Staff
The short & long term road construction projects that could affect your drive… Please use caution, drive slowly, and watch for heavy equipment, construction workers, and traffic control flaggers.
.
EVERY SATURDAY | 7:30 AM – 3 PM
Half a block of the street closed from the Alley to N. LBJ for the Farmers Market on the Square. Main Street Program 512.393.8430.
3/1/2021 — 4/30/2021 | 7 AM – 5 PM
The Victory Gardens Neighborhood will undergo a new underground utility installation with Impact to traffic on the following streets Georgia Street, Armstrong Street, Eisenhower Street, Camacho Street, McArthur Street, Virginia Street, and Churchill Street. The street and sidewalk closure will also affect Patton Street, Wavell Street, and Knox Street. For more information call Darren with Cox Commercial Construction – 956.601.1645
5/20/2021 — SPRING OF 2022
Hopkins Street between Bishop Street and Moore Street will be closed to vehicle and pedestrian traffic for a Street Reconstruction Project. Traffic will be detoured to Craddock at both ends of the project, with only local traffic allowed. Phase 2 is starting and is extending the closure for local traffic from Bishop to Endicott Street. Phase 1 is anticipated to be complete by January and will open to local traffic from Mitchell to Endicott. The overall completion of the project is anticipated by Spring 2022. For more information call Richard Reynosa with the City of San Marcos Engineering Department – 512.393.8235
11/30/2020 — 8/31/2021 | 9 AM – 3 PM
CM Allen to Thorpe will have intermittent single lane and sidewalk closures for sidewalks and driveway installation. For more information call Brad Bechtol with Mac Inc – 512.350.3767
3/15/2021 — 7/15/2021
1396 Uhland Road to Aquarena Springs Road will be closed to vehicle and pedestrian traffic for a Road Reconstruction Project. For more information call Todd Keltgen- 512.212.7990
3/23/2021 — 6/23/2021 | 8 AM – 5 PM
The Eastbound lane of the 1000 block of Uhland Road will be closed to vehicle and pedestrian traffic for a Utility Line Relocation. For more information call HMI Utilities- 940.255.7705
4/12/2021 — 4/16/2021 | 7 AM – 3 PM
The Rio Vista Neighborhood will have a single lane closure for Roadway Resurfacing. For more information call Public Services -Transportation- 512.393.8036
4/12/2021 — 4/30/2021 | 7 AM – 3 AM
Barnes Drive, Thermon Drive, and Chisos Street will have a single lane closure for Roadway Resurfacing. For more information call Public Services -Transportation 512.393.8036
Linda Drive will have intermittent single lane and sidewalk closures for Utility Testing. for more information call Jim Herbert with Cobb Fendley at 512.507.5957.
The San Marcos City Council received a presentation on the Sidewalk Maintenance and Gap Infill…
The San Marcos River Rollers have skated through obstacles after taking a two-year break during…
San Marcos Corridor News has been reporting on the incredible communities in the Hays County…
Visitors won't be able to swim in the crystal clear waters of the Jacobs Well Natural…
Looking to adopt or foster animals from the local shelter? Here are the San Marcos…
The Lone Star State leads the nation in labor-related accidents and especially workplace deaths and…
This website uses cookies.