San Marcos weekly road construction detours, closures

Staff

The short & long term road construction projects that could affect your drive… Please use caution, drive slowly, and watch for heavy equipment, construction workers, and traffic control flaggers.

  • All traffic projects may be subject to delays or extensions due to weather and/or the current Public Health situation.

.

Special Weekly Closures

 EAST SAN ANTONIO STREET — Every Saturday — FARMERS MARKET
Every Saturday from 7:30 AM to 3 PM, Half a block of the street closed from the Alley to N. LBJ for the Farmers Market on the Square. Main Street Program 512.393.8430.

 

SHORT TERM

  SESSOMS DRIVE
The 100 block of Eastbound Sessoms Drive will be closed starting March 15 through March 18, 2021, from 8 a.m. to 5 p.m. for a Texas State Waterline Repair. For more information contact, Barbara Delgado at 512.245.1880.

  UHLAND ROAD
Uhland Road between West Avenue and IH35 Frontage Road will be closed starting March 16, 2021, from 8 a.m. to 12 p.m. for a Waste Water Utility Project. For more information, contact Brandon Clark at 512.393.8010.

  SESSOMS DRIVE
Eastbound Sessoms Drive between State Street and Aquarena Springs Drive will be closed starting March 18, 2021, from 8 a.m. to 2 p.m. for Drainage Utility Maintenance. For information on this project contact, Transportation at 512.393.8036.

  HUTCHISON STREET
Hutchison Street at N LBJ Drive will be closed starting March 19, 2021, from 8 a.m. to 12 p.m. for Drainage Utility Maintenance. For more information about this project contact, Transportation at 512.393.8036.

.

.

LONG TERM

 

VICTORY GARDENS UTILITY PROJECT
The Victory Gardens Neighborhood will undergo a new underground utility installation and will impact traffic in the following streets Georgia Street, Armstrong Street, Eisenhower Street, Camacho Street, McArthur Street, Virginia Street, and Churchill Street. The Closure will also affect Patton Street, Wavell Street, and Knox Street. Starting Feb. 1 through Mar. 31 from 7 a.m. to 5 p.m. For more information contact Darren with Cox Commercial Construction at 956.601.1645.

 HOPKINS STREET
Hopkins Street between Bishop Street and Moore Street will be closed for a Street Reconstruction Project. Traffic will be detoured to Craddock at both ends of the project, with only local traffic allowed. Phase 2 starting and will extend the closure for local traffic from Bishop to Endicott Street. Phase 1 is anticipated to be complete by January and will open to local traffic from Mitchell Street to Endicott Street. The overall completion of the project is scheduled for Spring 2022. For additional information, contact Richard Reynosa with the City of San Marcos Engineering Department at 512.393.8235.

 HOPKINS STREET
CM Allen Parkway to Thorpe Lane will have intermittent single lane closures starting Nov. 30 to Aug. 31 from 9 a.m. to 3 p.m. for the installation of sidewalks and driveways. For information on this project, contact Brad Bechtol with Mac Inc. at 512.350.3767.

 UHLAND ROAD
1396 Uhland Road to Aquarena Springs Drive will be closed starting Mar. 15 through Jul. 15 from 7 a.m. to 5 p.m. For more information about this road reconstruction project contact, Todd Keltgen at 512.212.7990.

 

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button