• REOCCURRING CLOSURES •
EAST SAN ANTONIO STREET — FARMERS MARKET | 7:30 AM – 3 PM
EVERY SATURDAY — Half a block of the street is closed from the Alley to N. LBJ for the Farmers Market on the Square. Main Street Program 512.393.8430.
.
• CURRENT CONSTRUCTION PROJECTS •
HOPKINS STREET | MAY 2020 — SPRING OF 2022
Hopkins Street between Bishop Street and Moore Street will be closed to vehicle and pedestrian traffic for a Street Reconstruction Project. Traffic will be detoured to Craddock at both ends of the project, with only local traffic allowed. Phase 4 is underway with local traffic closures from Blanco to Moore Street. The overall completion of the project is anticipated by Spring 2022. For more information call Richard Reynosa with the City of San Marcos Engineering Department at 512.393.8235.
GUADALUPE STREET IMPROVEMENTS | CURRENT
Sidewalk closed from Guadalupe Street at Martin Luther King Drive to the railroad crossing for reconstruction. Also, a single lane closure at Hopkins Street at Guadalupe Street. Completion is expected by end of summer 2021. For information call New Age General Contractors, Inc. at 830.560.9077.
WEST SESSOMS DRIVE | AUGUST 2021 – AUGUST 2023
West Sessom Drive from LBJ Drive to Canyon Road will have single-lane closures for Boring Operations – Diego Ratchford – 512.250.8310.
UHLAND ROAD | MARCH 1, 2022 — MAY 20, 2022
1300 and 1400 Blocks of Uhland Road will be closed to vehicle and pedestrian traffic for a Road Reconstruction Project. For more information call Todd Keltgen at 512.212.7990.
DOLLY STREET | JUNE 13 9 – JULY 15, 2022
The sidewalk at Dolly Street and Archie Street will be closed for Repair – City of San Marcos Public Works Department- 512.393.8036.
Broadway Street at the IH 35 Frontage Road will be closed for a Utility Line Connection – Luis Vasquez – Webber Construction – 346.305.1935.
Martin Luther King Drive between Guadalupe Street and Fredericksburg Street will be closed. Dan McReynolds – McReynolds Co LLC – 254.723.7658.
IH-35 FRONTAGE ROAD | SEPTEMBER 2021 – EARLY 2025
MILESTONE 2 | STARTING JANUARY 5, 2022
The South Bound Frontage Road will be closed at CM Allen Parkway to McKie Street with all traffic detoured through CM Allen Parkway to Cheatham Street and down Guadalupe Street for a Texas Department of Transportation Road Reconstruction Project. – Mike Harlin – TXDOT Construction Project Manager – 512.487.9501.
IH-35 NORTHBOUND FRONTAGE ROAD | MAY 23, 2022 – JULY 2022
The IH-35 Northbound Frontage Road between Luciano Flores Street and River Road will be closed for TxDOT Roadway Reconstruction- Rohit Vij- 512.393.8133.