Staff
The short & long term road construction projects that could affect your drive… Please use caution, drive slowly, and watch for heavy equipment, construction workers, and traffic control flaggers.
EVERY SATURDAY — Half a block of the street is closed from the Alley to N. LBJ for the Farmers Market on the Square. Main Street Program 512.393.8430.
.
Hopkins Street between Bishop Street and Moore Street will be closed to vehicle and pedestrian traffic for a Street Reconstruction Project. Traffic will be detoured to Craddock at both ends of the project, with only local traffic allowed. Phase 4 is underway with local traffic closures from Blanco to Moore Street. The overall completion of the project is anticipated by Spring 2022. For more information call Richard Reynosa with the City of San Marcos Engineering Department at 512.393.8235.
Sidewalk closed from Guadalupe Street at Martin Luther King Drive to the railroad crossing for reconstruction. Also, a single lane closure at Hopkins Street at Guadalupe Street. Completion is expected by end of summer 2021. For information call New Age General Contractors, Inc. at 830.560.9077.
West Sessom Drive from LBJ Drive to Canyon Road will have single-lane closures for Boring Operations – Diego Ratchford – 512.250.8310.
1300 and 1400 Blocks of Uhland Road will be closed to vehicle and pedestrian traffic for a Road Reconstruction Project. For more information call Todd Keltgen at 512.212.7990.
The sidewalk at Dolly Street and Archie Street will be closed for Repair – City of San Marcos Public Works Department- 512.393.8036.
Broadway Street at the IH 35 Frontage Road will be closed for a Utility Line Connection – Luis Vasquez – Webber Construction – 346.305.1935.
Martin Luther King Drive between Guadalupe Street and Fredericksburg Street will be closed. Dan McReynolds – McReynolds Co LLC – 254.723.7658.
MILESTONE 2 | STARTING JANUARY 5, 2022
The South Bound Frontage Road will be closed at CM Allen Parkway to McKie Street with all traffic detoured through CM Allen Parkway to Cheatham Street and down Guadalupe Street for a Texas Department of Transportation Road Reconstruction Project. – Mike Harlin – TXDOT Construction Project Manager – 512.487.9501.
IH-35 NORTHBOUND FRONTAGE ROAD | MAY 23, 2022 – JULY 2022
The IH-35 Northbound Frontage Road between Luciano Flores Street and River Road will be closed for TxDOT Roadway Reconstruction- Rohit Vij- 512.393.8133.
The San Marcos City Council received a presentation on the Sidewalk Maintenance and Gap Infill…
The San Marcos River Rollers have skated through obstacles after taking a two-year break during…
San Marcos Corridor News has been reporting on the incredible communities in the Hays County…
Visitors won't be able to swim in the crystal clear waters of the Jacobs Well Natural…
Looking to adopt or foster animals from the local shelter? Here are the San Marcos…
The Lone Star State leads the nation in labor-related accidents and especially workplace deaths and…
This website uses cookies.