Categories: NewsSan MarcosTraffic

San Marcos Traffic Signal Work Scheduled At IH-35/SH 80

The work will modify traffic signal phasing to improve signal operations at the displaced-left interchange.  

San Marcos City crews and contractors will conduct traffic signals improvements at the intersection of IH-35 and SH 80 on Sunday, Jan. 14 from 8  – 11 p.m.

The work will modify traffic signal phasing to improve signal operations at the displaced-left interchange.

The traffic signals may be on flash or dark intermittently during this work, and drivers may experience delays. If so, drivers should treat the intersection as a four-way stop.

In December, the City of San Marcos assumed traffic signal maintenance  of the two Displaced-Left Interchanges in San Marcos at IH 35/SH 80 and IH 35/Lp 82.  These two major intersections accommodate over 30,000 vehicles per day.

For more information, contact the San Marcos Public Services-Transportation Department at 512.393.8036.


 

Share
Published by
Staff

Recent Posts

San Marcos City Council reviews Sidewalk Maintenance and Gap Infill Program

The San Marcos City Council received a presentation on the Sidewalk Maintenance and Gap Infill…

2 years ago

San Marcos River Rollers skate on and rebuild

The San Marcos River Rollers have skated through obstacles after taking a two-year break during…

2 years ago

After 8 Years, San Marcos Corridor News Bids Our Readers Farewell

San Marcos Corridor News has been reporting on the incredible communities in the Hays County…

2 years ago

High bacteria levels at Jacobs Well halts swimming season

Visitors won't be able to swim in the crystal clear waters of the Jacobs Well Natural…

2 years ago

Pets of the Week: Meet Sally & Nutella!

Looking to adopt or foster animals from the local shelter? Here are the San Marcos…

2 years ago

Texas still leads in workplace deaths among Hispanics

The Lone Star State leads the nation in labor-related accidents and especially workplace deaths and…

2 years ago

This website uses cookies.