What To Expect On San Marcos Roads During Week Of July 9 – July 15

San Marcos’ Weekly Road Construction & Traffic Report

Short & Long Term Road Construction Projects Affecting San Marcos Traffic Sunday, July 9 – Saturday, July 15, 2017

WEEKLY ROAD CONSTRUCTION SCHEDULE

 

LOCATION BEGIN DATE EST. END DATE
W WOODS/N COMANCHE ST: Woods Street between Comanche Street and Talbot Street, as well as Woods Street between N. Guadalupe Street and N. LBJ Drive will be closed in order to facilitate underground utility work that will serve the new Engineering and Science Building. During this closure, the Bus Stop at UAC has been temporarily relocated to the intersection of Concho Street and N. LBJ Drive. Texas State University, 512.245.2202   May 15    7 a.m.     Aug 18     4 p.m
N EDWARD GARY ST: A complete road closure will be in effect from Hutchison to Hopkins for maintenance/construction for a new parking area, weather permitting. Joey Barbeauld, EMJ, 423.240.4738    July 9     8 p.m.    July 14   6 a.m.
300 E HUTCHISON St: Parking area on south side of the street from Edward Gary to the east side alley will be closed for maintenance/construction, weather permitting. Joey Barbeauld, EMJ, 423.240.4738  June 26    6 a.m.      July 14     6 p.m.
N EDWARD GARY ST: Northbound lane will be closed for maintenance / construction for a new parking area, weather permitting. Joey Barbeauld, EMJ, 423.240.4738  June 25   6 a.m.   July 18   6 p.m.
COMANCHE ST: the south bound lane of Comanche Street from Lindsey Street to Alkek Garage will be closed for underground utility and site work that will serve the new Engineering and Science Building. Access will be provided to Alkek and Wood Street Garages. Texas State University, 512.245.2202  May 22    7 a.m. Aug 16 2017
DALE ST: A mill and overlay project will begin on Dale St from Stokes to Perkins St, weather permitting. This is not a road closure but a notice to be aware of the construction zone and obey traffic control flaggers. Please park your vehicle off the street or it may be towed at your expense. City of San Marcos Street Dept., 512.393.8025     July 11         Aug 11     
316 EDWARD GARY (ALLEY): A complete road closure will be in effect for the alley behind 316 Edward Gary between Hutchison and University Drive for water utility work and street maintenance. City of San Marcos Streets Dept., 512.393.8025 July 1 July 14
LONG TERM CLOSURE – VISTA ST: All lanes in both directions will be closed from 310 – 312 Vista Street for utility construction Texas State University, 512.245.2202 Present    Aug    2018
LONG TERM CLOSURE – SESSOM DR: Various lane closures from N. LBJ to Aquarena Springs Dr. for road construction. City of San Marcos Engineering/CIP Dept., 512.393.8130 Present Jan 2018
LONG TERM CLOSURE – N LBJ:  From Holland St. to Camaro Way, this road closure will occur during daytime construction hours. City contractor will be replacing utility lines in the area. Through traffic including Emergency Vehicles, will be routed around the project limits; please follow the detours. Engineering/Capital Improvements, 512.393.8130 Present Summer 2017
LONG TERM CLOSURE – WOODS ST: A segment of Woods St between Comanche and North Street will be closed during construction of the new Texas State University Engineering & Science Building. Project Manager Scott Rouse, 512.245.2202 August 2015 August 2018
LONG TERM CLOSURE – EAST SAN ANTONIO STREET – EVERY SATURDAY: Half a block closed from the alley to N. LBJ every Saturday from 8 a.m. – 3 p.m. for the Farmers Market on the Square. Main Street Program, 512.393.8430 Year  Round Year Round

 

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button