Categories: NewsTraffic

San Marcos Traffic Update November 16-22, 2014

Posted by Staff  |  @CorridorNews

 

Projects affecting San Marcos Traffic November 16-22, 2014

 

UNIVERSITY AT LBJ: West half of the intersection of LBJ at University will be closed for the next four weeks for construction.  Please obey all traffic detour signs. TxDOT/City of San Marcos CIP/Engineering, 512.393.8130 

UNIVERSITY FROM LBJ TO CM ALLEN: Full-time closure on eastbound lane on University from LBJ to CM Allen until Nov. 28, 2014 for replacement of sidewalk and curb and gutter along University. CIP/Engineering Dept., 512.393.8130 

100 BLOCK E. SAN ANTONIO ST: All lanes in both directions will be closed for America Recycles Day 2014 on Nov. 15, 2014 from 8 a.m. to 3 p.m. Barricades will be placed for traffic control. Please be aware of all detour and street signage. City of San Marcos Solid Waste, 512.393.8407 

ALLEY ADJACENT TO THE MARC: Texas Music Scene will be filming at The Marc on Nov. 17, 2014 from 8 a.m. to 11:30 p.m. The Marc, 214.546.8473

100-200 BLK ALTA VISTA: Street closure Nove. 22, 2014 from 11 a.m. to 4 p.m. for a skateboard race hosted by Texas State Longbording Co. Texas State Longbording, 512.745.3000

DUNBAR NEIGHBORHOOD: Asphalt Overlay Project for an estimated 3 to 6 weeks depending on weather from 8 a.m to 5 p.m. daily except for weekends. Streets to be paved include: Endicott, Nance, Armstead and Faris St. Residents are asked to park their vehicles off the street while their street is being worked on or they may be towed at their expense. Please drive slowly, use caution in the work zone and obey traffic control flaggers. City of San Marcos Street Dept., 512.393.8036. 

RIVERSIDE DR. AND RIVIERA ST. OVERLAY PROJECT: Overlay Project from Hopkins St. to the railroad tracks for an estimated 3- to 6 weeks depending on weather from 8 a.m. to 5 p.m. daily except for weekends. Residents are asked to park their vehicles off the street while their street is being worked on or they may be towed at their expense.  Drive slowly, use caution in the work zone and obey traffic control flaggers. City of San Marcos Street Dept., 512.393.8036 

407 S. STAGECOACH TRAIL: All lanes in both directions will be closed from Dutton Drive to Stagecoach Trail for Utility construction starting Nov. 19 through Nov. 26, 2014 from 7 a.m. to 5 p.m. Sabre Commercial, 512.203.8681 

EAST SAN ANTONIO STREET: Every Saturday from 8 a.m. – 3 p.m.  Half a block of street closed from the alley to N. LBJ for the Farmers Market on the Square. Main Street Program, 512.393.8430

LONG TERM ROAD PROJECTS:

  • MOORE STREET: Moore Street is closed from Read to Holland Street until 2016 for dormitory construction. Texas State University FPDC, 512.245.2202
  • NORTH LBJ AT ACORN: Reconstruction of N LBJ will continue until Jan. 1, 2015 in conjunction with the N LBJ reconstruction project for street, sidewalk, drainage, water and wastewater improvements. Acorn Street can be accessed from Chestnut during this time period. Engineering/Capital Improvements, 512.393.8130
  • POST ROAD WATERLINE PROJECT:  The Post Road Waterline Project involves closures on the southbound lane from the Blanco River toward San Marcos into October. Motorists heading south on Post Road in San Marcos will experience delays between 7 a.m. and 7 p.m. daily from 2641 Post Rd. southward for a water line installation. Leave extra time and be aware of flaggers in the area. Hays County/City of San Marcos, 512.393.8235 
  • NORTH LBJ: Until Spring of 2015. Reconstruction project for street, sidewalk, drainage, water and wastewater improvements. Motorists will be detoured one way northbound on LBJ from Forest to Holland Streets and will use Chestnut as a southbound route during construction. Engineering/Capital Improvements, 512.393.8130
  • 323 LINDSEY STREET: Portion of parking lane on the south side of Lindsey Street will be blocked off for construction access daily through Jan. 1, 2015 starting at 7 a.m. Street will be passable for regular and emergency traffic. Skyline Commercial, 512.343.4555
  • TxDOT HUNTER ROAD (FM 2439) PROJECT: Lane closures on Hunter Road between Wonder World Drive and Bishop Street for road, bridge, drainage, bicycle and pedestrian improvements through the Fall 2015. TxDOT, 512.282.2113 or City of San Marcos CIP/ Engineering, 512.393.8130.

 

Share
Published by
Staff

Recent Posts

San Marcos City Council reviews Sidewalk Maintenance and Gap Infill Program

The San Marcos City Council received a presentation on the Sidewalk Maintenance and Gap Infill…

2 years ago

San Marcos River Rollers skate on and rebuild

The San Marcos River Rollers have skated through obstacles after taking a two-year break during…

2 years ago

After 8 Years, San Marcos Corridor News Bids Our Readers Farewell

San Marcos Corridor News has been reporting on the incredible communities in the Hays County…

2 years ago

High bacteria levels at Jacobs Well halts swimming season

Visitors won't be able to swim in the crystal clear waters of the Jacobs Well Natural…

2 years ago

Pets of the Week: Meet Sally & Nutella!

Looking to adopt or foster animals from the local shelter? Here are the San Marcos…

2 years ago

Texas still leads in workplace deaths among Hispanics

The Lone Star State leads the nation in labor-related accidents and especially workplace deaths and…

2 years ago

This website uses cookies.