San Marcos Traffic Update May 9 – 14, 2016

816 HOPKINS: The alley way between 817 Hopkins and Belvin St. will be under construction for street maintenance through May 20 from 8 a.m. – 5 p.m. daily, weather permitting. Alley will be passable to through traffic. City of San Marcos Streets Dept.,512.393.8025

 

BLANCO GARDENS: Street maintenance on Linda and Bugg Ln, Barbara Dr., and Harper St., will begin on May 9 – 27, weather permitting, from 7 a.m. – 5 p.m. daily. Please park your vehicle off the street or it may be towed at your own expense. City of San Marcos Streets Dept., 512.393.8025

 

CHARLES AUSTIN/AQUARENA SPRINGS: Charles Austin St. from Aquarena Springs Drive to Jowers Access Road will be closed on May 12 – 14 from 8 a.m. to 8 p.m. daily for Texas State University commencement ceremonies.

 

LAGO VISTA: Curb, sidewalk and driveway maintenance is scheduled in the Hills of Hays subdivision at the 800 block of Lago Vista through May 13 from 7 a.m. – 6 p.m. Mon-Friday, weather permitting. This maintenance is part of the city’s ongoing drainage maintenance program. City of San Marcos Drainage Dept., 512.393.8019

 

YARRINGTON RD: Two inside south bound main lanes will be closed for maintenance on the Yarrington Bridge May 8-12, weather permitting from 11 p.m. to 5 a.m. daily. TxDOT, 737.600.3137

 

EAST SAN ANTONIO STREET: Every Saturday from 8 a.m. – 3 p.m.  Half a block of street closed from the alley to N. LBJ for the Farmers Market on the Square. Main Street Program, 512.393.8430

 

 

LONG TERM ROAD PROJECTS:

  • CENTERPOINT/TANGER PREMIUM OUTLET INTERSECTION:  The intersection for the new traffic signalization project has now been completed.  The state-of-the-art traffic signal and crosswalk improvements were active on April 26 and include audible pedestrian push buttons, countdown pedestrian signals, ADA compliant pedestrian ramps, GPS emergency pre-emption, high-speed radio communication, video detection with bike presence capabilities, stamped concrete crosswalk, and LED crosswalk lighting. City of San Marcos Traffic Dept., 512.393.8034

 

  • HOLLAND/MOORE ST: Moore Street at Holland will be closed until June 9 to correct traffic flow issues and to make enhancements to the Holland Street entrance into the Speck garage; however, the east entrance into Speck Garage on Academy St. will remain open.

 

  • NORTH LBJ FROM CAMARO WAY TO CRADDOCK: This road will be open to two-way traffic, but the lanes will be shifted west to allow space for the City contractor to construct a new lift station on the corner of N. LBJ and Craddock. Project will last until summer 2016. Engineering/Capital Improvements, 512.393.8130

 

  • 817 CHESTNUT ST: One lane will be closed for new construction to site through June 2. Street will continue to be passable to all traffic. J4 Development, 469.236.0922

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button