183 South scheduled road construction, closures, detours for week of July 19

Staff Report

Austin — Short and long-term lane, road closures, and detours that may impact drivers along US 183 and adjacent roadways in east Austin.

Below is an overview of the 183 South project’s lane, road, and ramp closures. Work continues along US 183, including bridge construction, roadway installation, sound wall work, utility work.

The Central Texas Regional Mobility Authority is an independent government agency created in 2002 to improve the transportation system in Williamson and Travis counties.

The Mobility Authority is overseen by a seven-member Board of Directors. The Governor appoints the Chairman, and the Travis and Williamson counties Commissioners Courts each appoint three members to serve on the Board.

.

US 183 Short & Long Term Closures & Detours

*Dates are subject to change based on weather and other circumstances.

..

Short Term

LANE CLOSURE — 7/14/21 to 7/17/21 — PAVING
Friday (7/16) 8 p.m. to 8 a.m., US 183 southbound main lanes will be reduced to one lane from Loyola to US 290.

LANE CLOSURE — 7/14/21 to 7/17/21 — BRIDGE CONSTRUCTION
Friday (7/14-7/16) 8 p.m. to 6 a.m., Northbound US 183 left main lane exit to Airport, westbound 7th, and Cesar Chavez will be closed.

LANE CLOSURE — 7/16/21 to 7/18/21 — ROADWAY STRIPING
Friday (7/16) 7 a.m. to 3 p.m., Saturday (7/17) 12 p.m. to 6 p.m., Sunday (7/18) 12 p.m. to 6 p.m., Mobile Ops: US 183 southbound one main lane will be closed from US 290 to SH 71.

LANE CLOSURE — 7/16/21 to 7/18/21 — ROADWAY STRIPING
Friday (7/16) 9 a.m. to 5 p.m., Saturday (7/17) 12 p.m. to 6 p.m., Sunday (7/18) 12 p.m. to 6 p.m., Mobile Ops: US 183 northbound one main lane will be closed SH 71 to US 290.

LANE CLOSURE — 7/16/21 to 7/18/21 — PAVING
Friday (7/16) at 8 p.m. until Sunday (7/18) at 6 p.m., US 183 northbound frontage road will be reduced to one lane from Bluestein Dr. to Techni Center Dr.

LANE CLOSURE — 7/16/21 to 7/18/21 — PAVING
Friday (7/16) at 8 p.m. until Sunday (7/18) at 6 p.m., US 183 southbound frontage road will be reduced to one lane from 51st St. to MLK Blvd.

LANE CLOSURE — 7/16/21 to 7/17/21 — PAVING
Friday (7/16) 8 p.m. to 10 a.m., South to North U-turn will be closed at Levander Loop, and Levander Loop will be closed at US 183, detour via Airport Blvd. to south US 183 to Montopolis U-turn.

RAMP CLOSURE — 7/12/21 to 7/14/21 — PAVING
Friday (7/16) 8 p.m. to 10 a.m., Saturday (7/17) 6 p.m. to 10 a.m., US 183 northbound frontage road will be closed at Manor Rd., detour via Tuscany Way to US 290 frontage road. South to North U-turn at Manor Springdale Rd. will be closed. US 183 north main lane exit to 290 frontage road will be closed, detour via Cameron Rd.

LANE CLOSURE — 7/17/21 to 7/17/21 — GUARDRAIL WORK
Saturday (7/17) 3 a.m.to 3 p.m., Eastbound SH 71 left frontage lane will be closed E. Riverside Dr. to US 183.

LANE CLOSURE — 7/17/21 to 7/18/21 — PAVING
Saturday (7/17) 4 p.m. to 10 a.m., US 183 northbound left frontage lane will be closed from Montopolis Dr. to Bolm Rd.

LANE CLOSURE — 7/17/21 to 7/17/21 — PAVING
Saturday (7/17) 6 p.m. to 10 a.m., South to North U-turn will be closed at Levander Loop, and Levander Loop will be closed at US 183, detour via Airport Blvd. to south US 183 to Montopolis U-turn.

LANE  CLOSURE — 7/17/21 to 7/18/21 — ROADWAY STRIPING
Saturday (7/17) 6 p.m. to 6 a.m., Northbound US 183: bypass of MLK Blvd will be closed, frontage road will be reduced to one lane from MLK Blvd. to Loyola, south to north U-turn at MLK Blvd. will be closed.

LANE CLOSURE — 7/17/21 to 7/18/21ROADWAY STRIPING
Saturday (7/17) 6 p.m. to 6 a.m., SH 71 main lanes in both directions will be reduced to one lane from Brandt to E. Riverside Dr.

ROAD CLOSURE — 7/18/21 to 7/20/21HIGHWAY LIGHTING
Sunday (7/18) 6 p.m. to 6 a.m., Monday (7/19) 8 p.m. to 6 a.m., South to North U-turn will be closed at Levander Loop, and Levander Loop will be closed, detour via Airport Blvd. to south US 183 to Montopolis U-turn.

RAMP CLOSURE — 7/18/21 to 7/23/21GUARDRAIL WORK
Sunday (7/18) 6 p.m. to 6 a.m., Monday-Thursday (7/19-7/22) 8 p.m. to 6 a.m., Southbound US 183 exit ramp to eastbound SH 71 towards the airport will be closed at US 183. Detour via E. Riverside Dr. U-turn.

RAMP CLOSURE — 7/18/21 to 7/20/21PAVING
Sunday (7/18) 8 p.m. to 6 a.m., Monday (7/19) 8 p.m. to 6 a.m., US 183 northbound main lane will be closed at SH 71 and Eastbound SH 71 to northbound US 183 cloverleaf will be closed at US 183. Detour Spirit of Texas U-turn.

RAMP CLOSURE — 7/19/21 to 7/23/21BRIDGE CONSTRUCTION
Monday-Thursday (7/19-7/22) 8 p.m. to 6 a.m., US 183 northbound main lane and general-purpose exit to Airport Blvd. will be closed at Montopolis Dr. Detour via US 183 northbound frontage road to U-turn at Boggy Creek to US 183 southbound.

LANE CLOSURE — 7/19/21 to 7/22/21ROADWAY STRIPING
Monday-Thursday (7/19-7/22) 9 a.m. to 5 p.m., Mobile Ops: US 183 northbound one main lane will be closed from SH 71 to US 290.

LANE CLOSURE — 7/19/21 to 7/23/21GUARDRAIL WORK
Monday-Friday (7/19-7/23) 9 a.m. to 3 p.m., US 183 frontage road right lane in both directions will be closed from Hudson to Montopolis.

LANE CLOSURE — 7/19/21 to 7/23/21GUARDRAIL WORK
Monday-Friday (7/19-7/23) 9 a.m. to 3 p.m., US 183 frontage road in both directions will be closed from Hudson to Loyola.

LANE CLOSURE — 7/19/21 to 7/22/21PAVING
Monday-Wednesday (7/19-7/21) 8 p.m. to 6 a.m., US 183 southbound frontage lane will be reduced to one lane from Loyola to MLK Blvd.

ROAD CLOSURE — 7/19/21 to 7/21/21PAVING
Monday-Tuesday (9/19-9/20) 8 p.m. to 6 a.m., US 183 northbound frontage road will be closed at Manor Rd., detour via Tuscany Way to US 290 frontage road. South to North U-turn at Manor Springdale Rd. will be closed. US 183 north main lane exit to 290 frontage road will be closed, detour via Cameron Rd.

LANE CLOSURE — 7/19/21 to 7/23/21BRIDGE CONSTRUCTION
Monday-Thursday (7/19-7/22) 8 p.m. to 6 a.m., US 183 southbound main lane will be reduced to one lane from Interchange Blvd. to Montopolis Dr.

LANE CLOSURE — 7/19/21 to 7/22/21BRIDGE CONSTRUCTION
Monday-Wednesday (7/19-7/21) 8 p.m. to 6 a.m., Westbound SH 71 main lane will be reduced to one lane from Brandt Dr. to US 183.

RAMP CLOSURE — 7/19/21 to 7/22/21BRIDGE CONSTRUCTION
Monday-Wednesday (7/19-7/21) 8 p.m. to 6 a.m., US 183 southbound main lane and general-purpose exit to Montopolis will be closed at Interchange. Detour via Airport Blvd. exit to 7th St. to US 183 south.

LANE CLOSURE — 7/19/21 to 7/21/21 — PAVING
Monday-Tuesday (7/19-7/20) 10 p.m. to 6 a.m., US 183 southbound main lane will be reduced to one lane from 51st to Techni Center Dr.

LANE CLOSURE — 7/19/21 to 7/21/21 — PAVING
Monday-Tuesday (7/19-7/20) 8 p.m. to 6 a.m., US 183 northbound frontage road will be reduced to one lane from Interchange Blvd. to Techni Center Dr.

LANE CLOSURE — 7/20/21 to 7/22/21 — PAVING
Tuesday-Wednesday (7/20-7/21) 8p.m. to 6 a.m., US 183 northbound frontage road will be reduced to one lane from Thompson to Montopolis.

LANE CLOSURE — 7/20/21 to 7/22/21 — PAVING
Tuesday-Wednesday (7/20-7/21) 8 p.m. to 6 a.m., US 183 northbound frontage road will be reduced to one lane in both directions from Techni Center to Loyola.

RAMP CLOSURE — 7/21/21 to 7/23/21 — BRIDGE CONSTRUCTION
Wednesday-Thursday (7/21-7/22) 8 p.m. to 6 a.m., US southbound frontage road on-ramp to Montopolis Dr. will be closed. Traffic to travel through signalized intersection at Montopolis to on-ramp just north of Patton.

LANE CLOSURE — 7/21/21 to 7/23/21 — PAVING
Wednesday-Thursday (7/21-7/22) 8 p.m. to 6 a.m., US 183 frontage road in both directions will be reduced to one lane from Loyola to US 290.

LANE CLOSURE — 7/22/21 to 7/22/21 — ROADWAY STRIPING
Monday-Thursday (7/19-7/22) 7 a.m. to 3 p.m., Mobile Ops: US 183 southbound one main lane will be closed from US 290 to SH 71.

RAMP  CLOSURE — 7/22/21 to 7/25/21 — PAVING
Thursday (7/22) 8 p.m. to 6 a.m., Friday (7/23) at 8 p.m. until Sunday (7/25) at 6 p.m., US 183 northbound general purpose on-ramp at Purple Sage will be reduced to one lane.

 


.

Long Term

DETOUR5/24/21 to 7/31/21 — BRIDGE CONSTRUCTION
U-turns north of Boggy Creek closed for barrier repairs. Detour to U-turns at MLK and Levander Loop.

 

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button