The long & short term road construction projects that could affect your drive… Please use caution, drive slowly and watch for heavy equipment, construction workers, and traffic control flaggers.
LOCATION | BEGIN DATE | EST. END DATE |
CM ALLEN: One lane northbound in the 100 block of CM Allen will be closed for sidewalk construction. Shawn Wolfshohl, 512.393.8019 |
July 25 8 AM |
Apr. 2019 |
---|---|---|
THORPE LANE: The 1300 Block of Thorpe Lane will be closed for construction. KBR Builders Inc. (No contact Information Listed) |
Mar. 1 7 AM |
Mar. 31 6 PM |
ROOSEVELT STREET: Roosevelt Street from Eisenhower Street/Patton Street will have partial lane closures with flagger control for Wastewater line construction. Cox Commercial Construction, 956.601.1645 | Mar. 1 7 AM |
Mar. 30 5 PM |
CAMACHO STREET/MACARTHUR: 200 – 300 Block of Camacho Street/MacArthur St will have lane closure with flagger control for Wastewater line construction. Cox Commercial Construction, 956.601.1645 | Jan. 1 |
To be Determined |
ALABAMA STREET: 500-800 Block of Alabama Street will have lane closure with flagger control for Wastewater line construction. Cox Commercial Construction, 956.601.1645 | Mar. 1 5 PM |
Mar. 31 5 PM |
• LONG TERM — VERAMENDI STREET: Veramendi Street will be closed for utility installation. Diego Ratchford, 512.470.3325 | Mar. 1 8 AM |
May 15 5 PM |
• LONG TERM — RAILROAD STREET: Railroad Street between Eisenhower and Gomez Street will be closed for Utility Installation. Cox Commercial Construction, 956.601.1645 | Feb. 27 7 AM |
Mar. 31 5 PM |
• LONG TERM — PATTON STREET: Patton Street between Roosevelt and Wavell Street will be closed for Utility Installation. Cox Commercial Construction, 956.601.1645 | Feb. 27 7 AM |
Mar. 31 5 PM |
• LONG TERM CLOSURE — MILL STREET: Mill Street between 500 and 700 blocks will have partial lane closure through December 2018, for the reconstruction of waterline services and potholing. City of San Marcos Engineering/CIP Dept. 512.393.8130, Smith Contracting, 512.789.5441 | Dec 2018 |
Fall of 2019 |
• LONG TERM — INDIANA STREET: Indiana Street will be closed for Utility Installation. Jacob Snyder, Santa Clara Construction, 214.298.4578 |
Jan. 18 7 AM |
Feb. 25 5 PM |
• LONG TERM — CHEATHAM STREET: Cheatham Street and the 400-500 Blocks of Guadalupe will have partial lane closures for new construction. Gary Bellomy, Cheatham Street, L.P. 512.694.8839 |
Current |
July 2019 |
• LONG TERM CLOSURE — HOPKINS STREET: A portion of Hopkins St. will be closed for a road widening project and underground utility installation. Richard Reynosa, 512.393.8235 |
Nov. 2018 |
Fall 2020 |
• LONG TERM CLOSURE – STUDENT CENTER DRIVE: Student Center Drive from Matthews to the North Loading Dock of the Alkek Library will be closed for the expansion of the LBJ Student Center. Service and delivery access to Alkek Library and Derrick Hall loading docks will be available, via Russell and Pickard Streets. Texas State University, 512.245.2202 |
Current | Jan. 2020 |
• LONG TERM CLOSURE – COERS STREET: Coers Street between Old RR 12 to Owens Street will have southbound lane closure to through traffic for drainage improvement. Denbow Company, 512.264.2767 | Oct. 1 7 AM |
Mar. 31 5:30 PM |
• LONG TERM CLOSURE – CONCHO STREET: Eastbound Concho Street between LBJ and Guadalupe will be closed, LBJ and Guadalupe will also have narrow lanes between University Drive and Concho Street, through the summer of 2020 for Construction. 3411 Builders, Inc., Richard Bagby, 832.449.0328 | Aug. 2018 |
July 2020 |
• LONG TERM – SESSOM DRIVE: Sessom Drive from Aquarena Springs to ED J L Green will be closed for Waterline Installation. PROTA Construction, Kermith Garcia, 512.535.2555 |
Dec. 17 7 AM |
March 1 3 PM |
• LONG TERM – ARMSTRONG: The 100-400 blocks of Armstrong will have partial lane closures December 26- February 8, 2019 from 7 a.m. to 5 p.m. for Utility Installation. Cox Commercial Construction, Darren, 956.601.1645 | Mar. 1 7 AM |
Mar. 31 5 PM |
• LONG TERM CLOSURE – CM ALLEN PARKWAY: CM Allen between University Drive and Hopkins Street will be closed for the reconstruction of roadway. COSM Engineering/CIP Dept., 512.393.8130 | July 25 9 AM |
Apr. 2019 5 PM |
**CLOSURE EVERY SATURDAY – EAST SAN ANTONIO STREET: Half a block closed from the alley to N. LBJ every Saturday from for the Farmers Market on the Square. Main Street Program, 512.393.8430 | Every Saturday 8 AM |
Every Saturday 3 PM |
The San Marcos City Council received a presentation on the Sidewalk Maintenance and Gap Infill…
The San Marcos River Rollers have skated through obstacles after taking a two-year break during…
San Marcos Corridor News has been reporting on the incredible communities in the Hays County…
Visitors won't be able to swim in the crystal clear waters of the Jacobs Well Natural…
Looking to adopt or foster animals from the local shelter? Here are the San Marcos…
The Lone Star State leads the nation in labor-related accidents and especially workplace deaths and…
This website uses cookies.