What To Expect On San Marcos Roads During During Week Of Sunday, Feb 18 – Saturday, Feb. 24

San Marcos’ Weekly Road Construction & Traffic Report

Short & Long Term Road Construction Projects Affecting San Marcos Traffic Sunday, February 18 – Saturday, February 24, 2018

Can’t see the whole table? Touch it and scroll right.

WEEKLY ROAD CONSTRUCTION SCHEDULE

LOCATION BEGIN DATE EST. END DATE
LP 82: Both East and West Bound Lanes will be reduced to a single lane during daytime hours. TXDOT, 512.393.8130. Feb. 19
8 AM
Feb. 23
5 PM
DURANGO STREET: Durango St. between Jaurez St and Luciano Flores Street will be closed for reclaimed waterline project. Rockin Q Construction, 512.738.6666. Oct. 30
7 AM
Mar. 2
5 PM
SAN ANTONIO ST: San Antonio Street between Wilson Street and South Johnson Ave. will be closed for utility installation. Rockin Q Construction, 512.738.6666. Feb. 12
8 AM
Feb. 16
5 PM
PATRICIA DRIVE: Patricia Drive from Broadway to Parker Drive will be partially closed for sidewalk installation. Drive slowly and watch for heavy equipment, construction workers and traffic control flaggers. Jesse Shroyer, 512.393.8036. Present
8 AM
Feb. 28
5 PM
LONG TERM CLOSURE – OAK RIDGE DRIVE: Single lane closures daily for the installation of utility mains. City of San Marcos Engineering/ CIP Dept., 512.393.8130. Present Summer
2018
LONG TERM CLOSUREWOODS STREET: A segment of Woods Street between Comanche and North Street will be closed during construction of the new Texas State University Engineering & Science Building until Aug. 2018. Project Manager Scott Rouse, 512.245.2202. Aug.
2015
Aug.
2018
LONG TERM CLOSURE – MCKIE ST: Mckie St. will be closed from the 400 Block to the 600 Block in both directions for the installation of new Water Main. Erik Pelayo, Under Ground Water Solutions Co., 512.278.9333. Dec. 1
7 AM
Mar. 8
6
PM
LONG TERM CLOSURE – MCKIE ST: Mckie St. will be closed from IH35 frontage Rd. to apartment entrance for utility installation. Rockin Q Construction, 512.738.6666. July 24
7 AM
Mar. 1
5 PM
LONG TERM CLOSURE – VISTA ST: All lanes in both directions will be closed from 310 – 312 Vista Street for utility construction. Texas State University, 512.245.2202. Present Aug. 1
2018
LONG TERM CLOSURE – SESSOM DR: Various lane closures from N. LBJ to Aquarena Springs Dr. for road construction. City of San Marcos Engineering/CIP Dept, 512.393.8130. Present March
2018
LONG TERM CLOSURE – LP 82/AQUARENA SPRINGS: TxDOT introduced a new traffic signal at the intersection of Post/Bobcat traffic will be detoured to the new signal. TxDOT, 512.393.8130. February
2017
Spring
2018
LONG TERM CLOSURE – EAST SAN ANTONIO STREET – EVERY SATURDAY: Half a block closed from the alley to N. LBJ every Saturday from for the Farmers Market on the Square. Main Street Program, 512.393.8430. Saturday
8 AM
Saturday
3 PM


 

Share
Published by
Staff

Recent Posts

San Marcos City Council reviews Sidewalk Maintenance and Gap Infill Program

The San Marcos City Council received a presentation on the Sidewalk Maintenance and Gap Infill…

2 years ago

San Marcos River Rollers skate on and rebuild

The San Marcos River Rollers have skated through obstacles after taking a two-year break during…

2 years ago

After 8 Years, San Marcos Corridor News Bids Our Readers Farewell

San Marcos Corridor News has been reporting on the incredible communities in the Hays County…

2 years ago

High bacteria levels at Jacobs Well halts swimming season

Visitors won't be able to swim in the crystal clear waters of the Jacobs Well Natural…

2 years ago

Pets of the Week: Meet Sally & Nutella!

Looking to adopt or foster animals from the local shelter? Here are the San Marcos…

2 years ago

Texas still leads in workplace deaths among Hispanics

The Lone Star State leads the nation in labor-related accidents and especially workplace deaths and…

2 years ago

This website uses cookies.