UPDATE: MyI35 Cancels Weekly Road Construction Projects Due To #harvey

UPDATE: MyI35 Cancels Weekly Road Construction Projects Due To #harvey

TxDOT knows you’ve got to get where you need to go.

While construction is tough on everyone, TxDOT is trying to do everything they can to minimize disruptions. TxDOT knows you’ve got to get where you need to go.

•  I – 3 5   L A N E   C L O S U R E   A L E R T S  •  F R I D A Y  8/18  –  F R I D A Y  8/25  •

 



I – 3 5   N o r t h   F e e d e r   R d.   E x i t   2 0 8


 

• THIS WEEK’S PROJECT TRAFFIC ADVISORY • 

Closures are weather permitting.

 

 

 

  • Northbound I-35 frontage road left lane closed at Saddle Run Way for one mile — 9 a.m. Monday, August 28 to 3 p.m. Thursday, August 31.

 

Read more on construction phasing and additional project details HERE.

zzz



 

I – 3 5   F R O M   U S   7 9   T O   S H   4 5  N O R T H

New braided ramps (where one ramp crosses over the other) are being constructed along the northbound I-35 mainlanes between Hester’s Crossing and RM 620 to eliminate merging conflicts. The northbound and southbound intersections of US 79 and the I-35 frontage roads are also being reconstructed to add a third left-turn for westbound US 79.

zzz

• THIS WEEK’S PROJECT TRAFFIC ADVISORY • 

Closures are weather permitting.

  • Southbound I-35 reduced to one lane between Westinghouse Rd & US 79/Sam Bass Rd. Expect alternating ramp closures. — Nightly from 9 p.m. until 5 a.m. Sunday, August 28 through Thursday, August 31 

 

 

 

  • Northbound & Southbound I-35 frontage road closures between RM 620 & FM 3406 — Nightly from 8 p.m. until 5 a.m. Tuesday, August 29 through Thursday, August 31

 

Read more on construction phasing and additional project details HERE.



I – 3 5   A T   5 1  S T   S T R E E T

Work includes adding a southbound intersection bypass lane to allow through-traffic to bypass the traffic signal, re-configuring the entrance/exit ramps, and realigning the southbound frontage road to add a new roundabout that improves traffic flow and safety.

Bicycle and pedestrian enhancements will also be made within the project limits.

• THIS WEEK’S PROJECT TRAFFIC ADVISORY •

Closures are weather permitting.

  • Northbound I-35 ramps between Barbara Jordan Dr & 52nd St closed — 10 p.m. Thursday, August 24 to 4 a.m. Friday, August 25

 

Read more on construction phasing and additional project details HERE.



I – 3 5   A T   O L T O R F   S T R E E T

Improvements include the reconstruction of the Oltorf Street bridge, improving entrance/exit ramps and frontage roads, constructing new extended entrance/exit lanes for mainlanes and ramps, and adding U-turns in both directions at Oltorf Street.

Bicycle and pedestrian enhancements will also be made along the I-35 frontage roads in each direction within the project limits.

• THIS WEEK’S PROJECT TRAFFIC ADVISORY •

Closures are weather permitting.

  • I-35 reduced to one lane in both directions at Oltorf St. Eastbound & westbound Oltorf St will close at I-35. The ramps at Oltorf will also close. — From 10 p.m. until 6 a.m. Tuesday, August 29 & Wednesday, August 30.

 

  • Northbound frontage road right lane closed between Woodward St & Oltorf St. — From 9 p.m. until 5 a.m. Wednesday, August 30 & Thursday, August 31.

zzz

Read more on construction phasing and additional project details HERE.



I – 3 5   F R O M   S T A S S N E Y   L A N E   T O   W I L L I A M   C A N N O N   D R I V E

The project will reconstruct the bridge structures at Stassney Lane and William Cannon Drive, as well as the frontage road bridge over Williamson Creek.

New U-turn bridges will be added in both directions at Stassney Lane and William Cannon Drive, and the I-35 mainlanes will be widened to incorporate shoulders and extended entrance/exit lanes to allow for better merging.

Bicycle and pedestrian enhancements are also being made, and new safety lighting is being installed. 

• THIS WEEK’S PROJECT TRAFFIC ADVISORY •

Closures are weather permitting.

 

  • Northbound I-35 frontage road right lane closed between Slaughter Ln & William Cannon Dr. Daily from 9 a.m. until 3 p.m. Monday, August 28 through Thursday, August 31.

Read more on construction phasing and additional project details HERE.

                                



I – 3 5   A T   F M   3 4 0 6

TRAFFIC ALERT: I-35 Mainlanes and FM 3406 to close for U-turn bridge construction.

 

• THIS WEEK’S PROJECT TRAFFIC ADVISORY •

Closures are weather permitting

  • Northbound I-35 reduced to one lane under FM 3406 — Nightly from 9 p.m. until 5 a.m. Monday, August 28 to

 

Read more on construction phasing and additional project details HERE.

 



My I35 Traffic Alerts are provided by Central Texas Regional Mobile Authority (CTRMA) & TxDOT.

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button