What To Expect On San Marcos Roads During Week Of Sunday, Oct. 22 – Saturday, Oct. 28

San Marcos’ Weekly Road Construction & Traffic Report  —  Short & Long Term Road Construction Projects Affecting San Marcos Traffic for Sunday, October 22  – Saturday, October 28, 2017

 

San Marcos’ Weekly Road Construction & Traffic Report

  • Sabas Avila — Asst. Director of Public Services – Transportation — Email Sabas Avila

 

 

  • Phone: 512-393-8036

Can’t see the whole table? Touch it and scroll right.

 

WEEKLY ROAD CONSTRUCTION SCHEDULE 

LOCATIONBEGIN DATEEST. END DATEHOFHEINZE STREETPlease watch for heavy equipment and construction workers on the street. Please park vehicles off the street or it may be towed at your own expense. Please drive slowly, use caution in the work zone and obey traffic control flagmen. City of San Marcos Street Dept., 512.393.8025.Oct. 17      8 PM   Nov. 17    6 AM LP 82/AQUARENA LP 82/Aquarena Springs between Charles Austin Dr. to Mill Street. TxDOT 512. 832.7027.   Oct. 24     8 PM   Oct. 26    6 AM BISHOP ST: 200 Block of N Bishop will have west side lane closure with flagger control for utility work on west side lane. One lane will be shut down with flagger. Centurylink 512.754.5223.      Oct. 2       7 AM    Oct. 28     4 PMLP 82/AQUARENA SPRINGS: LP 82/Aquarena Springs between Charles Austin Dr. to Mill Street will have daytime one lane closure on both directions excluding weekends. TxDOT 512. 832.7027.  Oct. 25    8 AM  Nov. 3        5 PM   SH 21: SH 21 will be shut down for railroad crossing re-planking. TxDOT Contact: Henry Ramirez 512.574.2025.    Oct. 23          9 PM         Oct. 24          5 AM    KISSING ALLEY: Kissing Alley will be closed for a concert. Contact – Matt Akins 512.431.2278.   Oct. 26     6 PM  Oct. 26  12 AM KISSING ALLEY: Kissing Alley will be closed for Downtown Trick or treat. Contact – Samantha Armbruster 512.393.8430.   Oct. 28       10 AM   Oct. 28     10 PM  BISHOP ST: Bishop St. from Belvin St. to Prospect St. will be closed for electricity utility work. Traffic will be detoured to Clara St. SMEU, 512-393-8300.   Oct. 17     7 AM  Oct. 18   4 PMMACARTHUR STREET: MacArthur Street will have one lane closure with flagger control for water line tie in. Alamo Fire Line 512.351.6479.   Oct. 23    7 AM    Oct. 25     5 PMPOST ROAD: The Blanco River Bridge was closed on July 24 for new bridge construction. Traffic needs to detour to alternative routes. Hays County.July 24NOT LISTEDSTAPLES RD: Staples Rd. will be closed on both sides of Broadway for Utility installation. Rockin Q Construction 512.738.6666.   Oct. 7    7 AM  Oct. 20  5 PMLONG TERM CLOSURE – MCKIE ST: Mckie St. will be closed from IH35 frontage Rd. to apartment entrance for utility installation. Rockin Q Construction 512.738.6666.   July 24     7 AM    Dec. 1     5 PMLONG TERM CLOSURE – VISTA ST:All lanes in both directions will be closed from 310 – 312 Vista Street for utility construction Texas State University, 512.245.2202.Present   July 31    2018LONG TERM CLOSURE – SESSOM DR: Various lane closures from N. LBJ to Aquarena Springs Dr. for road construction. City of San Marcos Engineering/CIP Dept., 512.393.8130.PresentJan. 2018LONG TERM CLOSURE – N LBJ:  From Holland St. to Camaro Way, this road closure will occur during daytime construction hours. City contractor will be replacing utility lines in the area. Through traffic including Emergency Vehicles, will be routed around the project limits; please follow the detours. Engineering/Capital Improvements, 512.393.8130.PresentEnd of Fall 2017LONG TERM CLOSURE – WOODS ST: A segment of Woods St between Comanche and North Street will be closed during construction of the new Texas State University Engineering & Science Building. Project Manager Scott Rouse, 512.245.2202.August 2015August 2018LP 82/AQUARENA SPRINGS: TxDOT introduced a new traffic signal at the intersection of Post/Bobcat traffic will be detoured to the new signal. TxDOT, 512.393.8130.    Feb.     2017Spring 2018LONG TERM CLOSURE – EAST SAN ANTONIO STREET – EVERY SATURDAY: Half a block closed from the alley to N. LBJ every Saturday from 8 a.m. – 3 p.m. for the Farmers Market on the Square. Main Street Program, 512.393.8430. N/AN/A 

 


San Marcos Road Closure Work for week of Oct. 22-Oct 28, 2017. Google Map image, courtesy of City of San Marcos website.


 

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button