WEEKLY ROAD CONSTRUCTION SCHEDULE

LOCATION BEGIN DATE EST. END DATE
DURANGO STREET: Durango Street between Juarez Street and Monterrey Street will be closed for a reclaimed waterline project. Rockin Q Construction, 512.738.6666 Oct. 30
8 AM
May 1
5 PM
LP 82: All East-and Westbound lanes will be closed with detour. TxDOT, 512.393.8130TxDOT, 512.393.8130
Apr. 30
8 PM
May 1
6:00 PM
LP 82: Both the East & Westbound lanes will be reduced to a single lane during daytime hours. TxDOT, 512.393.8130
April 30
9 AM
May 5
3:30 PM
SESSION DRIVE: Sessom Drive from ED JL Green to Pleasant Street is scheduled to undergo a mill and overlay project for daily closures. Please use caution, drive slowly and watch for heavy equipment, construction workers, and traffic control flaggers. All vehicles should be parked off the street, or they may be towed at owner’s expense. Jesse Shroyer, 512.393.8036 Current
8 AM
May 18
5:30 PM
SESSOM DRIVE: Sessom Drive between Ed JL Green and Aquarena Springs will be closed for Utility Work. Mike Hammack Halff Associates 512.942.6213 May 14
9 AM
May 18
4 PM
LONG TERM – CHEATHAM STREET: Eastbound Cheatham Street between Riverside and CM Allen PKWY will be closed for city water main project. Jacob Snyder with Clara Construction, 214.298.4578
Apr. 23
8 AM
May 15
5 PM
LONG TERM – CRADDOCK AVENUE: Craddock Avenue between Old Ranch Road 12 and Bishop Street will have partial lane closures for median work. Community Enhancement, Amy Kirwin, 512.393.8419 Current
8 AM
Sept. 30
4 PM
LONG TERM CLOSURE – CHEATHAM STREET: Cheatham Street and the 400-500 Blocks of Guadalupe will have partial lane closures for new construction. Gary Bellomy with Cheatham Street, L.P., 512.694.8839 Present
Dec. 31


LONG TERM CLOSURE – OAK RIDGE DRIVE: Single lane closures daily for the installation of utility mains. City of San Marcos Engineering/CIP Dept., 512.393.8130 Present Aug.
2018
LONG TERM CLOSUREWOODS STREET: A segment of Woods Street between Comanche and North Street will be closed during construction of the new Texas State University Engineering & Science Building. Project Manager Scott Rouse, 512.245.2202 Aug.
2015
Aug.
2018
LONG TERM CLOSURE MCKIE STREET: Mckie St. will be closed from IH-35 Frontage Rd. to apartment entrance for utility installation. Rockin Q Construction, 512.738.6666 Current
8 AM
Dec. 7
5 PM
LONG TERM CLOSURE – MCKIE STREET: Mckie Street between the 400 and 600 blocks will be closed in both directions for the installation of a new water main. Erik Pelayo, Under Ground Water Solutions Co., 512.278.9333 Jan. 8
7 AM
Apr. 30
6 PM
LONG TERM CLOSURE – VISTA ST: All lanes in both directions will be closed from 310 – 312 Vista Street for utility construction. Texas State University, 512.245.2202 Present Aug. 1
2018
LONG TERM CLOSURELP 82/AQUARENA SPRINGS: TxDOT introduced a new traffic signal at the intersection of Post/Bobcat traffic will be detoured to the new signal. TxDOT, 512.393.8130 February
2017
Spring
2018
** CLOSURE EVERY SATURDAY – EAST SAN ANTONIO STREET: Half a block closed from the alley to N. LBJ every Saturday from for the Farmers Market on the Square. Main Street Program, 512.393.8430 Every
Saturday
8 AM
Every
Saturday
3 PM


 