Traffic Alert: Weekly Posey Road, I-35 Closures & Detours

TxDOT knows you’ve got to get where you need to go.

While construction is tough on everyone, TxDOT is trying to do
everything they can to minimize disruptions.

35 CORRIDOR MOBILITY CAPITAL AREA

Closures, Detours, Traffic Alerts

for Week of August 31 – September 6

Z

I-35 AT POSEY ROAD

PROJECT OVERVIEW | This project will construct a new overpass on I-35 over Posey Road, add two new U-turns in each direction at Posey Road, perform ramp reversals and convert two-way frontage roads to one-way.

Currently, the I-35 mainlanes go under Posey Road. The new configuration will have the I-35 mainlanes going over Posey Road.

THIS WEEK’S PROJECT TRAFFIC ADVISORY

Closures are weather permitting

 

  • Southbound I-35 frontage road temporarily converted to a two-way configuration between Posey Road and York Creek Road. The frontage road just north of H&H Industrial Park will be closed to through traffic. | Friday, Sept. 6 at 9 PM through Monday, Sept 9 at 5 AM

 

  • Northbound I-35 exit ramps at Posey Road (#199) and Centerpoint Road (#200) are closed. The southbound I-35 entrance ramp south of Posey Road is also closed. | Until further notice

 

  • Posey Road closed at I-35. | Until further notice

Read more on construction phasing and additional project details HERE.

 

I-35 FROM STASSNEY LANE TO WILLIAM CANNON DRIVE

PROJECT OVERVIEW | The project will reconstruct the bridge structures at Stassney Lane and William Cannon Drive, as well as the frontage road bridge over Williamson Creek.

New U-turn bridges will be added in both directions at Stassney Lane and William Cannon Drive, and the I-35 mainlanes will be widened to incorporate shoulders and extended entrance/exit lanes to allow for better merging.

Bicycle and pedestrian enhancements are also being made, and new safety lighting is being installed.

THIS WEEK’S PROJECT TRAFFIC ADVISORY

Closures are weather permitting

  • Southbound I-35 frontage road right lane closed daily at Little Texas Lane. | Tuesday, Sept. 3 through Friday, Sept. 6 from 9 AM until 3 PM

 

  • Northbound I-35 frontage road left lane closed nightly at Slaughter Lane. The Slaughter Lane exit ramp will also be closed. | Tuesday, Sept. 3 through Friday, Sept. 6 from 8 PM until 5 AM

 

  • Northbound I-35 left two lanes closed from Stassney Lane to Woodward Street. | Tuesday, Sept. 3 from 9 PM until 5 AM

 

  • Southbound I-35 left lane closed at Stassney Lane. | Tuesday, Sept. 3 from 10 PM until 6 AM

 

  • Southbound I-35 right two lanes closed at Stassney Lane. The Stassney Lane entrance ramp will also be closed. | Wednesday, Sept. 4 from 10 PM until 6 AM

Read more on construction phasing and additional project details HERE.

I-35 AT OLTORF ST.

PROJECT OVERVIEW | Improvements include the reconstruction of the Oltorf Street bridge, improving entrance/exit ramps and frontage roads.

Additionally, construction of new extended entrance/exit lanes for mainlanes and ramps, and adding U-turns in both directions at Oltorf Street.

Bicycle and pedestrian enhancements will also be made along the I-35 frontage roads in each direction within the project limits.

THIS WEEK’S PROJECT TRAFFIC ADVISORY

Closures are weather permitting

  • Southbound I-35 frontage road left lane closed daily at St. Edwards Drive. | Tuesday, Sept. 3 through Wednesday, Sept. 4 from 9 AM until 3 PM

 

  • Southbound I-35 frontage road left lane closed daily from Mariposa Drive to Oltorf Street. | Tuesday, Sept. 3 through Wednesday, Sept. 4 from 9 AM until 3 PM

 

  • Northbound I-35 frontage road left lane closed daily from SH 71 to Woodward Street. | Tuesday, Sept. 3 through Friday, Sept. 6 from 9 AM until 3 PM

Read more on construction phasing and additional project details HERE.

I-35 FROM RUNDBERG LN. TO US 290 EAST

PROJECT OVERVIEW | This project includes main-lanes and frontage road reconstruction and the addition of three new flyovers at US 183.

The project also includes reconstruction of the St. Johns Avenue Bridge, the addition of frontage road U-turns on both sides, intersection bypass lanes under St. Johns Avenue in both directions, extended entrance/exit lanes, and ramp and shoulder improvements.

THIS WEEK’S PROJECT TRAFFIC ADVISORY

Closures are weather permitting

  • Northbound I-35 reduced to one lane nightly from Rundberg Lane to Rutherford Lane. | Tuesday, Sept. 3 through Thursday, Sept. 5 from 9 PM until 5 AM

 

  • North and southbound I-35 reduced to one lane nightly at US 183. | Tuesday, Sept. 3 through Thursday, Sept. 5 from 9 PM until 5 AM

 

  • Southbound I-35 frontage road reduced to one lane nightly at Providence Avenue. | Tuesday, Sept. 3 through Thursday, Sept. 5 from 9 PM until 5 AM

 

  • Northbound I-35 left two lanes closed nightly from US 290 East to St. Johns Avenue. | Wednesday, Sept. 4 through Thursday, Sept. 5 from 10 PM until 5 AM

Read more on construction phasing and additional project details HERE.

I-35 FROM 1431 TO FM 3406

PROJECT OVERVIEW | The intersection of FM 3406 and the I-35 frontage roads are being improved, and the FM 3406 bridge over I-35 is being reconstructed.

The FM 3406 (Old Settlers Blvd) bridge will close to eastbound traffic. Westbound traffic will detour to the newly constructed U-turn Bridge.

THIS WEEK’S PROJECT TRAFFIC ADVISORY

Closures are weather permitting

  • Northbound I-35 frontage road reduced to one lane from FM 3406 (Old Settlers Boulevard) to RM 1431 (University Boulevard) | Through late 2020

Read more on construction phasing and additional project details HERE.

I-35 FROM US 79 TO SH 45 NORTH

PROJECT ACTIVITY | New braided ramps (where one ramp crosses over the other) are being constructed along the northbound I-35 mainlanes between Hesters Crossing and RM 620 to eliminate merging conflicts.

THIS WEEK’S PROJECT TRAFFIC ADVISORY

Closures are weather permitting

  • Northbound I-35 reduced to one lane nightly from Hesters Crossing to US 79. | Sunday, Aug. 25 through Monday, Aug. 26 from 9 PM until 5 AM

Read more on construction phasing and additional project details HERE.

I-35 AT PARMER LANE

PROJECT OVERVIEW | Reduced congestion, improved mobility at Parmer Lane and Lamar Boulevard, operational efficiency, more reliable travel times, lower fuel consumption. The start date is summer 2019 and is schedule to be completed summer of 2021. The construction costs are estimated to be $24.6 million.

THIS WEEK’S PROJECT TRAFFIC ADVISORY

Closures are weather permitting

 

  • Northbound I-35 frontage road left two lanes closed at Parmer Lane. | Tuesday, Sept. 3 from 9 PM until 5 AM

Read more on construction phasing and additional project details HERE.

I-35 CORRIDOR MAINTENANCE CLOSURES & DETOURS

PROJECT OVERVIEW | These lane closures are associated with ongoing maintenance activities throughout the corridor.

THIS WEEK’S PROJECT TRAFFIC ADVISORY

Closures are weather permitting

  • Southbound I-35 reduced to one lane nightly for paving from the Bell County line to SH 195. | Tuesday, Sept. 3 through Wednesday, Sept. 4 from 8 PM until 5:30 AM

 

  • Northbound I-35 left two lanes closed from Hesters Crossing to US 79. | Wednesday, Sept. 4 from 9 PM until 5 AM

 

  • Northbound I-35 reduced to one lane nightly from Kyle Crossing to Cabela’s Drive. Ramps will also be closed as needed. | Tuesday, Sept. 3 through Wednesday, Sept. 4 from 9 PM until 5 AM

Read more on construction phasing and additional project details HERE.

 

St. Johns Avenue Bridge Long-Term Closure

Crews have closed the St. Johns Avenue bridge over the I-35 mainlanes. All traffic on St. Johns Avenue will turn right onto the I-35 frontage roads and utilize the non-signalized U-turns at US 183 or US 290 East to access St. Johns Avenue on the other side of I-35.

Bicyclists and pedestrians will still be able to safely cross I-35 at St. Johns Avenue on a temporary walkway restricted to non-vehicular traffic. The reconstructed bridge is expected to reopen late summer 2019, weather permitting.

 

 


My I35 Traffic Alerts are provided by Central Texas Regional Mobile Authority (CTRMA) & TxDOT.


Share
Published by
Staff

Recent Posts

San Marcos City Council reviews Sidewalk Maintenance and Gap Infill Program

The San Marcos City Council received a presentation on the Sidewalk Maintenance and Gap Infill…

2 years ago

San Marcos River Rollers skate on and rebuild

The San Marcos River Rollers have skated through obstacles after taking a two-year break during…

2 years ago

After 8 Years, San Marcos Corridor News Bids Our Readers Farewell

San Marcos Corridor News has been reporting on the incredible communities in the Hays County…

2 years ago

High bacteria levels at Jacobs Well halts swimming season

Visitors won't be able to swim in the crystal clear waters of the Jacobs Well Natural…

2 years ago

Pets of the Week: Meet Sally & Nutella!

Looking to adopt or foster animals from the local shelter? Here are the San Marcos…

2 years ago

Texas still leads in workplace deaths among Hispanics

The Lone Star State leads the nation in labor-related accidents and especially workplace deaths and…

2 years ago

This website uses cookies.