Categories: NewsSan MarcosTraffic

Traffic Alert: Top Road Construction Projects In San Marcos Drivers Should Prepare For

The long & short term road construction projects that could affect your drive… Please use caution, drive slowly and watch for heavy equipment, construction workers, and traffic control flaggers.

 

ALERT: Traffic will have intermittent lane closure citywide for
Crosswalk and School Zone striping

ALERT: Street Maintenance Planned for the Following Neighborhoods

1. Belvin St. between Bishop and Hunter Rd. intermittent lanes closed daily 7 AM – 5 PM through September for sidewalk construction.

2. Comanche from Student Center Dr. to Sessom Dr., northbound lane closure beginning on September 4 thru September 20, 8 AM – 5 PM Garcia J. Contractors, 512.965.4274

Special Closures

EAST SAN ANTONIO STREET: Every Saturday FARMERS MARKET
Every Saturday from 7:30 AM to 3 PM Half a block of the street closed from the Alley to N. LBJ for the Farmers Market on the Square. Main Street Program., 512.393.8430

Short Term

ROOSEVELT STREET 9/01/19 to 9/30/19  WASTERWATER LINE CONSTRUCTION
Roosevelt Street from Eisenhower Street/Patton Street will have partial lane closures with flagger control starting September 1-30, 2019, from 7 AM to 5 PM for Wastewater line construction – Cox Commercial Construction 956.601.1645

CAMACHO STREET/MACARTHUR ST 9/01/19 to 9/30/19  WASTERWATER LINE CONSTRUCTION
200 – 300 Block of Camacho Street/MacArthur Street will have lane closure with flagger control starting September 1-30, 2019, from 7 AM to 5 PM for Wastewater line construction – Cox Commercial Construction 956.601.1645

ARMSTRONG ST 9/01/19 to 9/30/19 UTILITY INSTALLATION
The 100-400 blocks of Armstrong will have partial lane closures September 1-30, 2019, from 7 AM to 5 PM for Utility Installation – Cox Commercial Construction – Darren – 956.601.1645

GROVE STREET 9/23/19 to 9/27/19 UTILITY INSTALLATION
Grove Street between Guadalupe Street and LBJ Drive will be closed on September 23-27, 2019, for Electric Utility Installation Oscar DeLaCruz 512.393.8323

CHEATHAM STREET 9/23/19 to 9/27/19 UTILITY INSTALLATION
Cheatham Street between LBJ Drive and Guadalupe will be closed on September 23-27, 2019, for Electric Utility Installation Oscar DeLaCruz 512.393.8323

Long Term

SESSOM DRIVE 9/16/19 to 11/04/19 TEXAS STATE DRAINAGE PROJECT
Sessom Drive will have an eastbound lane closure from Tomas Rivera Dr. to North LBJ Starting September 16 – November 4, 2019. The Road Closure will take place between the hours of 9 AM – 4 PM during weekdays and 7 AM – 7 PM for a Texas State Drainage Project. Contact: Javier Barajas 512.913.5080

DOWNTOWN LOFTS APARTMENTS PROJECT 9/13/19 to 01/20/20 CONSTRUCTION
Traffic impacts include Fredricksburg Street at Hopkins Street to San Antonio, the southbound lane of Telephone Alley at Hopkins to San Antonio, Feltner Alley at San Antonio; will be closed due to construction starting September 13, 2019 – January 20, 2020. A.C.G. LLC 248.632.2311

ARMSTEAD 3/11/19 to 11/11/2019 TRAVIS STREET DRAINAGE PROJECT
Traffic impacts include the intersection of MLK at Armstead and Armstead from MLK to San Antonio Street will be closed starting March 11, 2019 – November 2019, from 7 AM to 5 PM for Utility Installation – Darren Okruhlik – Cox Commercial Construction – 956.601.1645

SAN ANTONIO STREET 3/11/19 to 11/11/2019 TRAVIS STREET DRAINAGE PROJECT
Traffic impacts include San Antonio Street from Travis Street to Armstead will be closed starting March 11, 2019 – November 2019, from 7 AM to 5 PM for Utility Installation – Darren Okruhlik – Cox Commercial Construction – 956.601.1645

SAN ANTONIO STREET 3/11/19 to 11/11/2019 TRAVIS STREET DRAINAGE PROJECT
Traffic impacts include Travis Street from San Antonio St. to Hopkins Street will be closed starting March 11, 2019 – November 2019, from 7 AM to 5 PM for Utility Installation – Darren Okruhlik – Cox Commercial Construction – 956.601.1645

TRAVIS ST 3/11/19 to 11/11/2019 TRAVIS STREET DRAINAGE PROJECT
Traffic impacts include Travis Street from San Antonio St. to Hopkins Street will be closed starting March 11, 2019 – November 2019, from 7 AM to 5 PM for Utility Installation – Darren Okruhlik – Cox Commercial Construction – 956.601.1645

MILL STREET RECONSTRUCTION May 2019 to Fall 2019 RECONSTRUCTION OF WATERLINE SERVICES, POTHOLING
Mill Street between 500 and 700 blocks will have partial lane closure through the fall of 2019, for the reconstruction of waterline services and potholing. Phase Two Traffic Control Plan will be implemented on September 5, 2019. City of San Marcos Engineering/ CIP Dept. 512.393.8130; Smith Contracting – 512.789.5441

HOPKINS STREET Nov. 2019 to Fall 2020 UTILITY INSTALLATION
Hopkins Street will be closed starting November 18 – the fall of 2020 for a Road Widening Project and Underground Utility Installation – Richard Reynosa – 512.393.8235

COERS STREET 10/01/2018 to 12/01/2019 DRAINAGE IMPROVEMENTS
Coers Street between Old RR 12 to Owens Street will have southbound lane closure to through traffic starting October 1, 2018, to December 1, 2019, from 7 AM to 5:30 PM for drainage improvement – Denbow Company – 512.264.2767

CM ALLEN 07/25/2019 to TBD RECONSTRUCTION OF ROADWAY
CM Allen between University Drive and Hopkins Street will be closed starting July 25, 2018, for the Reconstruction of the Roadway. City of San Marcos Engineering/ CIP Dept. 512.393.8130

EASTBOUND CONCHO STREET AUGUST 2018 to SUMMER 2020 CONSTRUCTION
Eastbound Concho Street between LBJ and Guadalupe will be closed, LBJ and Guadalupe will also have narrow lanes between University Drive and Concho Street, starting Aug. 6, 2018 through the summer of 2020 for Construction. 3411 Builders, Inc. – Richard Bagby- 832.449.0328

STUDENT CENTER DRIVE FALL 2019 LBJ STUDENT CENTER EXPANSION
Student Center Drive from Matthews to the North Loading Dock of the Alkek Library will be closed until January 31, 2020. For the expansion of the LBJ Student Center. Service and delivery access to Alkek Library and Derrick Hall loading docks will be available, via Russell and Pickard Streets. Starting on August 21, 2019, Matthews Street from Russell Circle to N. LBJ Street, Elm Street, Smith Hall Parking Lot will also be closed.  There will be delivery vehicle access to Russell Circle, Pickard Street, Buckner Street, and a portion of Matthews Street to serve the North Alkek Library loading dock and the Math Computer Science loading dock. All parking adjacent to Arnold Hall is closed. Texas State University 512.245.2202

z

Share
Published by
Staff

Recent Posts

San Marcos City Council reviews Sidewalk Maintenance and Gap Infill Program

The San Marcos City Council received a presentation on the Sidewalk Maintenance and Gap Infill…

2 years ago

San Marcos River Rollers skate on and rebuild

The San Marcos River Rollers have skated through obstacles after taking a two-year break during…

2 years ago

After 8 Years, San Marcos Corridor News Bids Our Readers Farewell

San Marcos Corridor News has been reporting on the incredible communities in the Hays County…

2 years ago

High bacteria levels at Jacobs Well halts swimming season

Visitors won't be able to swim in the crystal clear waters of the Jacobs Well Natural…

2 years ago

Pets of the Week: Meet Sally & Nutella!

Looking to adopt or foster animals from the local shelter? Here are the San Marcos…

2 years ago

Texas still leads in workplace deaths among Hispanics

The Lone Star State leads the nation in labor-related accidents and especially workplace deaths and…

2 years ago

This website uses cookies.