What To Expect On San Marcos Roads During Week Of Aug. 13 – Aug. 19

San Marcos’ Weekly Road Construction & Traffic Report

Short & Long Term Road Construction Projects Affecting San Marcos Traffic Sunday, August 13 – Saturday, August 19, 2017

Can’t see the whole table? Touch it and scroll right.

WEEKLY ROAD CONSTRUCTION SCHEDULE 

zzz

LOCATION BEGIN DATE EST. END DATE
SCHOOL ZONE FLASHERS: Transportation Department will test school zone flashers city-wide. Transportation Department 512.393.8036.     Aug. 8 Aug. 8
400 COMANCHE: The south bound lane at the 400 blk of Comanche will be closed for construction maintenance. Be aware of flaggers. Skyline Builders 512.507.2868.   June 24  7 a.m.   Aug. 13   4 p.m.
IH-35 FRONTAGE ROAD NORTH OF YARRINGTON: Southbound inside lane of IH-35 Frontage Road north of Yarrington will be closed for curb and gutter construction. TXDOT 512.587.8895    Aug. 14   9 a.m.    Aug. 18     3 a.m.
LP 82/AQUARENA SPRINGS: Nighttime roadway closures from Charles Austin to Mill Street for LP 82/Aquarena Springs bridge construction from Monday – Thursday and from 6 p.m. to 6 a.m. for Friday – Sunday. Jordan Foster Construction, 760-828-2262  Aug. 14  8 p.m.    Sept. 6    6 a.m. 
LP 82/AQUARENA SPRINGS: LP 82/Aquarena Springs will have eastbound right lane closure from Charles Austin to Mill Street for LP 82/Aquarena Springs bridge construction. Jordan Foster Construction, 760-828-2262    Aug 17     9 a.m.    Aug. 18     3:30 p.m.
W WOODS/N COMANCHE ST: Woods Street between Comanche Street and Talbot Street, as well as Woods Street between N. Guadalupe Street and N. LBJ Drive will be closed in order to facilitate underground utility work that will serve the new Engineering and Science Building. During this closure, the Bus Stop at UAC has been temporarily relocated to the intersection of Concho Street and N. LBJ Drive. Texas State University, 512.245.2202   May 15   7 a.m.   Aug. 18   4 p.m
GIRARD ST FROM MARLTON TO CLYDE ST: A mill and overlay project will begin on Girard St. from Marlton to Clyde St weather permitting. This is not a road closure but a notice to be aware of the construction zone and obey traffic control flaggers. Please park your vehicle off the street or it may be towed at your expense. City of San Marcos Street Dept., 512.393.8025  
 Aug. 14    
 

Aug. 14

COMANCHE ST: The north bound lane of Comanche Street from Lindsey Street to Alkek Garage will be closed for underground utility and site work that will serve the new Engineering and Science Building. Access will be provided to Alkek and Wood Street Garages. Texas State University, 512.245.2202  May 22    7 a.m. Aug. 16 2017
EDWARD GARY FROM HOPKINS ST TO UNIVERSITY DR: This is a mill and overlay project This is not a road closure but a notice to be aware of the construction zone and obey traffic control flaggers. Please park your vehicle off the street or it may be towed at your expense. City of San Marcos Street Dept., 512.393.8025. Aug. 15 Aug. 17
FELTNER ALLEY FROM SAN ANTONIO ST TO HOPKINS: This is mill and overlay project, weather permitting. This is not a road closure but a notice to be aware of the construction zone and obey traffic control flaggers. Please park your vehicle off the street or it may be towed at your expense. City of San Marcos Street Dept., 512.393.8025. Aug. 17 Aug. 18
LONG TERM CLOSURE – VISTA ST: All lanes in both directions will be closed from 310 – 312 Vista Street for utility construction Texas State University, 512.245.2202 Present    July 31    2018
LONG TERM CLOSURE – SESSOM DR: Various lane closures from N. LBJ to Aquarena Springs Dr. for road construction. City of San Marcos Engineering/CIP Dept., 512.393.8130 Present  Jan.   2018
LONG TERM CLOSURE – N LBJ:  From Holland St. to Camaro Way, this road closure will occur during daytime construction hours. City contractor will be replacing utility lines in the area. Through traffic including Emergency Vehicles, will be routed around the project limits; please follow the detours. Engineering/Capital Improvements, 512.393.8130 Present Summer 2017
LONG TERM CLOSURE – WOODS ST: A segment of Woods St between Comanche and North Street will be closed during construction of the new Texas State University Engineering & Science Building. Project Manager Scott Rouse, 512.245.2202 August 2015 August 2018
LP 82/AQUARENA SPRINGS: TxDOT introduced a new traffic signal at the intersection of Post/Bobcat traffic will be detoured to the new signal. TxDOT, 512.393.8130     Feb.     2017 Spring 2018
LONG TERM CLOSURE – EAST SAN ANTONIO STREET – EVERY SATURDAY: Half a block closed from the alley to N. LBJ every Saturday from 8 a.m. – 3 p.m. for the Farmers Market on the Square. Main Street Program, 512.393.8430 Year  Round Year Round

 

 