5 1  S T   S T R E E T

Work includes adding a southbound intersection bypass lane to allow through-traffic to bypass the traffic signal, re-configuring the entrance/exit ramps, and realigning the southbound frontage road to add a new roundabout that improves traffic flow and safety.

Bicycle and pedestrian enhancements will also be made within the project limits.

• THIS WEEK’S PROJECT TRAFFIC ADVISORY •

Closures are weather permitting.

  • Southbound I-35 right lane closed between 51st St & Airport Blvd. – From 9 p.m. until 5 a.m. Thursday, September 7

 

Read more on construction phasing and additional project details HERE.



I – 3 5   A T   O L T O R F   S T R E E T

Improvements include the reconstruction of the Oltorf Street bridge, improving entrance/exit ramps and frontage roads, constructing new extended entrance/exit lanes for mainlanes and ramps, and adding U-turns in both directions at Oltorf Street.

Bicycle and pedestrian enhancements will also be made along the I-35 frontage roads in each direction within the project limits.

• THIS WEEK’S PROJECT TRAFFIC ADVISORY •

Closures are weather permitting.

  • I-35 reduced to one lane in both directions at Oltorf St. Eastbound & westbound Oltorf St will close at I-35. The ramps at Oltorf St will also close. – From 8 p.m. until 6 a.m. Tuesday, September 5

 

  • Northbound I-35 frontage road left lane closed at Oltorf St. – From 9 a.m. until 3 p.m. Tuesday, September 5

 

  • Northbound I-35 frontage road right lane closed between Woodward St & Oltorf St. – From 9 a.m. until 3 p.m. Tuesday, September 5 through Friday, September 8

 

  • Northbound I-35 frontage road right lane closed at Oltorf St. – From 9 p.m. until 5 a.m. Wednesday, September 6

 

  • Westbound Oltorf St and right turn lane closed at I-35. –  From 9 p.m. until 5 a.m. Wednesday, September 6 & Thursday, September 7

 

  • Westbound Oltorf St right lane closed at I-35. – From 9 a.m. until 3 p.m. Tuesday, September 5

 

Read more on construction phasing and additional project details HERE.



I – 3 5   F R O M   S T A S S N E Y   L A N E   T O   W I L L I A M   C A N N O N   D R I V E

The project will reconstruct the bridge structures at Stassney Lane and William Cannon Drive, as well as the frontage road bridge over Williamson Creek.

New U-turn bridges will be added in both directions at Stassney Lane and William Cannon Drive, and the I-35 mainlanes will be widened to incorporate shoulders and extended entrance/exit lanes to allow for better merging.

Bicycle and pedestrian enhancements are also being made, and new safety lighting is being installed. 

• THIS WEEK’S PROJECT TRAFFIC ADVISORY •

Closures are weather permitting.

  • Southbound I-35 frontage road right lane closed between Battle Bend Blvd & Stassney Ln. The right turn lane at Stassney Ln will also close. – From 9 a.m. until 3 p.m. Tuesday, September 5 through Thursday, September 7

 

  • Southbound I-35 frontage road left lane closed at Stassney Ln. – From 9 a.m. until 3 p.m. Tuesday, September 5 through Friday, September 8

 

  • Northbound I-35 frontage road right lane closed at William Cannon Dr. – From 9 a.m. until 3 p.m. Tuesday, September 5 through Thursday, September 7

 

I-35 at Slaughter Creek Overpass

  • I-35 reduced to one lane in each direction between Slaughter Ln & Onion Creek Pkwy. – From 10 p.m. until 6 a.m. Wednesday, September 6

 

Read more on construction phasing and additional project details HERE.

                                



I – 3 5   A T   F M   3 4 0 6

TRAFFIC ALERT: I-35 Mainlanes and FM 3406 to close for U-turn bridge construction.

 

• THIS WEEK’S PROJECT TRAFFIC ADVISORY •

Closures are weather permitting and updated on Fridays.

  • Northbound I-35 reduced to one lane under FM 3406 – From 9 p.m. until 5 a.m. Tuesday, September 5 through Thursday, September 7

 

  • Southbound I-35 frontage road right lane closed at FM 3406 – From 8 p.m. until 5 a.m. Tuesday, September 5 through Thursday, September 7

 

  • FM 3406 eastbound right turn lane at I-35 closed – From 8 p.m. until 5 a.m. Tuesday, September 5 through Thursday, September 7

 

Read more on construction phasing and additional project details HERE.



My I35 Traffic Alerts are provided by Central Texas Regional Mobile Authority (CTRMA) & TxDOT.

Share
Published by
Staff

Recent Posts

San Marcos City Council reviews Sidewalk Maintenance and Gap Infill Program

The San Marcos City Council received a presentation on the Sidewalk Maintenance and Gap Infill…

2 years ago

San Marcos River Rollers skate on and rebuild

The San Marcos River Rollers have skated through obstacles after taking a two-year break during…

2 years ago

After 8 Years, San Marcos Corridor News Bids Our Readers Farewell

San Marcos Corridor News has been reporting on the incredible communities in the Hays County…

2 years ago

High bacteria levels at Jacobs Well halts swimming season

Visitors won't be able to swim in the crystal clear waters of the Jacobs Well Natural…

2 years ago

Pets of the Week: Meet Sally & Nutella!

Looking to adopt or foster animals from the local shelter? Here are the San Marcos…

2 years ago

Texas still leads in workplace deaths among Hispanics

The Lone Star State leads the nation in labor-related accidents and especially workplace deaths and…

2 years ago

This website uses cookies.