The Work Never Ends: Look Out For These 183 South Road Construction Projects

Staff Report

Austin — Short and long term lane, road closures, and detours that may impact drivers along US 183 and adjacent roadways in east Austin.

Below is an overview of the 183 South project’s lane, road, and ramp closures. Work continues along US 183, including bridge construction, roadway installation, sound wall work, utility work.

The Central Texas Regional Mobility Authority is an independent government agency created in 2002 to improve the transportation system in Williamson and Travis counties.

The Mobility Authority is overseen by a seven-member Board of Directors. The Governor appoints the Chairman, and the Travis and Williamson counties Commissioners Courts each appoint three members to serve on the Board.

 

PLEASE NOTE THAT ALL CLOSURES ARE WEATHER PERMITTING AND SUBJECT TO CHANGE

US 183 Short & Long Term Closures & Detours

.
**Beginning Saturday, July 13, all northbound US 183 traffic will shift onto a new bridge over the Colorado River to accommodate the demolition and reconstruction of the existing northbound bridge.

The work will require a long-term closure of the northbound exit to Airport Boulevard, 7th Street, 5th Street, and East Cesar Chavez Street.

Northbound US 183 drivers wishing to reach those roads will continue north on US 183 to a U-turn located near Bolm Road.

After taking the U-turn and entering southbound US 183, they will exit at Levander Loop to access Airport Boulevard and the other downtown routes. In addition to this detour, a number of other travel routes will be impacted. Please visit our website for details.**
.

Short Term

LANE CLOSURE — 11/09/20 to 11/11/20 — DRAINAGE WORK
Monday-Wednesday (11/9-11) 9 a.m. to 3 p.m., US 183 southbound right general-purpose lane will be closed from Loyola to Tracor Ln. and eastbound MLK Blvd. right turn lane to US 183 will be closed.

LANE CLOSURE — 11/09/20 to 11/11/20 — DRAINAGE WORK
Monday-Wednesday (11/9-11) 9 a.m. to 3 p.m., US 183 southbound general-purpose right turn lane at MLK Blvd. will be closed.

LANE CLOSURE — 11/11/20 to 11/12/20 — EXCAVATION
Monday-Thursday (11/9-12) 9 a.m. to 3 p.m., US 183 southbound right general-purpose lane will be closed from Harold Ct. to Smith Rd.

LANE CLOSURE — 11/09/20 to 11/11/20 — DRAINAGE WORK
Monday-Wednesday (11/9-11) 9 a.m. to 3 p.m., US 183 northbound left general-purpose lane will be closed from MLK Blvd. to Loyola.

LANE CLOSURE — 11/09/20 to 11/11/20 — DRAINAGE WORK
Monday-Wednesday (11/9-11) 9 a.m. to 3 p.m., US 183 northbound toll right lane will be closed from MLK Blvd. to Loyola.

RAMP CLOSURE — 11/09/20 to 11/10/20 — PAVING
Monday (11/9) 8 p.m. to 6 a.m., US 183 southbound exit to westbound SH 71/ E. Riverside Dr. will be closed. Follow detour.

ROAD CLOSURE — 11/09/20 to 11/12/2020 — PEDESTRIAN BRIDGE CONSTRUCTION
Monday-Wednesday (11/9-11) 8 p.m. to 6 a.m., US 183 northbound main lane will be closed at Thompson. Detour via northbound general-purpose exit at Thompson to on-ramp at Central Ave for northbound toll or continue on general-purpose.

ROAD CLOSURE — 11/11/20 to 11/14/20 — DRAINAGE WORK
Wednesday-Friday (11/11-13) 8 p.m. to 6 a.m., US 183 southbound main lane will be closed at Smith Rd. Tolled/Non-tolled traffic detour via general-purpose Bolm Rd. exit to on-ramp at Gardner Rd.

 

 

.

Long Term

RAMP CLOSURE — 05/10/20 to 01/10/21 — ROADWAY BASE INSTALLATION
Beginning as early as this Sunday, May 10, the exit to E. Riverside Drive from westbound SH 71 will closed for several months. Detour to East Riverside Dr. via Montopolis Dr. and to reach SB US 183 use Patton Avenue U-turn.

ROAD CLOSURE — 10/11/18 to 12/31/20 — PERMANENT CLOSURE
The signalized crossing of US 183 at 51st Street is permanently closed and the traffic signal has been removed. Drivers must utilize the U-turns at MLK and Manor/Springdale Road as an alternative to cross over US 183.

ROAD CLOSURE — 10/15/18 to 12/31/20 — INTERSECTION WORK
The crossing of US 183 at Central Ave is permanently closed. Drivers will instead use the U-turns at MLK and Bolm Road to reach the other side of US 183.

ROAD CLOSURE — 10/15/18 to 12/31/20 — INTERSECTION WORK
The crossing of US 183 at Hudson Street is permanently closed. Drivers will instead use the U-turns at MLK and Bolm Road to reach the other side of US 183.

ROAD CLOSURE — 10/15/18 to 12/31/20 — INTERSECTION WORK
The Techni Center Drive crossing at US 183 is permanently closed

ROAD CLOSURE — 11/5/18 to 12/31/20 — ROADWAY BASE INSTALLATION
The US 183 underpass at Bolm Road is CLOSED PERMANENTLY to eastbound and westbound cross traffic and the traffic signal will be removed. Bolm Road eastbound traffic will detour via the south to north U-turn at Levander Loop to access US 183 northbound. Bolm Road westbound traffic will detour via a new temporary north to south U-turn located just north of Bolm Road to access US 183 Southbound.

 

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button