What To Expect On San Marcos Roads During During Week Of Sunday, Feb 18 – Saturday, Feb. 24

San Marcos’ Weekly Road Construction & Traffic Report

Short & Long Term Road Construction Projects Affecting San Marcos Traffic Sunday, February 18 – Saturday, February 24, 2018

Can’t see the whole table? Touch it and scroll right.

WEEKLY ROAD CONSTRUCTION SCHEDULE

LOCATION BEGIN DATE EST. END DATE
LP 82: Both East and West Bound Lanes will be reduced to a single lane during daytime hours. TXDOT, 512.393.8130. Feb. 19
8 AM
Feb. 23
5 PM
DURANGO STREET: Durango St. between Jaurez St and Luciano Flores Street will be closed for reclaimed waterline project. Rockin Q Construction, 512.738.6666. Oct. 30
7 AM
Mar. 2
5 PM
SAN ANTONIO ST: San Antonio Street between Wilson Street and South Johnson Ave. will be closed for utility installation. Rockin Q Construction, 512.738.6666. Feb. 12
8 AM
Feb. 16
5 PM
PATRICIA DRIVE: Patricia Drive from Broadway to Parker Drive will be partially closed for sidewalk installation. Drive slowly and watch for heavy equipment, construction workers and traffic control flaggers. Jesse Shroyer, 512.393.8036. Present
8 AM
Feb. 28
5 PM
LONG TERM CLOSURE – OAK RIDGE DRIVE: Single lane closures daily for the installation of utility mains. City of San Marcos Engineering/ CIP Dept., 512.393.8130. Present Summer
2018
LONG TERM CLOSUREWOODS STREET: A segment of Woods Street between Comanche and North Street will be closed during construction of the new Texas State University Engineering & Science Building until Aug. 2018. Project Manager Scott Rouse, 512.245.2202. Aug.
2015
Aug.
2018
LONG TERM CLOSURE – MCKIE ST: Mckie St. will be closed from the 400 Block to the 600 Block in both directions for the installation of new Water Main. Erik Pelayo, Under Ground Water Solutions Co., 512.278.9333. Dec. 1
7 AM
Mar. 8
6
PM
LONG TERM CLOSURE – MCKIE ST: Mckie St. will be closed from IH35 frontage Rd. to apartment entrance for utility installation. Rockin Q Construction, 512.738.6666. July 24
7 AM
Mar. 1
5 PM
LONG TERM CLOSURE – VISTA ST: All lanes in both directions will be closed from 310 – 312 Vista Street for utility construction. Texas State University, 512.245.2202. Present Aug. 1
2018
LONG TERM CLOSURE – SESSOM DR: Various lane closures from N. LBJ to Aquarena Springs Dr. for road construction. City of San Marcos Engineering/CIP Dept, 512.393.8130. Present March
2018
LONG TERM CLOSURE – LP 82/AQUARENA SPRINGS: TxDOT introduced a new traffic signal at the intersection of Post/Bobcat traffic will be detoured to the new signal. TxDOT, 512.393.8130. February
2017
Spring
2018
LONG TERM CLOSURE – EAST SAN ANTONIO STREET – EVERY SATURDAY: Half a block closed from the alley to N. LBJ every Saturday from for the Farmers Market on the Square. Main Street Program, 512.393.8430. Saturday
8 AM
Saturday
3 PM


 

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button