Top I-35 Construction Detours & Closures For Your Weekly Commute

.
TxDOT knows you’ve got to get where you need to go.

While construction is tough on everyone, TxDOT is trying to do
everything they can to minimize disruptions.

Remember to support your local businesses as they are still open during construction…

I-35 CAPITAL AREA CORRIDOR MOBILITY
…..Closures, Detours, Traffic Alerts for August 15 – August 21, 2020

 


I-35 AT POSEY ROAD

PROJECT OVERVIEW | This project will construct a new overpass on I-35 over Posey Road, add two new U-turns in each direction at Posey Road, perform ramp reversals and convert two-way frontage roads to one-way. Currently, the I-35 main lanes go under Posey Road with the new configuration,  I-35 main lanes will going over Posey Road.

This project is made possible by a partnership between Hays County/TxDOT and is expected to cost $31.7 million funded by TxDOT.

The I-35 and Posey Road construction started in February 2019 and anticipated construction completion is planned for mid-2021. The project contractor is Webber, LLC.

THIS WEEK’S PROJECT TRAFFIC ADVISORY

Closures are weather permitting

  • Posey Road bridge closed at I-35.
    ° Until further notice
  • Northbound I-35 Posey Road exit (#199) and Centerpoint Road exit (#200) are closed.
    ° Until further notice
  • Southbound I-35 entrance ramp closed permanently at Centerpoint Road.
    ° Until further notice

Read more on construction phasing and additional project details HERE.

I-35 FROM STASSNEY LANE TO WILLIAM CANNON DRIVE

PROJECT OVERVIEW | The project will reconstruct the bridge structures at Stassney Lane and William Cannon Drive, as well as the frontage road bridge over Williamson Creek. Bicycle and pedestrian enhancements are also being made, and new safety lighting is being installed.

New U-turn bridges will be added in both directions at Stassney Lane and William Cannon Drive, and the I-35 main lanes will be widened to incorporate shoulders and extended entrance/exit lanes to allow for better merging.

This major project is estimated to cost $78.8 million. Construction started in July 2016 with the anticipated completion in late 2020. The contractor for this project is OHL, USA, Inc.

THIS WEEK’S PROJECT TRAFFIC ADVISORY

Closures are weather permitting

  • Northbound I-35 right lane closed from Slaughter Lane to William Cannon Drive.
    ° Saturday, Aug. 15 from 7 AM until 10 AM
  • Northbound I-35 frontage road right lane closed from the Slaughter Lane entrance ramp to Stassney Lane.
    ° Saturday, Aug. 15 from 9 AM until 3 PM
  • Southbound I-35 frontage road right lane closed from Stassney Lane to the William Cannon Drive exit (#228).
    ° Saturday, Aug. 15 from 9 AM until 3 PM
  • Northbound I-35 frontage road left lane closed at William Cannon Drive.
    ° Monday, Aug. 17 through Saturday, Aug. 22 from 9 AM until 3 PM
  • Northbound I-35 frontage road right lane closed daily from William Cannon Drive to Stassney Lane.
    ° Monday, Aug. 17 through Saturday, Aug. 22 from 9 AM until 3 PM
  • Southbound I-35 frontage road left lane closed daily at Slaughter Lane.
    ° Monday, Aug. 17 through Saturday, Aug. 22 from 9 AM until 3 PM
  • Southbound I-35 frontage road right lane closed daily from Stassney Lane to William Cannon Drive.
    ° Monday, Aug. 17 through Saturday, Aug. 22 from 9 AM until 3 PM
  • Southbound I-35 frontage road left lane closed from William Cannon Drive to Slaughter Lane.
    ° Thursday, Aug. 20 from 9 PM until 5 AM
  • North to south I-35 U-turn closed at William Cannon Drive.
    ° Thursday, Aug. 20 from 9 PM until 5 AM
  • South to north I-35 U-turn closed at William Cannon Drive.
    ° Thursday, Aug. 20 from 9 PM until 5 AM

Read more on construction phasing and additional project details HERE.

I-35 AT NORTHWEST BOULEVARD

PROJECT OVERVIEW | This project will reconstruct the Northwest Boulevard bridge over I-35. The project will also construct a four-lane roadway with a roundabout and intersection improvements that connect to the new bridge.

The construction started in September 2019 and is anticipated to conclude in Fall 2020, weather permitting. The projected project cost is estimated at $8.15 million and the contractor is Chasco Constructors.

THIS WEEK’S PROJECT TRAFFIC ADVISORY

…………Closures are weather permitting

  • Northbound I-35 left lane closed nightly at Lakeway Drive.
    ° Sunday, Aug. 16 through Wednesday, Aug. 19 from 9 PM until 5 AM
  • Southbound I-35 reduced to one lane at Lakeway Drive.
    ° Sunday, Aug. 16 through Wednesday, Aug. 19 from 9 PM until 5 AM

Read more on construction phasing and additional project details HERE.

I-35 FROM RUNDBERG LN. TO US 290 EAST

PROJECT OVERVIEW | This project includes main lanes and frontage road reconstruction and the addition of three new flyovers at US 183.

I-35 from Rundberg Lane to US 290 East is estimated to cost $124.2 million and is made possible by Texas Clear Lanes Congestion Relief Fund.

The construction commenced in January 2018 with an anticipated completion date in mid-2021. The contractor for this project is J.D. Abrams.

THIS WEEK’S PROJECT TRAFFIC ADVISORY

Closures are weather permitting

  • Southbound US 183 Cameron Road exit closed.
    ° Through September
  • Southbound I-35 frontage road right lane closed nightly from Rundberg Lane to Barwood Park.
    ° Sunday, Aug. 16 through Thursday, Aug. 20 from 9 PM until 5 AM
  • Southbound I-35 frontage road left lane closed nightly from Blackson Avenue to Huntland Drive.
    ° Sunday, Aug. 16 through Thursday, Aug. 20 from 9 PM until 5 AM
  • Southbound I-35 frontage road closed nightly from Wonsley Drive to US 183. The US 183 exit (#240) will also be closed.
    ° Sunday, Aug. 16 through Thursday, Aug. 20 from 9 PM until 5 AM
  • Southbound US 183 frontage road closed nightly from I-35 to Providence Avenue.
    ° Sunday, Aug. 16 through Thursday, Aug. 20 from 9 PM until 5 AM
  • Eastbound and Westbound St. Johns Avenue closed nightly at the southbound I-35 frontage road.
    ° Sunday, Aug. 16 through Thursday, Aug. 20 from 9 PM until 5 AM
  • Northbound I-35 frontage road left lane closed daily from Camino La Costa to Blackson Avenue.
    ° Monday, Aug. 17 through Friday, Aug. 21 from 9 AM until 3 PM
  • Southbound I-35 frontage road left lane closed daily from Blackson Avenue to Huntland Drive.
    ° Monday, Aug. 17 through Friday, Aug. 21 from 9 AM until 3 PM

Read more on construction phasing and additional project details HERE.

I-35 FROM 1431 TO FM 3406 (NORTHBOUND)

PROJECT OVERVIEW | Improvements include relocating the exit ramp on the northbound I-35 frontage road to reduce vehicle congestion on I-35 mainlanes and improve the northbound frontage road by adding an extended exit lane between RM 1431 and FM 3406.

The estimated construction cost is $10.7 million. Construction commenced in mid-2019 with an anticipated completion date for early 2021. Jordan Foster Construction is the contractor for this project.

THIS WEEK’S PROJECT TRAFFIC ADVISORY

Closures are weather permitting

  • Northbound I-35 frontage road reduced to one lane from Jeffrey Way to the RM 1431 exit. 
    ° Through early 2021

Read more on construction phasing and additional project details HERE.

I-35 FROM GRAND AVENUE PARKWAY TO SH 45 NORTH

PROJECT ACTIVITY | Improvements include reversing ramps, constructing an extended entrance/exit lane on the northbound I-35 mainlanes under SH 45 North, along the frontage road, installing high-mast lighting, and improvements at Picadilly Drive and the I-35 frontage road.

The projected cost is estimated at $8.2 million and funded by CAMPO and TxDOT. Construction will start August 2020 and anticipated to be complete in mid-2021. The project contractor is Jordan Foster Construction.

THIS WEEK’S PROJECT TRAFFIC ADVISORY

• NONE AT THIS TIME •

Read more on construction phasing and additional project details HERE.

I-35 AT PARMER LANE

PROJECT OVERVIEW | Reduced congestion, improved mobility at Parmer Lane and Lamar Boulevard, operational efficiency, more reliable travel times, lower fuel consumption.

The estimated construction cost for this project is funded by Texas Clear Lanes and Capital Area Metropolitan Planning Organization (CAMPO) with an estimated cost of $24.6 million.

Construction started in July 2019 with an estimated timeline to be completed by mid-2021. Primoris Services Corporation as the project contractor.

THIS WEEK’S PROJECT TRAFFIC ADVISORY

• NONE AT THIS TIME •

Read more on construction phasing and additional project details HERE.

I-35 CORRIDOR ROAD & HIGHWAY MAINTENANCE

PROJECT OVERVIEW | These lane closures are associated with ongoing maintenance activities throughout the corridor

THIS WEEK’S PROJECT TRAFFIC ADVISORY

Closures are weather permitting

  • Northbound I-35 reduced to one lane from SH 195 to Ronald Reagan Boulevard.
    ° Friday, Aug. 14 from 8 PM until 6 AM
  • Northbound I-35 reduced to one lane from Lakeway Drive to FM 972.
    ° Tuesday, Aug. 18 through Wednesday, Aug. 19 from 8 PM until 6 AM

Read more on construction phasing and additional project details HERE.


Related Articles

One Comment

  1. In terms of construction detour and closure for your weekly commute, the contractor needs to do traffic control places throughout the limits of the project construction zone. so that the commuter will be aware of the construction detour.

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button