LOCATION | BEGIN DATE | EST. END DATE |
---|---|---|
BERT BROWN RD/POST RD: There will be temporary street closures to allow for participants of a triathlon to cross the roadway at Bert Brown, Post and at Lime Kiln Road on Sunday, April 2 from 8 a.m. – 11 a.m. The race then heads out Lime Kiln Road to Hilliard Road and then Peidras Pass, returning along the same route back to Spring Lake. Juan Uribe, 832.433.3845 | April 2 @ 8 a.m. | Apr. 2 @ 11 a.m |
BUGG LANE: From the Dairy Queen entrance to Clarewood Drive the street will be closed for street maintenance March 28 – 31 from 8 a.m. – 5 p.m. Allegiance Utilities, 210.573.3326 | Mar. 28 @ 8 a.m. | Mar. 31 @ 5 p.m. |
IH 35/YARRINGTON SOUTH: The inside and outside lane of north bound frontage road south of Yarrington will be intermittently closed for concrete work at the new north bound entrance ramp #301 and north bound Exit ramp #302 March 25 – 31 from 9 a.m. – 3 p.m. One lane will remain open for smooth traffic flow. TxDOT, 512.587.8895 | Mar. 25 @ 9 a.m. | Mar. 31 @ 3 p.m. |
IH 35/YARRINGTON NORTH: The inside lane of north bound frontage road north of Yarrington will be intermittently closed for road paving maintenance at the new north bound ramp, #206 March 28 – 30 from 9 a.m. – 3 p.m. One lane will remain open for smooth traffic flow. TxDOT, 512.587.8895 | Mar. 28 @ 9 a.m. | Mar.30 @ 3 p.m. |
600 BLOCK MCARTHUR/GUADALUPE ST: One lane will be closed for installing utilities from McArthur to Guadalupe St. March 13 – 31 from 7 a.m. – 6 p.m. daily, weather permitting. Rockin Q Construction, 512.738.6666 | Mar. 13 @ 7 a.m | Mar. 31 @ 6 p.m. |
LP 82/AQUARENA SPRINGS: TxDOT will be introducing a new traffic signal at the intersection of Post/Bobcat. Traffic will be reduced to one lane in each direction and then detour to the new signal. This will last approximately 45 days starting on February 15. TxDOT, 512.393.8130 | Feb. 15 | End of April |
313 E. HUTCHISON: One lane at E. Hutchison will be closed for sewer maintenance through March 26 from 6 a.m. – 6 p.m. daily, weather permitting. EMJ Corp, 423.240.4738 | Mar. 26 @ 6 a.m. | Mar. 26 @ 6 p.m. |
ALLEN ST: Mill and asphalt overlay will begin on Allen St. from Earle to Clyde St. and Clyde St. from Bishop to Allen St. on March 7 – 31 from 8 a.m. – 5 p.m., daily, weather permitting. City of San Marcos Streets Dept., 512.393.8025 | Mar. 7 @ 8 a.m. | Mar. 31 @ 5 p.m. |
600 BLOCK MCARTHUR/GUADALUPE ST: One lane will be closed for installing utilities from McArthur to Guadalupe St. on March 13 – 31 from 7 a.m. – 6 p.m. daily, weather permitting. Rockin Q Construction, 512.738.6666 | Mar. 13 @ 7 a.m. | Mar. 31 @ 6 p.m. |
RR 12/CRADDOCK: On south bound RR 12 to Craddock, maintenance work will commence for new water main construction on March 1 – April 27 from 8 a.m. – 5 p.m. daily, weather permitting. South bound traffic will be re-routed to center turn lane. KIVA, 512.295.8900 | Mar. 1 @ 8 a.m. | Apr. 27 @ 5 p.m. |
LONG TERM CLOSURE – VISTA ST.: All lanes in both directions will be closed from 310 – 312 Vista Street for utility construction until July 31, 2018. Texas State University, 512.245.2202 | Present | July 31, 2018 |
SESSOM DR: Single lane closures from N. LBJ to Peques through April 28, weather permitting, from 7 a.m. to 6 p.m. daily for sidewalk construction. City of San Marcos Engineering/CIP Dept., 512.393.8130 | Present | April 28 |
LONG TERM CLOSURE – N LBJ: From Holland St. to Camaro Way will be closed to through traffic until the summer of 2017. Road closure will occur during daytime construction hours. City contractor will be replacing utility lines in the area. Through traffic including Emergency Vehicles, will be routed around the project limits; please follow the detours. Engineering/Capital Improvements, 512.393.8130 | Present | Summer 2017 |
LONG TERM CLOSURE – WOODS ST: A segment of Woods St between Comanche and North Street will be closed during construction of the new Texas State University Engineering & Science Building beginning Monday, August 15 until August 2018. Project Manager Scott Rouse, 512.245.2202 | Aug 15, 2016 | August 2018 |
EAST SAN ANTONIO STREET: Half a block closed from the alley to N. LBJ every Saturday from 8 a.m. – 3 p.m. for the Farmers Market on the Square. Main Street Program, 512.393.8430. | Year Round | Year Round |
The San Marcos City Council received a presentation on the Sidewalk Maintenance and Gap Infill…
The San Marcos River Rollers have skated through obstacles after taking a two-year break during…
San Marcos Corridor News has been reporting on the incredible communities in the Hays County…
Visitors won't be able to swim in the crystal clear waters of the Jacobs Well Natural…
Looking to adopt or foster animals from the local shelter? Here are the San Marcos…
The Lone Star State leads the nation in labor-related accidents and especially workplace deaths and…
This website uses cookies.