Traffic Alert: Top Road Construction Projects In San Marcos Drivers Should Prepare For

The long & short term road construction projects that could affect your drive… Please use caution, drive slowly and watch for heavy equipment, construction workers, and traffic control flaggers.

 

TRAFFIC ALERT: Traffic will have intermittent lane closure citywide for Crosswalk and School Zone striping

ADDITIONAL TEMPORARY TRAFFIC ALERTS

Street Maintenance Planned for the Following Neighborhoods

FRANKLIN ST. BETWEEN BISHOP AND FURMAN
Intermittent lane closure daily 7 a.m. – p.m. through September for curb installation. City of San Marcos Transportation Department 512.393.8036.

HILLYER ST. BETWEEN BISHOP & COLUMBIA
Intermittent lane closures daily 8 a.m. – 5 p.m. through October for sidewalk construction. Straight Line Management 210.226.2107.

JOHNSON BETWEEN DAILY AND MLK 
Intermittent lane closures daily 8 a.m. – 5 p.m. for sidewalk construction. SM Transportation Department 512.393.8036.

Special Weekly Closures

EAST SAN ANTONIO STREET: Every Saturday FARMERS MARKET
Every Saturday from 7:30 AM to 3 PM Half a block of the street closed from the Alley to N. LBJ for the Farmers Market on the Square. Main Street Program 512.393.8430.

Short Term

ROOSEVELT STREET 10/01/19 to 10/31/19 WASTEWATER LINE CONSTRUCTION
Roosevelt Street from Eisenhower Street/Patton Street will have partial lane closures with flagger control starting October 1-31, 2019, from 7 AM to 5 PM for Wastewater line construction. Cox Commercial Construction 956.601.1645.

EISENHOWER STREET —10/01/19 to 10/31/19WASTEWATER LINE CONSTRUCTION
Eisenhower Street from Patton Street to Georgia Street will have partial lane closures with flagger control starting October 1-31, 2019, from 7 am to 5 pm for Wastewater line construction. Cox Commercial Construction 956.601.1645.

CAMACHO STREET/MACARTHUR ST 10/01/19 to 10/31/19 WASTERWATER LINE CONSTRUCTION
200 – 300 Block of Camacho Street/MacArthur Street will have lane closure with flagger control starting October 1-31, 2019, from 7 AM to 5 PM for Wastewater line construction. Cox Commercial Construction 956.601.1645.

ARMSTRONG ST 10/01/19 to 10/31/19UTILITY INSTALLATION
The 100-400 blocks of Armstrong will have partial lane closures October 1-31, 2019, from 7 a.m. to 5 p.m. for Utility Installation. Cox Commercial Construction, Darren 956.601.1645.

BERT BROWN 10/09/2019 to 10/15/2019UTILITY WORK
Bert Brown at Post Road will be closed starting October 9 – October 15, 2019, from 7 am to 5 pm for Utility Work. Jacob Snyder 214.298.4578.

CHARLES AUSTIN 10/15/2019 to 10/15/2019 UTILITY WORK
Charles Austin will have a full lane closure on October 15, 2019, from 5 pm to 9:30 pm for a Guest Speaker Event at the Strahan Arena. Texas State University 512.618.8911.

Long Term

SESSOM DRIVE 9/16/19 to 11/04/19 TEXAS STATE DRAINAGE PROJECT
Sessom Drive will have an eastbound lane closure from Tomas Rivera Dr. to North LBJ Starting September 16 – November 4, 2019. The Road Closure will take place between the hours of 9 AM – 4 PM during weekdays and 7 AM – 7 PM for a Texas State Drainage Project. Javier Barajas 512.913.5080.

DOWNTOWN LOFTS APARTMENTS PROJECT 9/13/19 to 01/20/20 CONSTRUCTION
Traffic impacts include Fredricksburg Street at Hopkins Street to San Antonio, the southbound lane of Telephone Alley at Hopkins to San Antonio, Feltner Alley at San Antonio; will be closed due to construction starting September 13, 2019 – January 20, 2020. A.C.G. LLC 248.632.2311.

ARMSTEAD 3/11/19 to 11/11/2019TRAVIS STREET DRAINAGE PROJECT
Traffic impacts include the intersection of MLK at Armstead and Armstead from MLK to San Antonio Street will be closed starting March 11, 2019 – November 2019, from 7 AM to 5 PM for Utility Installation. Cox Construction, Darren Okruhlik, 956.601.1645.

SAN ANTONIO STREET 3/11/19 to 11/11/2019 TRAVIS STREET DRAINAGE PROJECT
Traffic impacts include San Antonio Street from Travis Street to Armstead will be closed starting March 11, 2019 – November 2019, from 7 AM to 5 PM for Utility Installation. Cox Commercial Construction, Darren Okruhlik, 956.601.1645.

SAN ANTONIO STREET 3/11/19 to 11/11/2019 TRAVIS STREET DRAINAGE PROJECT
Traffic impacts include Travis Street from San Antonio St. to Hopkins Street will be closed starting March 11, 2019 – November 2019, from 7 AM to 5 PM for Utility Installation. Cox Commercial Construction, Darren Okruhlik, 956.601.1645.

TRAVIS ST 3/11/19 to 11/11/2019TRAVIS STREET DRAINAGE PROJECT
Traffic impacts include Travis Street from San Antonio St. to Hopkins Street will be closed starting March 11, 2019 – November 2019, from 7 AM to 5 PM for Utility Installation. Cox Commercial Construction, Darren Okruhlik, 956.601.1645.

MILL STREET RECONSTRUCTION May 2019 to Fall 2019 RECONSTRUCTION OF WATERLINE SERVICES, POTHOLING
Mill Street between 500 and 700 blocks will have partial lane closure through the fall of 2019, for the reconstruction of waterline services and potholing. Phase Two Traffic Control Plan will be implemented on September 5, 2019. City of San Marcos Engineering/ CIP Dept., 512.393.8130; Smith Contracting, 512.789.5441.

HOPKINS STREET Nov. 2019 to Fall 2020 UTILITY INSTALLATION
Hopkins Street will be closed starting November 18 – the fall of 2020 for a Road Widening Project and Underground Utility Installation. Richard Reynosa 512.393.8235.

COERS STREET 10/01/2018 to 12/01/2019DRAINAGE IMPROVEMENTS
Coers Street between Old RR 12 to Owens Street will have southbound lane closure to through traffic starting October 1, 2018, to December 1, 2019, from 7 AM to 5:30 PM for drainage improvement. Denbow Company 512.264.2767.

CM ALLEN 07/25/2019 to 12/2019 RECONSTRUCTION OF ROADWAY
CM Allen between University Drive and Hopkins Street will be closed starting July 25, 2018, for the Reconstruction of the Roadway. City of San Marcos Engineering/CIP Dept. 512.393.8130.

EASTBOUND CONCHO STREET AUGUST 2018 to SUMMER 2020CONSTRUCTION
Eastbound Concho Street between LBJ and Guadalupe will be closed, LBJ and Guadalupe will also have narrow lanes between University Drive and Concho Street, starting Aug. 6, 2018 through the summer of 2020 for Construction. 3411 Builders, Inc., Richard Bagby 832.449.0328.

STUDENT CENTER DRIVE FALL 2019LBJ STUDENT CENTER EXPANSION
Student Center Drive from Matthews to the North Loading Dock of the Alkek Library will be closed until January 31, 2020. For the expansion of the LBJ Student Center. Service and delivery access to Alkek Library and Derrick Hall loading docks will be available, via Russell and Pickard Streets. Starting on August 21, 2019, Matthews Street from Russell Circle to N. LBJ Street, Elm Street, Smith Hall Parking Lot will also be closed. There will be delivery vehicle access to Russell Circle, Pickard Street, Buckner Street, and a portion of Matthews Street to serve the North Alkek Library loading dock and the Math Computer Science loading dock. All parking adjacent to Arnold Hall is closed. Texas State University 512.245.2202.


Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button