Jannah Theme License is not validated, Go to the theme options page to validate the license, You need a single license for each domain name.

SM Weekly Traffic & Road Construction Update

LOCATION BEGIN DATE EST. END DATE
 McCARTY LANE: As part of the City’s new pavement management program to provide preventative maintenance to city streets, McCarty Lane from IH-35 to the railroad crossing will undergo street maintenance on June 13 – 24 daily from 8 a.m. – 5 p.m. Project length is estimated 5 days, weather permitting. Please park vehicles off the street or they may be towed at owners’ expense. City of San Marcos Streets Dept., 512.393.8025  June 13 @ 8 a.m.  June 24 @ 5 p.m.
WONDER WORLD DRIVE AT THE CENTER TEXAS MEDICAL CENTER: City contractor will be working in the area to repair a water leak. The closure is currently scheduled for June 22 – 24, weather permitting. Future closures will also occur through the end of June as needed. The outside lane of westbound Wonder World Drive will be reduced to 10 foot during the day. The outside lane of eastbound Wonder World Drive will be closed from 9 a.m. until 4 p.m. Project will last until the end of June. Engineering/Capital Improvements, 512.393.8130 June 14 @ 9 a.m. End of June
SESSOM DR.: On Sessom Drive between Aquarena and State St., the right eastbound lane will be closed for the maintenance of water quality devices on Thursday, June 23 from 7 a.m. – 5 p.m. City of San Marcos Drainage Dept., 512.393.8019 June 23 @ 7 a.m. June 23 @ 5 p.m.
BARBARA DRIVE: On Barbara Drive from Bugg Lane to River Rd. Street maintenance will start on June 27 through July 1, weather permitting, from 7 a.m. – 5 p.m. daily. Please park your vehicle off the street or it may be towed at your own expense. City of San Marcos Streets Dept., 512.393.8025 June 27 @ 7 a.m. July 1 @ 5 p.m.
 ED JL GREEN: From Sessom St. to Laurel Ridge, maintenance will start on July 6 – 29, weather permitting, from 7 a.m. – 5 p.m. daily. Please park your vehicle off the street or it may be towed at your own expense. City of San Marcos Streets Dept., 512.393.8025  July 6 @ 7 a.m.  July 29 @ 5 p.m.
CONCHO ST/ N LBJ DRIVE: Emergency Road closure for the intersection of Concho and N LBJ due to an emergency waterline repair. The road will remain closed until water main repairs and repaving are finished with an estimated completion date prior to Wednesday June 22. Texas State University, 512.245.7299  Present  June 22
CHARLES AUSTIN/LP 82: The outside right lane eastbound and westbound of Aquarena Springs from Sessom to Charles Austin intersection will be closed June 21 from 9 a.m. to 4 p.m. for the installation of traffic signal poles on south and north side of the road. Please use alternate route as detour. TxDOT, 512.619.4676 June 21 @ 9 a.m. June 21 @ 4 p.m.
120 E. SAN ANTONIO: The alley way between the Marc and Allstate will be closed to all traffic from 8 a.m. to midnight on Monday June 20 for Texas Music Scene Filming. The Marc, 214.546.8473 June 20 @ 8 a.m. June 21 @ 12 a.m.
MOORE ST/BISHOP ST: North bound and south bound Moore to Bishop St. will be closed for milling, chipseal and paving road maintenance on June 13 – 24 from 8 a.m. – 5 p.m. Detour will be through Craddock. TxDOT, 512.709.5969 June 13 @ 8 a.m. June 24 @ 5 p.m.
 IH35/NORTHBOUND FRONTAGE RD: Northbound frontage road just north of the Blanco River and south of Yarrington Road will be closed on June 6 – 10 from 9 a.m. to 3 p.m. daily for ramp maintenance. The closure will only be utilized if the conditions are unsuitable on the existing construction entrance. TxDOT, 281.682.4126 June 6 @ 9 a.m.  June 10 @ 3 p.m
ED J.L. GREEN: Advance notice of street maintenance from Sessom Dr. to Laurel Ridge on March 8 through April 11 from 8 a.m. to 5 p.m daily, except weekends. Please park your vehicle off the street or it may be towed. Project is estimated to last approximately 4 to 6 weeks, weather permitting. City of San Marcos Street Dept., 512.393.8025 Postponed Postponed
817 CHESTNUT ST: One lane will be closed for new construction to site   through June 10, 2016. Street will continue to be passable to all traffic. J4 Development, 469.236.0922 Present End of July 2016
 NORTH LBJ FROM CAMARO WAY TO CRADDOCK: This road will be open to two-way traffic, but the lanes will be shifted west to allow space for the City contractor to construct a new lift station on the corner of N. LBJ and Craddock. Project will last until summer 2016. Engineering/CIP, 512.393.8130 Present Summer 2016
EAST SAN ANTONIO STREET: Half a block closed from the alley to N. LBJ every Saturday from 8 a.m. – 3 p.m. for the Farmers Market on the Square. Main Street Program, 512.393.8430. Year Round  

Year Round

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button