Staff
The short & long term road construction projects that could affect your drive… Please use caution, drive slowly, and watch for heavy equipment, construction workers, and traffic control flaggers.
.
For more information, contact the City of San Marcos Transportation Department at 512.393.8036.
EVERY SATURDAY — Half a block of the street closed from the Alley to N. LBJ for the Farmers Market on the Square. Main Street Program 512.393.8430.
Hopkins Street between Bishop Street and Moore Street will be closed to vehicle and pedestrian traffic for a Street Reconstruction Project. Traffic will be detoured to Craddock at both ends of the project, with only local traffic allowed. Phase 4 is underway with local traffic closures from Blanco to Moore Street. The overall completion of the project is anticipated by Spring 2022. For more information call Richard Reynosa with the City of San Marcos Engineering Department at 512.393.8235.
CM Allen to Thorpe will have intermittent single lane and sidewalk closures for sidewalks and driveway installation. For more information call Brad Bechtol with Mac Inc at 512.350.3767.
1396 Uhland Road to Aquarena Springs Road will be closed to vehicle and pedestrian traffic for a Road Reconstruction Project. For more information call Todd Keltgen at 512.212.7990.
Sidewalk closed from Guadalupe Street at Martin Luther King Drive to the railroad crossing for reconstruction. Completion is expected by end of summer 2021. For information call New Age General Contractors, Inc. at 830-560-9077.
The Victory Gardens Neighborhood will undergo a new underground utility installation. The street closure will affect Patton Street. For more information contact Darren with Cox Commercial Construction at 956.601.1645.
West Sessom Drive from LBJ Drive to Canyon Road will have single-lane closures for Boring Operations – Diego Ratchford – 512.250.8310.
Opportunity BLVD at Flustern Road will be closed for a utility tie-in – Buda Mill & Grain Co. – Saenger Ellis- 512.627.7914.
River Road at Cape Street is closed for utility installation. For additional information, contact Cash Construction at 512-251-7871.
The San Marcos City Council received a presentation on the Sidewalk Maintenance and Gap Infill…
The San Marcos River Rollers have skated through obstacles after taking a two-year break during…
San Marcos Corridor News has been reporting on the incredible communities in the Hays County…
Visitors won't be able to swim in the crystal clear waters of the Jacobs Well Natural…
Looking to adopt or foster animals from the local shelter? Here are the San Marcos…
The Lone Star State leads the nation in labor-related accidents and especially workplace deaths and…
This website uses cookies.