Jannah Theme License is not validated, Go to the theme options page to validate the license, You need a single license for each domain name.

I35 Corridor Weekly Road Construction Alerts For Friday, April 20 – Friday, April 27

TxDOT, My I35 and Central Texas Regional Mobility Authority’s Weekly I35 Corridor Traffic and Road Construction Update…

TxDOT knows you’ve got to get where you need to go.

While construction is tough on everyone, TxDOT is trying to do
everything they can to minimize disruptions.

•   I – 3 5   L A N E   C L O S U R E   A L E R T S   •

•   F R I D A Y   4 / 2 0   –   F R I D A Y   4 / 2 7   •

 

 



I – 3 5   T O   F M   3 4 0 6

PROJECT OVERVIEW | The intersection of FM 3406 and the I-35 frontage roads are being improved, and the FM 3406 bridge over I-35 is being reconstructed.

THIS WEEK’S PROJECT TRAFFIC ADVISORY

Closures are weather permitting

 

  • The FM 3406 (Old Settlers Blvd) bridge will close to eastbound traffic. Westbound traffic will detour to the newly constructed U-turn Bridge. | Until summer 2018, weather permitting

 

  • Westbound traffic at FM 3406 to use new turnaround Bridge over I-35 until further notice. | Saturday, April 14 to Friday, April 20

Read more on construction phasing and additional project details HERE.



I – 3 5   A T   O L T O R F   S T .

PROJECT OVERVIEW | Improvements include the reconstruction of the Oltorf Street bridge, improving entrance/exit ramps and frontage roads, constructing new extended entrance/exit lanes for mainlanes and ramps, and adding U-turns in both directions at Oltorf Street.

Bicycle and pedestrian enhancements will also be made along the I-35 frontage roads in each direction within the project limits.

THIS WEEK’S PROJECT TRAFFIC ADVISORY

Closures are weather permitting

 

  • I-35 frontage road right lane closed in both directions between Woodward St. and Oltorf St. Watch for flaggers. | From 9 AM until 3 PM Monday, April 23 through Friday, April 27.

 

  • Northbound I-35 frontage road left lane closed between SH 71 and Woodward St. | From 9 AM until 3 PM Monday, April 23 through Friday, April 27. 

Read more on construction phasing and additional project details HERE.



I – 3 5   F R O M   R U N D B E R G   L N   T O   U S  2 9 0   E A S T

PROJECT OVERVIEW | This project includes main-lanes and frontage road reconstruction and the addition of three new flyovers at US 183.

The project also includes reconstruction of the St. Johns Avenue Bridge, the addition of frontage road U-turns on both sides, intersection bypass lanes under St. Johns Avenue in both directions, extended entrance/exit lanes, and ramp and shoulder improvements.

THIS WEEK’S PROJECT TRAFFIC ADVISORY

Closures are weather permitting

 

 

 

  • Southbound I-35 frontage road right lane closed between Park Plaza Dr. & E. Powell Ln. | Until 5 AM Monday, April 30.

 

  • Southbound I-35 frontage road right lane closed between Huntland Dr. & US 290 E. | Until 5 AM Tuesday, July 3.

 

  • St. Johns Ave. closed at I-35. Detour to Huntland Dr. & Ronald Johnson Dr. | From 10 AM to 2 PM Thursday, April 26.

 

  • Northbound I-35 left lane closed between US 290 E. and US 183. | From 9 PM until 5 AM Sunday, April 22 through Thursday, April 26.

 

  • Southbound I-35 reduced to one left lane between US 183 and US 290 E. | From 9 PM until 5 AM Sunday, April 22 through Thursday, April 26.

Read more on construction phasing and additional project details HERE.



I – 3 5   F R O M   S T A S S N E Y   L N .   T O   W I L L I A M   C A N N O N   D R.

PROJECT OVERVIEW | The project will reconstruct the bridge structures at Stassney Lane and William Cannon Drive, as well as the frontage road bridge over Williamson Creek.

New U-turn bridges will be added in both directions at Stassney Lane and William Cannon Drive, and the I-35 mainlanes will be widened to incorporate shoulders and extended entrance/exit lanes to allow for better merging.

Bicycle and pedestrian enhancements are also being made, and new safety lighting is being installed.

• THIS WEEK’S PROJECT TRAFFIC ADVISORY •

Closures are weather permitting

  • Northbound I-35 frontage road right lane closed between William Cannon Dr. and Nelms St. | 9 AM Saturday, April 21 to 3 PM Saturday, April 21.

 

  • Southbound I-35 left lane closed under William Cannon Dr. | From 10 PM until 6 AM Sunday, April 22 through Monday, April 23.

 

  • Northbound I-35 frontage road right lane closed approaching William Cannon Dr. | 9 AM Monday, April 23 to 3 PM Monday, April 23.

 

  • Southbound I-35 frontage road left lane closed between Stassney Ln. and William Cannon Dr. exit. | From 9 AM until 3 PM Monday, April 23 through Tuesday, April 24.

 

  • Southbound I-35 right lane closed between William Cannon Dr. and Slaughter Ln. | From 10 PM until 6 AM Monday, April 23 through Thursday April 26.

 

  • Northbound I-35 frontage road right lane closed between William Cannon Dr. and Stassney Ln. | From 9 AM until 3 PM Thursday, April 26 through Friday, April 27.

 

  • Southbound I-35 frontage road closed at William Cannon Dr. | From 9 AM until 3 PM Thursday, April 26 through Friday, April 27.

 

  • Southbound I-35 frontage road right turn lane closed at Stassney Ln. | From 9 AM until 3 PM Thursday, April 26 through Saturday, April 28.

 

 

Read more on construction phasing and additional project details HERE.



I – 3 5   F R O M   U S   7 9   T O   S H   4 5   N O R T H

PROJECT OVERVIEW | New braided ramps (where one ramp crosses over the other) are being constructed along the northbound I-35 mainlanes between Hester’s Crossing and RM 620 to eliminate merging conflicts.

The northbound and southbound intersections of US 79 and the I-35 frontage roads are also being reconstructed to add a third left-turn for westbound US 79.

THIS WEEK’S PROJECT TRAFFIC ADVISORY

Closures are weather permitting

  • Northbound I-35 right lane closed between SH 45 and the RM 620 exit. | 9 PM to 5 AM Sunday, April 22. 
  • Northbound I-35 entrance ramp closed at Hesters Crossing. | From 8 PM until 5 AM Sunday, April 22 through Thursday, April 26.

     

 

  • Northbound I-35 frontage road single lane closures between Mays Crossing and RM 620. | From 8 AM until 3 PM Monday, April 23 through Friday, April 27.

 

  • Northbound I-35 left two lanes closed between RM 620 and FM 3406. | From 9 PM until 5 AM Monday, April 23 through Tuesday, April 24.

Read more on construction phasing and additional project details HERE.


My I35 Traffic Alerts are provided by Central Texas Regional Mobile Authority (CTRMA) & TxDOT.


 

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button