MyI35 Corridor Weekly Road Construction Alerts For Monday, Nov. 27 – Friday, Dec. 1

TxDOT, My I35 and Central Texas Regional Mobility Authority’s Weekly Corridor Traffic and Road Construction Update for the IH-35 Corridor

TxDOT knows you’ve got to get where you need to go.

While construction is tough on everyone, TxDOT is trying to do everything they can to minimize disruptions.

•  I – 3 5   L A N E   C L O S U R E   A L E R T S  •  M O N D A Y  1 1 / 2 7  –  F R I D A Y  1 2 / 1  •



L o n g    T e r m    C l o s u r e   o f   F M   3 4 0 6   ( O l d   S e t t l e r s  B l v d )   B r i d g e 

 

PROJECT OVERVIEW | I-35 Mainlanes and FM 3406 Bridge to Close for Bridge Demolition; Long-term Detour for FM 3406 Bridge. 

The FM 3406 (Old Settlers Blvd.) bridge will be closed for widening and reconstruction for approximately 10 months.

• THIS WEEK’S PROJECT TRAFFIC ADVISORY •

Closures are weather permitting.

 

  • The FM 3406 (Old Settlers Blvd) bridge closed to eastbound traffic. Westbound traffic will detour to the newly constructed U-turn Bridge. | Until summer 2018, weather permitting

 

  • Southbound I-35 reduced to one lane under FM 3406. | Nightly from 9 p.m. until 5 a.m. Monday, November 27 through Thursday, November 28

 

  • Westbound FM 3406 reduced to one lane between Mays St & I-35. | From 8 p.m. until 5 a.m. Tuesday, November 28

 

  • Westbound FM 3406 left lane closed between I-35 & Chisholm Trail Dr. | 8 p.m. Tuesday, November 28 to 5 a.m. Wednesday, November 29

Read more on construction phasing and additional project details HERE.



I – 3 5   F R O M   U S   7 9   T O   S H   4 5  N O R T H

PROJECT OVERVIEWNew braided ramps (where one ramp crosses over the other) are being constructed along the northbound I-35 mainlanes between Hester’s Crossing and RM 620 to eliminate merging conflicts.

The northbound and southbound intersections of US 79 and the I-35 frontage roads are also being reconstructed to add a third left-turn for westbound US 79.

• THIS WEEK’S PROJECT TRAFFIC ADVISORY • 

Closures are weather permitting.  

 

  • I-35 left lane closed in both directions between RM 620 & Westinghouse Rd. | 9 p.m. Tuesday, November 28 to 5 a.m. Wednesday, November 29

 

  • North to southbound U-turn closed at US 79. | Nightly from 9 p.m. until 5 a.m. Monday, November 27 & Tuesday, November 28

 

  • Various closures in both directions over McNeil Rd. | 9 p.m. Monday, November 27 to 5 a.m. Tuesday, November 28

Read more on construction phasing and additional project details HERE.



I – 3 5   A T   O L T O R F   S T R E E T

PROJECT OVERVIEW | Improvements include the reconstruction of the Oltorf Street bridge, improving entrance/exit ramps and frontage roads, constructing new extended entrance/exit lanes for mainlanes and ramps, and adding U-turns in both directions at Oltorf Street.

Bicycle and pedestrian enhancements will also be made along the I-35 frontage roads in each direction within the project limits.

• THIS WEEK’S PROJECT TRAFFIC ADVISORY •

Closures are weather permitting.

  • Southbound I-35 frontage road right lane closed between Oltorf St & Woodward St. | Daily from 9 a.m. until 3 p.m. Monday, November 27 through Friday, December 1

 

  • Northbound I-35 frontage road right lane closed between Woodward St & Oltorf St. Watch for flaggers. | Daily from 9 a.m. until 3 p.m. Monday, November 27 through Friday, December 1

 

  • Northbound I-35 frontage road right lane closed at Oltorf St. | Nightly from 8 p.m. until 5 a.m. Monday, November 27 through Thursday, November 30

 

  • Northbound I-35 reduced to one lane between Woodward St & Woodland Ave. The Woodward entrance ramp & Woodland exit ramp will also close. | From 10 p.m. until 5 a.m. Monday, November 27 & Tuesday, November 28

 

  • Northbound I-35 frontage road left lane closed between E. St. Elmo Rd & Sh 71/Ben White Blvd. | From 5 p.m. until 10 p.m. Tuesday, November 28

 

  • Southbound I-35 reduced to one lane between Woodland Ave & Woodward St exit. The woodland entrance ramp and Woodward exit ramp will also close. | Nightly from 10 p.m. until 5 a.m. Tuesday, November 28 through Thursday, November 30

 

Read more on construction phasing and additional project details HERE.



I – 3 5   F R O M   S T A S S N E Y   L A N E   T O   W I L L I A M   C A N N O N   D R.   

PROJECT  OVERVIEW| The project will reconstruct the bridge structures at Stassney Lane and William Cannon Drive, as well as the frontage road bridge over Williamson Creek.

New U-turn bridges will be added in both directions at Stassney Lane and William Cannon Drive, and the I-35 mainlanes will be widened to incorporate shoulders and extended entrance/exit lanes to allow for better merging.

Bicycle and pedestrian enhancements are also being made, and new safety lighting is being installed.

• THIS WEEK’S PROJECT TRAFFIC ADVISORY •

Closures are weather permitting.

 

  • Northbound I-35 frontage road left lane closed between Williamson Creek & Teri Ln. | Daily from 9 a.m. until 3 p.m. Monday, November 27 through Friday, December 1

 

  • Northbound I-35 reduced to one right lane between William Cannon Dr & Stassney Ln. | 9 p.m. Monday, November 27 to 5 a.m. Tuesday, November 28

 

  • Southbound I-35 left lane closed between Shelby Ln & Stassney Ln. | 9 p.m. Monday, November 27 to 5 a.m. Tuesday, November 28

 

  • Southbound I-35 reduced to one right lane between Shelby Ln & Stassney Ln. The entrance ramp before Stassney Ln will also close. | 10 p.m. Tuesday, November 28 to 6 a.m. Wednesday, November 29

Read more on construction phasing and additional project details HERE.



I – 3 5   F R O M   R M  1 4 3 1   T O   F M   3 4 0 6   ( S O U T H B O U N D )

PROJECT OVERVIEW | Two ramps on the southbound I-35 frontage roads between RM 1431 and FM 3406 are being reconstructed and reversed to address traffic congestion and improve I-35 frontage road and mainlane operations.

• THIS WEEK’S PROJECT TRAFFIC ADVISORY •

Closures are weather permitting.

  • Southbound exit ramp to FM 3406 (Old Settlers Blvd) closed. Use the southbound RM 1431 exit ramp and use the bypass lane to reach FM 3406. | From Tuesday, November 28 through Tuesday, December 12

 

  • Southbound I-35 entrance ramp from RM 1431 closed. | 9 p.m. Tuesday, November 28 to 5 a.m. Wednesday, November 29

Read more on construction phasing and additional project details HERE.



P L A N N E D  M A I N T E N A N C E

• WEEKLY CONSTRUCTION PROJECT TRAFFIC ADVISORY •

Closures are weather permitting.

  • Various closures southbound I-35 frontage road between US 290 & 53rd 1/2 St. | From 9 p.m. until 5 a.m. Wednesday, November 29 & Thursday, November 30

 

  • Various closures northbound I-35 frontage road between Airport Blvd & Barbara Jordan Blvd. | 9 p.m. Tuesday, November 28 to 5 a.m. Wednesday, November 29

 

  • Various closures in both directions of the I-35 frontage road between US 290 & Reinli St. | From 9 p.m. until 5 a.m. Monday, November 27 & Tuesday, November 28

 

  • Various closures in both directions of the I-35 frontage road at E 41st St. | 9 p.m. Monday, November 27 to 5 a.m. Tuesday, November 28

Read more on construction phasing and additional project details HERE.


My I35 Traffic Alerts are provided by Central Texas Regional Mobile Authority (CTRMA) & TxDOT.


 

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button