San Marcos’ Weekly Road Construction & Traffic Report
Short & Long Term Road Construction Projects Affecting San Marcos Traffic Sunday, October 15 – Saturday, October 21, 2017
Can’t see the whole table? Touch it and scroll right.
LOCATION | BEGIN DATE | EST. END DATE |
---|---|---|
HOFHEINZE STREET: Please watch for heavy equipment and construction workers on the street. Please park vehicles off the street or it may be towed at your own expense. Please drive slowly, use caution in the work zone and obey traffic control flagmen. City of San Marcos Street Dept., 512.393.8025 | Oct. 17 8 PM | Nov. 17 6 AM |
LP 82/AQUARENA SPRINGS: LP 82/Aquarena Springs between Charles Austin Dr. to Post Road will have single lane closure. TxDOT 512. 832.7027. | Oct. 16 9 PM | Oct. 20 3:30 PM |
BISHOP ST: 200 Block of N Bishop will have west side lane closure with flagger control for utility work on west side lane. One lane will be shut down with flagger. Centurylink 512.754.5223 | Oct. 2 4 PM | Oct. 28 8 PM |
OAK HEIGHTS NEIGHBORHOOD SLURRY SEAL STREET RESURFACING PROJECT: Please watch for heavy equipment and construction workers on the street. Be aware of temporary street closures and detours. Door hangers will be distributed 24 hours prior to the resurfacing of your street. Please park vehicles off the street or it may be towed at your own expense. Please drive slowly, use caution in the work zone and obey traffic control flagmen. City of San Marcos Street Dept., 512.393.8025. | Sept. 29 | Oct. 21 |
SOUTHWEST HILLS NEIGHBORHOOD SLURRY SEAL STREET RESURFACING PROJECT: Please watch for heavy equipment and construction workers on the street. Be aware of temporary street closures and detours. Door hangers will be distributed 24 hours prior to the resurfacing of your street. Please park vehicles off the street or it may be towed at your own expense. Please drive slowly, use caution in the work zone and obey traffic control flagmen. City of San Marcos Street Dept., 512.393.8025. | Sept. 29 | Oct. 21 |
HOLLAND HILLS NEIGHBORHOOD SLURRY SEAL STREET RESURFACING PROJECT: Please watch for heavy equipment and construction workers on the street. Be aware of temporary street closures and detours. Door hangers will be distributed 24 hours prior to the resurfacing of your street. Please park vehicles off the street or it may be towed at your own expense. Please drive slowly, use caution in the work zone and obey traffic control flagmen. City of San Marcos Street Dept., 512.393.8025. | Sept. 29 | Oct. 21 |
BROADWAY STREET/SUNSET ACRES NEIGHBORHOOD SLURRY SEAL STREET RESURFACING PROJECT: Please watch for heavy equipment and construction workers on the street. Be aware of temporary street closures and detours. Door hangers will be distributed 24 hours prior to the resurfacing of your street. Please park vehicles off the street or it may be towed at your own expense. Please drive slowly, use caution in the work zone and obey traffic control flagmen. City of San Marcos Street Dept., 512.393.8025. | Sept. 29 | Oct. 21 |
BISHOP ST: Bishop St. from Belvin St. to Prospect St. will be closed for electricity utility work. Traffic will be detoured to Clara St. SMEU, 512-393-8300. | Oct. 17 7 AM | Oct. 18 4 PM |
IH 35 FRONTAGE ROAD: IH 35 Frontage Road between Loop 82 and SH 80 will be shut down for railroad crossing re planking. TxDOT Contact: Henry Ramirez 512-574-2025. | Oct. 24 9 PM | Oct. 25 5 AM |
POST ROAD: The Blanco River Bridge was closed on July 24 for new bridge construction. Traffic needs to detour to alternative routes. Hays County. | July 24 | NOT LISTED |
STAPLES RD: Staples Rd. will be closed on both sides of Broadway for Utility installation. Rockin Q Construction 512.738.6666 | Oct. 7 7 AM | Oct. 20 5 PM |
LONG TERM CLOSURE – MCKIE ST: Mckie St. will be closed from IH–35 frontage Rd. to apartment entrance for utility installation. Rockin Q Construction 512.738.6666 | July 24 7 AM | Dec. 1 5 PM |
LONG TERM CLOSURE – VISTA ST: All lanes in both directions will be closed from 310 – 312 Vista Street for utility construction Texas State University, 512.245.2202. | Present | July 31 2018 |
LONG TERM CLOSURE – SESSOM DR: Various lane closures from N. LBJ to Aquarena Springs Dr. for road construction. City of San Marcos Engineering/CIP Dept., 512.393.8130. | Present | Jan. 2018 |
LONG TERM CLOSURE – N LBJ: From Holland St. to Camaro Way, this road closure will occur during daytime construction hours. City contractor will be replacing utility lines in the area. Through traffic including Emergency Vehicles, will be routed around the project limits; please follow the detours. Engineering/Capital Improvements, 512.393.8130. | Present | End of Fall 2017 |
LONG TERM CLOSURE – WOODS ST: A segment of Woods St between Comanche and North Street will be closed during construction of the new Texas State University Engineering & Science Building. Project Manager Scott Rouse, 512.245.2202. | August 2015 | August 2018 |
LP 82/AQUARENA SPRINGS: TxDOT introduced a new traffic signal at the intersection of Post/Bobcat traffic will be detoured to the new signal. TxDOT, 512.393.8130. | Feb. 2017 | Spring 2018 |
LONG TERM CLOSURE – EAST SAN ANTONIO STREET – EVERY SATURDAY: Half a block closed from the alley to N. LBJ every Saturday from 8 a.m. – 3 p.m. for the Farmers Market on the Square. Main Street Program, 512.393.8430. | N/A | N/A |
The San Marcos City Council received a presentation on the Sidewalk Maintenance and Gap Infill…
The San Marcos River Rollers have skated through obstacles after taking a two-year break during…
San Marcos Corridor News has been reporting on the incredible communities in the Hays County…
Visitors won't be able to swim in the crystal clear waters of the Jacobs Well Natural…
Looking to adopt or foster animals from the local shelter? Here are the San Marcos…
The Lone Star State leads the nation in labor-related accidents and especially workplace deaths and…
This website uses cookies.