Oak Hill Parkway traffic alerts, closures, detours for week of April 4
The TxDOT Austin District is overseeing the design and construction of Oak Hill Parkway. Atkins serves as TxDOT’s general engineering consultant, and Atlas will provide owner verification testing and inspection.
The Austin District plans, designs, builds, operates, and maintains the state transportation system in the following counties: Bastrop, Blanco, Burnet, Caldwell, Gillespie, Hays, Lee, Llano, Mason, Travis, and Williamson.
The Texas Department of Transportation is responsible for maintaining 80,000 miles of road and supporting aviation, maritime, rail, and public transportation across the state.
Through collaboration and leadership, TxDOT delivers a safe, reliable, and integrated transportation system that enables the movement of people and goods. Visit TxDOT.gov.
.
• CURRENT TRAFFIC ALERTS •
• 4/3/22 to 4/5/22 — 9 PM TO 5 AM — WESTBOUND US 290
Westbound US 290 will be reduced to one lane between Convict Hill Road and Rosson Drive.
• 4/4/22 to 4/8/22 — 9 AM to 3 PM — WESTBOUND US 290
Westbound US 290 frontage road U-turn to eastbound US 290 frontage road closed at Old Fredericksburg Road. Drivers can make a signalized U-turn or proceed to the
……………next intersection.
• 4/4/22 to 4/8/22 — 9 AM to 3 PM — EASTBOUND US 290
Eastbound US 290 frontage road U-turn to westbound US 290 frontage road closed at Old Fredericksburg Road. Drivers can make a signalized U-turn or proceed to the next
……………intersection.
• 4/6/22 to 4/7/22 — 9 PM TO 5 AM — WESTBOUND US 290
Westbound US 290 will be reduced to one lane between Circle Drive and Tara Lane.
• 4/6/22 to 4/7/22 — 11 PM to 4 AM — WESTBOUND US 290
Full closure of westbound US 290 between Circle Drive and Tara Lane. Closure will last about 15 minutes. 4/6 11 p.m. to 4 a.m.
• 4/7/22 to 4/8/22 — 9 PM TO 5 AM — WESTBOUND US 290
Westbound US 290 will be reduced to one lane between Circle Drive and Tara Lane.
• 4/7/22 to 4/8/22 — 9 PM TO 5 AM — EASTBOUND US 290
Eastbound US 290 will be reduced to one lane between Tara Lane and South View Road.
• 4/7/22 to 4/8/22 — 11 PM to 4 AM — WESTBOUND US 290
Full closure of westbound and eastbound US 290 between South View Road and Tara Lane. Duration of closure will be no longer than 15 minutes.
• 4/8/22 to 4/9/22 — 10 PM TO 7 AM — EASTBOUND US 290
Eastbound US 290 will be reduced to one lane between Tara Lane and South View Road.
• 7/1/21 to 12/30/22 — OAK HILL PARKWAY ACTIVITY
Crews are active along the Oak Hill Parkway corridor.
• 3/22/22 to 9/18/22 — 9 AM to 3 PM — WESTBOUND US 290
Continuous long-term closure: The right lane of the westbound US 290 frontage road will be temporarily closed between Boston Lane and Industrial Oaks Boulevard.
……………Access to businesses will be maintained.
• 4/18/22 to 4/30/23 — OAK HILL PARKWAY ACTIVITY
Continuous long-term closure: McCarty Lane from US 290 to Joe Tanner Lane will be closed. Drivers will be detoured to Joe Tanner Lane. April 2022 to Spring 2023 – dates
……………TBD