U.S. 183 Road Construction, Closures You Need To Know About For The Week Of Sunday, April 1

Work continues along US 183, including bridge construction, roadway installation, and utility upgrades. All closures are weather permitting and subject to change…

Work continues along US 183, including bridge construction, roadway installation, and utility upgrades. All closures are weather permitting and subject to change.

Be sure to check 183South.com or their twitter account, @183South, for up to date lane closures on the US 183 corridor in advance.

U.S. 183 Road Construction, Closures You Need To Know About For Sunday, April 1 – 7, 2018

• Need To Know Road Construction Projects •

  • MONDAY through THURSDAY (4/2-5) from 9 am to 3 pm and 8 pm to 6 am, the US 183 frontage road will be reduced to one lane between Manor/Springdale Road and US 290 in both directions. Also, Manor/Springdale Road will be reduced by one lane under US 183 in both directions.

 

  • MONDAY through TUESDAY (4/2-3) from 8 pm to 6 am, the US 183 southbound mainlanes will be closed from Thompson Lane to E. Riverside Dr. In addition, the westbound SH 71 on ramp to the US 183 southbound mainlanes will be closed. Traffic will detour to the U-turn at Riverside Drive.

 

  • TUESDAY through SATURDAY (4/2-7) from 8 pm to 6 am, southbound Airport Blvd will be closed between Levander Loop and US 183. Also, the US 183 southbound mainlanes will be closed over the Colorado River. Traffic will detour over 7th Street. Expect Delays. If heading to the airport in the late evening/early morning, please plan ahead.

 

  • TUESDAY (4/3) from 12 midnight to 6 am, the US 183 southbound mainlanes will be reduced to one lane between Montopolis Drive and Old Bastrop Highway.

 

  • CONTINUOUSLY from Wednesday, April 4, at 8 am until Saturday, April 7, at 5 pm, Old Bastrop Highway will be closed at Carson Creek. Follow signed detour.

 

 

• UPCOMING •

Beginning as early as late April 2018 (subject to change), eastbound Montopolis Drive traffic will detour via a newly constructed section of roadway that will run alongside existing US 183. Crews will remove the existing Montopolis Drive bridge and construct a new and improved bridge over US 183. Further information is coming soon.

• LOCAL EVENTS •

The following local events are also occurring in the coming week.

 Allison Elementary All Staff Meeting
515 Vargas Road 
•  Monday, April 2nd  •  3:15 – 3:45 PM
183 South project update     Vargas Road travel impact

183 South Presents Spring Fling
LBJ Neighborhood Association    Davis-White Neighborhood Park
6705 Crystalbrook Dr.  •  Tuesday, April 3rd
5 – 7 PM    Pizza food truck 
  Giveaways    Family fun
Loyola Lane    Construction impact

 

The Central Texas Regional Mobility Authority (CTRMA) is an independent government agency created in 2002 to improve the transportation system in Williamson and Travis counties.

According to their website, their mission is “to implement innovative, multi-modal transportation solutions that reduce congestion and create transportation choices that enhance quality of life and economic vitality.”

The Mobility Authority was created and operates under the Texas Transportation Code Chapter 370 and is authorized under state law to implement a wide range of transportation systems including roadways, airports, seaports and transit services.

The Mobility Authority is authorized to issue revenue bonds to fund projects and can utilize user fees and/or taxes to fund operations and repay bonds.


 

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button