Categories: NewsSan MarcosTraffic

#SMTX Traffic Alert: Top Weekly Road Construction & Traffic Traps

The long & short term road construction projects that could affect your drive… Please use caution, drive slowly and watch for heavy equipment, construction workers, and traffic control flaggers.

 

TRAFFIC ALERT: Traffic will have intermittent lane closure citywide for Crosswalk and School Zone striping

ADDITIONAL TEMPORARY TRAFFIC ALERTS

Street Maintenance Planned for the Following Neighborhoods

FRANKLIN ST. BETWEEN BISHOP AND FURMAN
Intermittent lane closure daily 7 AM – 7 PM through September for curb installation. City of San Marcos Transportation Department 512.393.8036.

JOHNSON BETWEEN DAILY AND MLK
Intermittent lane closures daily 8 AM – 5 PM for sidewalk construction. SM Transportation Department 512.393.8036.

Special Weekly Closures

EAST SAN ANTONIO STREET: Every Saturday FARMERS MARKET
Every Saturday from 7:30 AM to 3 PM Half a block of the street closed from the Alley to N. LBJ for the Farmers Market on the Square. Main Street Program 512.393.8430.

• Veterans Day Parade: — 10/25/19 to 11/05/19 — Event
Hopkins Street to CM Allen Parkway, to San Antonio, to Guadalupe will be closed November 9, 2019, from 7:30 AM to 12:00 PM for Veterans Day Parade Contact – City of San Marcos Parks and Rec 512-393-8413

KISSING TREE ALLEY 11/09/2019 EVENT
Kissing Alley will have a full lane closure on November 9, from 5:00 PM to 10:00 PM for the 218 Artist Cooperative – Joe Lea – 512.565.2328

Short Term

MIDWAY STREET 10/25/2019 to 11/05/2019 Utility Testing
Midway Street will close starting October 25 – November 5, 2019, from 8 AM to 4 PM for Utility Testing – Jim Herbert – 512.507.5957

VICTORY GARDENS UTILITY PROJECT 11/01/2019 to 11/30/2019 UTILITY INSTALLATION
The Victory Gardens Neighborhood will undergo a new underground utility installation with Impact to traffic on the following streets Georgia Street, Armstrong Street, Eisenhower Street, Camacho Street, Camacho Street, Virginia Street, and Churchill Street. Starting November 1- 30, 2019 from 7: 00 AM – 5:00 PM – Darren – Cox Commercial Construction – 956.601.1645

GUADALUPE STREET 11/06/2019 to 11/07/2019 UTILITY INSTALLATION
Guadalupe Street will close starting November 6 – 7, 2019, from 9:00 AM to 4:00 PM for Utility Installation – Gerald McLeod – 512.805.2638

 

Long Term

SESSOM DRIVE 9/16/19 to 11/04/19 TEXAS STATE DRAINAGE PROJECT
Sessom Drive will have an eastbound lane closure from Tomas Rivera Dr. to North LBJ Starting September 16 – November 4, 2019. The Road Closure will take place between the hours of 9 AM – 4 PM during weekdays and 7 AM – 7 PM for a Texas State Drainage Project. Javier Barajas 512.913.5080.

DOWNTOWN LOFTS APARTMENTS PROJECT 9/13/19 to 01/20/20 CONSTRUCTION
Traffic impacts include Fredricksburg Street at Hopkins Street to San Antonio, the southbound lane of Telephone Alley at Hopkins to San Antonio, Feltner Alley at San Antonio; will be closed due to construction starting September 13, 2019 – January 20, 2020. A.C.G. LLC 248.632.2311.

ARMSTEAD 3/11/19 to 11/11/2019TRAVIS STREET DRAINAGE PROJECT
Traffic impacts include the intersection of MLK at Armstead and Armstead from MLK to San Antonio Street will be closed starting March 11, 2019 – November 2019, from 7 AM to 5 PM for Utility Installation. Cox Construction, Darren Okruhlik, 956.601.1645.

SAN ANTONIO STREET 3/11/19 to 11/11/2019 TRAVIS STREET DRAINAGE PROJECT
Traffic impacts include San Antonio Street from Travis Street to Armstead will be closed starting March 11, 2019 – November 2019, from 7 AM to 5 PM for Utility Installation. Cox Commercial Construction, Darren Okruhlik, 956.601.1645.

SAN ANTONIO STREET 3/11/19 to 11/11/2019 TRAVIS STREET DRAINAGE PROJECT
Traffic impacts include Travis Street from San Antonio St. to Hopkins Street will be closed starting March 11, 2019 – November 2019, from 7 AM to 5 PM for Utility Installation. Cox Commercial Construction, Darren Okruhlik, 956.601.1645.

TRAVIS ST 3/11/19 to 11/11/2019TRAVIS STREET DRAINAGE PROJECT
Traffic impacts include Travis Street from San Antonio St. to Hopkins Street will be closed starting March 11, 2019 – November 2019, from 7 AM to 5 PM for Utility Installation. Cox Commercial Construction, Darren Okruhlik, 956.601.1645.

MILL STREET RECONSTRUCTION May 2019 to Fall 2019 RECONSTRUCTION OF WATERLINE SERVICES, POTHOLING
Mill Street between 500 and 700 blocks will have partial lane closure through the fall of 2019, for the reconstruction of waterline services and potholing. Phase Two Traffic Control Plan will be implemented on September 5, 2019. City of San Marcos Engineering/ CIP Dept., 512.393.8130; Smith Contracting, 512.789.5441.

HOPKINS STREET Nov. 2019 to Fall 2020 UTILITY INSTALLATION
Hopkins Street will be closed starting November 18 – the fall of 2020 for a Road Widening Project and Underground Utility Installation. Richard Reynosa 512.393.8235.

COERS STREET 10/01/2018 to 12/01/2019DRAINAGE IMPROVEMENTS
Coers Street between Old RR 12 to Owens Street will have southbound lane closure to through traffic starting October 1, 2018, to December 1, 2019, from 7 AM to 5:30 PM for drainage improvement. Denbow Company 512.264.2767.

CM ALLEN 07/25/2019 to 12/2019 RECONSTRUCTION OF ROADWAY
CM Allen between University Drive and Hopkins Street will be closed starting July 25, 2018, for the Reconstruction of the Roadway. City of San Marcos Engineering/CIP Dept. 512.393.8130.

EASTBOUND CONCHO STREET AUGUST 2018 to SUMMER 2020CONSTRUCTION
Eastbound Concho Street between LBJ and Guadalupe will be closed, LBJ and Guadalupe will also have narrow lanes between University Drive and Concho Street, starting Aug. 6, 2018 through the summer of 2020 for Construction. 3411 Builders, Inc., Richard Bagby 832.449.0328.

STUDENT CENTER DRIVE FALL 2019LBJ STUDENT CENTER EXPANSION
Student Center Drive from Matthews to the North Loading Dock of the Alkek Library will be closed until January 31, 2020. For the expansion of the LBJ Student Center. Service and delivery access to Alkek Library and Derrick Hall loading docks will be available, via Russell and Pickard Streets. Starting on August 21, 2019, Matthews Street from Russell Circle to N. LBJ Street, Elm Street, Smith Hall Parking Lot will also be closed. There will be delivery vehicle access to Russell Circle, Pickard Street, Buckner Street, and a portion of Matthews Street to serve the North Alkek Library loading dock and the Math Computer Science loading dock. All parking adjacent to Arnold Hall is closed. Texas State University 512.245.2202.


Share
Published by
Staff

Recent Posts

San Marcos City Council reviews Sidewalk Maintenance and Gap Infill Program

The San Marcos City Council received a presentation on the Sidewalk Maintenance and Gap Infill…

2 years ago

San Marcos River Rollers skate on and rebuild

The San Marcos River Rollers have skated through obstacles after taking a two-year break during…

2 years ago

After 8 Years, San Marcos Corridor News Bids Our Readers Farewell

San Marcos Corridor News has been reporting on the incredible communities in the Hays County…

2 years ago

High bacteria levels at Jacobs Well halts swimming season

Visitors won't be able to swim in the crystal clear waters of the Jacobs Well Natural…

2 years ago

Pets of the Week: Meet Sally & Nutella!

Looking to adopt or foster animals from the local shelter? Here are the San Marcos…

2 years ago

Texas still leads in workplace deaths among Hispanics

The Lone Star State leads the nation in labor-related accidents and especially workplace deaths and…

2 years ago

This website uses cookies.