Posted by Staff | @CorridorNews
Projects affecting San Marcos Traffic November 16-22, 2014
UNIVERSITY AT LBJ: West half of the intersection of LBJ at University will be closed for the next four weeks for construction. Please obey all traffic detour signs. TxDOT/City of San Marcos CIP/Engineering, 512.393.8130
UNIVERSITY FROM LBJ TO CM ALLEN: Full-time closure on eastbound lane on University from LBJ to CM Allen until Nov. 28, 2014 for replacement of sidewalk and curb and gutter along University. CIP/Engineering Dept., 512.393.8130
100 BLOCK E. SAN ANTONIO ST: All lanes in both directions will be closed for America Recycles Day 2014 on Nov. 15, 2014 from 8 a.m. to 3 p.m. Barricades will be placed for traffic control. Please be aware of all detour and street signage. City of San Marcos Solid Waste, 512.393.8407
ALLEY ADJACENT TO THE MARC: Texas Music Scene will be filming at The Marc on Nov. 17, 2014 from 8 a.m. to 11:30 p.m. The Marc, 214.546.8473
100-200 BLK ALTA VISTA: Street closure Nove. 22, 2014 from 11 a.m. to 4 p.m. for a skateboard race hosted by Texas State Longbording Co. Texas State Longbording, 512.745.3000
DUNBAR NEIGHBORHOOD: Asphalt Overlay Project for an estimated 3 to 6 weeks depending on weather from 8 a.m to 5 p.m. daily except for weekends. Streets to be paved include: Endicott, Nance, Armstead and Faris St. Residents are asked to park their vehicles off the street while their street is being worked on or they may be towed at their expense. Please drive slowly, use caution in the work zone and obey traffic control flaggers. City of San Marcos Street Dept., 512.393.8036.
RIVERSIDE DR. AND RIVIERA ST. OVERLAY PROJECT: Overlay Project from Hopkins St. to the railroad tracks for an estimated 3- to 6 weeks depending on weather from 8 a.m. to 5 p.m. daily except for weekends. Residents are asked to park their vehicles off the street while their street is being worked on or they may be towed at their expense. Drive slowly, use caution in the work zone and obey traffic control flaggers. City of San Marcos Street Dept., 512.393.8036
407 S. STAGECOACH TRAIL: All lanes in both directions will be closed from Dutton Drive to Stagecoach Trail for Utility construction starting Nov. 19 through Nov. 26, 2014 from 7 a.m. to 5 p.m. Sabre Commercial, 512.203.8681
EAST SAN ANTONIO STREET: Every Saturday from 8 a.m. – 3 p.m. Half a block of street closed from the alley to N. LBJ for the Farmers Market on the Square. Main Street Program, 512.393.8430
LONG TERM ROAD PROJECTS:
The San Marcos City Council received a presentation on the Sidewalk Maintenance and Gap Infill…
The San Marcos River Rollers have skated through obstacles after taking a two-year break during…
San Marcos Corridor News has been reporting on the incredible communities in the Hays County…
Visitors won't be able to swim in the crystal clear waters of the Jacobs Well Natural…
Looking to adopt or foster animals from the local shelter? Here are the San Marcos…
The Lone Star State leads the nation in labor-related accidents and especially workplace deaths and…
This website uses cookies.