San Marcos road construction, detours, closures for week of October 11

Staff

The short & long term road construction projects that could affect your drive… Please use caution, drive slowly, and watch for heavy equipment, construction workers, and traffic control flaggers.

  • All traffic projects may be subject to delays or extensions due to weather and/or the current Public Health situation.
  • For more information, contact the City of San Marcos Transportation Department at 512.393.8036.

REOCCURRING CLOSURES

EAST SAN ANTONIO STREET — FARMERS MARKET | 7:30 AM – 3 PM
EVERY SATURDAY — Half a block of the street closed from the Alley to N. LBJ for the Farmers Market on the Square. Main Street Program 512.393.8430.

 

CURRENT CONSTRUCTION PROJECTS

 

HOPKINS STREET | MAY 2020 — SPRING OF 2022
Hopkins Street between Bishop Street and Moore Street will be closed to vehicle and pedestrian traffic for a Street Reconstruction Project. Traffic will be detoured to Craddock at both ends of the project, with only local traffic allowed. Phase 4 is underway with local traffic closures from Blanco to Moore Street. The overall completion of the project is anticipated by Spring 2022. For more information call Richard Reynosa with the City of San Marcos Engineering Department at 512.393.8235.

UHLAND ROAD | MARCH 2021 — OCTOBER 2021
1396 Uhland Road to Aquarena Springs Road will be closed to vehicle and pedestrian traffic for a Road Reconstruction Project. For more information call Todd Keltgen at 512.212.7990.

GUADALUPE STREET IMPROVEMENTS | CURRENT – END OF SUMMER 2021
Sidewalk closed from Guadalupe Street at Martin Luther King Drive to the railroad crossing for reconstruction. Completion is expected by end of summer 2021. For information call New Age General Contractors, Inc. at 830-560-9077.

VICTORY GARDENS UTILITY PROJECT | AUGUST 1 – AUGUST 31 | 7 AM – 5 PM
The Victory Gardens Neighborhood will undergo a new underground utility installation. The street closure will affect Patton Street. For more information contact Darren with Cox Commercial Construction at 956.601.1645.

WEST SESSOMS DRIVE | AUGUST 3, 2021 – AUGUST 3, 2023
West Sessom Drive from LBJ Drive to Canyon Road will have single-lane closures for Boring Operations – Diego Ratchford – 512.250.8310.

IH-35 FRONTAGE ROAD | SEPTEMBER 2021 – NOVEMBER 2021
The IH-35 Frontage Road from Rio Vista Street to CM Allen Parkway will be reduced to a single lane for a Texas Department of Transportation Road Reconstruction Project. For additional information, contact Rohit Vij at 512-393-8133.

TAMPICO STREET | SEPTEMBER 27, 2021 – OCTOBER 29, 2021
The 100 Block of Tampico Street will be closed in all directions for Materials/Equipment Storage related to the IH-35 Reconstruction Project – Cliff Wharton – 830.643.6927

 

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button