WEEKLY ROAD CONSTRUCTION SCHEDULE 
LOCATION BEGIN DATE EST. END DATE
W WOODS/N COMANCHE ST: Beginning Monday, May 15, 2017, at 7:00 a.m., Woods Street between Comanche Street and Talbot Street, as well as Woods Street between N. Guadalupe Street and N. LBJ Drive will be closed in order to facilitate underground utility work that will serve the new Engineering and Science Building. Both segments will reopen on Friday, August 18, 2017. During this closure, the Bus Stop at UAC has been temporarily relocated to the intersection of Concho Street and N. LBJ Drive. Texas State University, 512.245.2202   May 15   7 a.m.   Aug 16   4:00 p.m
 IH 35/YARRINGTON: The southbound outside main lane on IH 35, and the southbound inside lane of IH 35 Frontage Road at Yarrington, Exit ramp 210 will be closed for striping and road maintenance for the new Yarrington exit ramp July 5-6 from 7 p.m. to 7 a.m. to minimize impact on traffic. No detour needed. TxDOT, 512.587.8895     July 5      7 p.m.     July 6     7 a.m.
300 E Hutchison St: Parking area on south side of the street from Edward Gary to the east side alley will be closed for maintenance/construction from June 26 to July 3 from 6 a.m. – 6 p.m. daily, weather permitting. Joey Barbeauld, EMJ, 423.240.4738  June 26    6 a.m.    July 3   6 p.m.
N EDWARD GARY ST: All lanes in both directions will be closed for maintenance/construction for a new parking area on June 25 to July 3 from 6 a.m. – 6 p.m. daily, weather permitting. Joey Barbeauld, EMJ, 423.240.4738    June 25    6 a.m.     July 3     3 p.m.
COMANCHE ST: Northbound lane of Comanche Street from Lindsey Street to Alkek Garage closed for underground utility and site work that will serve the new Engineering and Science Building. On June 26, the north bound lane will re-open and the south bound lane will be closed until August 16. Access will be provided to Alkek and Wood Street Garages. Texas State University, 512.245.2202  May 22    7 a.m. Aug 16 2017
DALE ST: A mill and overlay project will begin on Dale St from Stokes to Perkins St. on July 11 – August 11, weather permitting. This is not a road closure but a notice to be aware of the construction zone and obey traffic control flaggers. Please park your vehicle off the street or it may be towed at your expense. City of San Marcos Street Dept., 512.393.8025     July 11         Aug 11     
316 EDWARD GARY (ALLEY): A complete road closure until July 14 will be in effect for the alley behind 316 Edward Gary between Hutchison and University Drive for water utility work and street maintenance. City of San Marcos Streets Dept., 512.393.8025 July 1 July 14
LONG TERM CLOSURE – VISTA ST: All lanes in both directions will be closed from 310 – 312 Vista Street for utility construction until July 31, 2018. Texas State University, 512.245.2202 Present    Aug    2018
LONG TERM CLOSURE – SESSOM DR: Various lane closures from N. LBJ to Aquarena Springs Dr. will run through January 2018 for road construction. City of San Marcos Engineering/CIP Dept., 512.393.8130 Present Jan 2018
LONG TERM CLOSURE – N LBJ:  From Holland St. to Camaro Way will be closed to through traffic until the summer of 2017. Road closure will occur during daytime construction hours. City contractor will be replacing utility lines in the area. Through traffic including Emergency Vehicles, will be routed around the project limits; please follow the detours. Engineering/Capital Improvements, 512.393.8130 Present Summer 2017
LONG TERM CLOSURE – WOODS ST: A segment of Woods St between Comanche and North Street will be closed during construction of the new Texas State University Engineering & Science Building beginning Monday, August 15 until August 2018. Project Manager Scott Rouse, 512.245.2202 August 2016 August 2018
LONG TERM CLOSURE – EAST SAN ANTONIO STREET – EVERY SATURDAY: Half a block closed from the alley to N. LBJ every Saturday from 8 a.m. – 3 p.m. for the Farmers Market on the Square. Main Street Program, 512.393.8430 Year  Round Year Round

 

Share
Published by
Staff

Recent Posts

San Marcos City Council reviews Sidewalk Maintenance and Gap Infill Program

The San Marcos City Council received a presentation on the Sidewalk Maintenance and Gap Infill…

2 years ago

San Marcos River Rollers skate on and rebuild

The San Marcos River Rollers have skated through obstacles after taking a two-year break during…

2 years ago

After 8 Years, San Marcos Corridor News Bids Our Readers Farewell

San Marcos Corridor News has been reporting on the incredible communities in the Hays County…

2 years ago

High bacteria levels at Jacobs Well halts swimming season

Visitors won't be able to swim in the crystal clear waters of the Jacobs Well Natural…

2 years ago

Pets of the Week: Meet Sally & Nutella!

Looking to adopt or foster animals from the local shelter? Here are the San Marcos…

2 years ago

Texas still leads in workplace deaths among Hispanics

The Lone Star State leads the nation in labor-related accidents and especially workplace deaths and…

2 years ago

This website uses cookies.