LOCATION | BEGIN DATE | EST. END DATE |
---|---|---|
TAX FREE WEEKEND: On Aug. 6 from 8 a.m. to 8 p.m. the Southbound IH 35 Exit ramp #200 will be closed for Tax Free Weekend. South bound drivers to the outlet malls should use the McCarty Exit #201. North bound IH 35 Exit Ramp #201 at McCarty Lane will also be closed. Northbound drivers to the outlet malls should use the Centerpoint Rd. Exit #200. City of San Marcos Traffic Dept., 512.393.8034 | Aug. 6 @ 8 a.m. | Aug. 6 @ 8 p.m. |
E DE ZAVALA DR.: From Staples Hwy to State Hwy 123, street renovation maintenance will start on Aug. 3 – 22, weather permitting from 7 a.m. – 5 p.m. daily. Please park your vehicle off the street or it may be towed at your own expense. Please obey warning signs and flagmen. City of San Marcos Streets Dept., 512.393.8025 | Aug. 3 @ 7 a.m. | Aug. 22 @ 5 p.m. |
1309 WONDER WORLD DRIVE: On Wonder World Drive at the Central Texas Medical Center, a City contractor will be working in the area to repair a water leak. The closure is currently scheduled for August 1 -12, weather permitting. The outside lane of east bound Wonder World Drive will be closed daily from 9 a.m. – 4 p.m. Engineering/ Capital Improvements, 512.393.8130 | Aug. 1 @ 9 a.m. | Aug. 12 @ 4 p.m. |
SH 123/CENTERPOINT: Various lanes on IH-35 from SH 123 to Centerpoint Rd. will be closed for milling and inlaying hot mix on the bridge decks Aug. 7 – 11 from 9 p.m. to 5 a.m. TxDOT, 512.353.1061 | Aug. 7 @ 9 p.m. | Aug. 11 @ 5 a.m. |
100 BLK CHARLES AUSTIN: All lanes in both directions will be closed for Texas State University commencement ceremonies on Aug. 12 from 7 a.m. to 8 p.m. Texas State University, 512.245.6272 | Aug. 12 @ 7 a.m | Aug. 12 @ 8 p.m. |
SESSOM DRIVE AT PEQUES STREET: City contractor will be working in the area to install underground electrical conduit. One lane of westbound Sessom will be closed daily for construction at Peques Drive. The intermittent closure is currently scheduled during working hours until August 12. Engineering/Capital Improvements, 512.393.8130 | Present | August 12 |
817 CHESTNUT ST: One lane will be closed for new construction to site through end of August 2016. Street will continue to be passable to all traffic. J4 Development, 469.236.0922 | Present | End of August 2016 |
EAST SAN ANTONIO STREET: Half a block closed from the alley to N. LBJ every Saturday from 8 a.m. – 3 p.m. for the Farmers Market on the Square. Main Street Program, 512.393.8430. | Year Round |
Year Round |
Street Maintenance
LOW WATER CROSSING & COMMON FLOOD-PRONE STREETS |
---|
1400 block Uhland Road at Blanco River |
Cape Road at San Marcos River |
200 block C.M. Allen Parkway at Children’s Park |
1600 block Hunter Road at Purgatory Creek |
William Pettus Road at the Creek |
900 block of Cheatham Street & Sycamore Street |
McKie Street at IH 35 |
300 block of Ellis between Knox & Alabama Streets |
200 – 400 block of South LBJ between Cheatham and MLK |
The San Marcos City Council received a presentation on the Sidewalk Maintenance and Gap Infill…
The San Marcos River Rollers have skated through obstacles after taking a two-year break during…
San Marcos Corridor News has been reporting on the incredible communities in the Hays County…
Visitors won't be able to swim in the crystal clear waters of the Jacobs Well Natural…
Looking to adopt or foster animals from the local shelter? Here are the San Marcos…
The Lone Star State leads the nation in labor-related accidents and especially workplace deaths and…
This website uses cookies.