Categories: NewsTraffic

Traffic & Road Construction Weekly Update For January 11-17

Projects affecting San Marcos traffic January 11-17, 2015 

Posted by Staff

 

UNIVERSITY DRIVE BETWEEN N CM ALLEN & W. SESSOM DRIVE: Southbound lanes will be closed for a construction project starting through Jan. 16, 2015. Northbound lanes will be open for two-way traffic. M2 Federal Inc., 512.878.1050

LBJ BETWEEN HOPKINS & CONCHO: Downtown project on LBJ from the northern project limits to Hopkins and the LBJ/Edward Gary alleys between University and Hopkins will be closed, one block at a time, for paving and striping operations Jan. 12 – 15, 2015. Please obey all traffic detour signs as detours will change daily. CIP/ENGINEERING 512.393.8130

HUTCHISON BETWEEN LBJ & MOON: Downtown project on Hutchison between LBJ and CM Allen and the Edward Gary/Moon alley between University and Hutchison will be closed, one block at a time, for paving and striping operations Jan. 15 – 21, 2015. Please obey all traffic detour signs as detours will change daily. CIP/ENGINEERING 512.393.8130

UNIVERSITY FROM LBJ TO CM ALLEN: Full-time closure on eastbound lane on University from LBJ to CM Allen until end of January 2015 for replacement of sidewalk and curb and gutter along University. CIP/Engineering Dept., 512.393.8130

EAST SAN ANTONIO STREET: Every Saturday from 8 a.m. – 3 p.m.  Half a block of street closed from the alley to N. LBJ for the Farmers Market on the Square. Main Street Program, 512.393.8430

LONG TERM ROAD PROJECTS:

·         MOORE STREET: Moore Street is closed from Read to Holland Street until 2016 for dormitory construction. Texas State University FPDC, 512.245.2202

·         NORTH LBJ AT ACORN: Reconstruction of N LBJ will continue until end of January 2015 in conjunction with the N LBJ reconstruction project for street, sidewalk, drainage, water and wastewater improvements. Acorn Street can be accessed from Chestnut during this time period. Engineering/Capital Improvements, 512.393.8130

·         NORTH LBJ: Until Spring of 2015. Reconstruction project for street, sidewalk, drainage, water and wastewater improvements. Motorists will be detoured one way northbound on LBJ from Forest to Holland Streets and will use Chestnut as a southbound route during construction. Engineering/Capital Improvements, 512.393.8130

·         TxDOT HUNTER ROAD (FM 2439) PROJECT: Lane closures on Hunter Road between Wonder World Drive and Bishop Street for road, bridge, drainage, bicycle and pedestrian improvements through the Fall 2015. TxDOT, 512.282.2113 or City of San Marcos CIP/ Engineering, 512.393.8130.

 

Share
Published by
Staff

Recent Posts

San Marcos City Council reviews Sidewalk Maintenance and Gap Infill Program

The San Marcos City Council received a presentation on the Sidewalk Maintenance and Gap Infill…

2 years ago

San Marcos River Rollers skate on and rebuild

The San Marcos River Rollers have skated through obstacles after taking a two-year break during…

2 years ago

After 8 Years, San Marcos Corridor News Bids Our Readers Farewell

San Marcos Corridor News has been reporting on the incredible communities in the Hays County…

2 years ago

High bacteria levels at Jacobs Well halts swimming season

Visitors won't be able to swim in the crystal clear waters of the Jacobs Well Natural…

2 years ago

Pets of the Week: Meet Sally & Nutella!

Looking to adopt or foster animals from the local shelter? Here are the San Marcos…

2 years ago

Texas still leads in workplace deaths among Hispanics

The Lone Star State leads the nation in labor-related accidents and especially workplace deaths and…

2 years ago

This website uses cookies.