Short & Long Term Road Construction Projects Affecting San Marcos Traffic Sunday, June 10, 2018
Please use caution, drive slowly and watch for heavy equipment,
construction workers, and traffic control flaggers.
LOCATION | BEGIN DATE | EST. END DATE |
---|---|---|
WOODS STREET: The northeast corner of Woods street and North LBJ Dr. will have a single northbound lane closure. No contact information given. |
June 15 8:00 AM |
June 29 5 PM |
UHLAND ROAD: Uhland Road from IH35 Frontage Rd. to River Road at Aquarena Springs will have a moving temporary lane closure. Watch for heavy equipment, construction workers, and traffic control flaggers. Lomes Petty – 281.725.0359 | June 8 9 AM |
June 15 5 PM |
OLD SETTLERS: Old Settlers from Blanco Vista to Easton Dr. will undergo construction. The street will remain open to traffic, please use caution and drive slowly. Watch for heavy equipment, construction workers, and traffic control flaggers. All vehicles be parked off-street or, they may be towed at the owner’s own expense. Jesse Shroyer – 512.393.8036 | June 7 7 AM |
July 13 4 PM |
LUCIANO FLORES: Luciano Flores from Cape to the IH 35 Frontage Road will be closed for Utility Installation. Rockin Q Construction – 512.738.6666 | June 1 8 AM |
June 15 5 PM |
DURANGO STREET: Durango Street between Juarez Street and Monterrey Street will be closed for a reclaimed waterline project. Rockin Q Construction – 512.738.6666 | Oct. 30 8 AM |
June 30 5 PM |
CHARLES AUSTIN: Charles Austin will be closed for various High School Graduation. Richard Mizanin – 512.754.2205 |
June 8 8 AM |
June 8 9 PM |
LP 82: Both the East & Westbound lanes will be reduced to a single lane during daytime hours. TxDOT – 512.393.8130 |
June 11 9 PM |
June 16 3:30 PM |
• LONG TERM CLOSURE – STUDENT CENTER DRIVE: Student Center Drive from Matthews to the North Loading Dock of the Alkek Library will be closed for the expansion of the LBJ Student Center. Service and delivery access to Alkek Library and Derrick Hall loading docks will be available, via Russell and Pickard Streets. Texas State University – 512.245.2202 |
Current | Jan. 21 2020 |
• LONG TERM CLOSURE – CRADDOCK AVENUE: Craddock Avenue between Old Ranch Road 12 and Bishop Street will have partial lane closures for median work. Community Enhancement, Amy Kirwin – 512.393.8419 | Current 8 AM |
Sept. 30 4 PM |
• LONG TERM CLOSURE – CHEATHAM STREET & GUADALUPE: Cheatham Street and the 400-500 Blocks of Guadalupe will have partial lane closures for new construction. Gary Bellomy, Cheatham Street, L.P. – 512.694.8839 | Present | Dec. 31 2018 |
• LONG TERM CLOSURE – OAK RIDGE DRIVE: Single lane closures daily for the installation of utility mains. City of San Marcos Engineering/CIP Dept. – 512.393.8130 | Present | Summer 2018 |
• LONG TERM CLOSURE – WOODS STREET: A segment of Woods Street between Comanche and North Street will be closed during construction of the new Texas State University Engineering & Science Building. Project Manager Scott Rouse – 512.245.2202 | Aug. 2015 |
Aug. 2018 |
• LONG TERM CLOSURE – MCKIE STREET: Mckie St. will be closed from IH-35 Frontage Rd. to apartment entrance for utility installation. Rockin Q Construction – 512.738.6666 | Current 8 AM |
Dec. 7 5 PM |
• LONG TERM CLOSURE – MCKIE STREET: Mckie Street between the 400 and 600 blocks will be closed in both directions for the installation of a new water main. Erik Pelayo, Under Ground Water Solutions Co. – 512.278.9333 | Jan. 8 7 AM |
June 30 6 PM |
• LONG TERM CLOSURE – VISTA ST: All lanes in both directions will be closed from 310 – 312 Vista Street for utility construction. Texas State University – 512.245.2202 | Present | Aug. 1 2018 |
• LONG TERM CLOSURE – LP 82/AQUARENA SPRINGS: TxDOT introduced a new traffic signal at the intersection of Post/Bobcat traffic will be detoured to the new signal. TxDOT – 512.393.8130 | February 2017 |
Completion Date TBD/2018 |
** CLOSURE EVERY SATURDAY – EAST SAN ANTONIO STREET: Half a block closed from the alley to N. LBJ every Saturday from for the Farmers Market on the Square. Main Street Program – 512.393.8430 | Every Saturday 8 AM |
Every Saturday 3 PM |
The San Marcos City Council received a presentation on the Sidewalk Maintenance and Gap Infill…
The San Marcos River Rollers have skated through obstacles after taking a two-year break during…
San Marcos Corridor News has been reporting on the incredible communities in the Hays County…
Visitors won't be able to swim in the crystal clear waters of the Jacobs Well Natural…
Looking to adopt or foster animals from the local shelter? Here are the San Marcos…
The Lone Star State leads the nation in labor-related accidents and especially workplace deaths and…
This website uses cookies.