LOCATION | BEGIN DATE | EST. END DATE |
---|---|---|
LP 82: Both the East-and Westbound lanes will be reduced to a single lane during night time hours. TxDOT, 512.393.8130 |
July 23 8:00 AM |
July 29 6 PM |
NORTH LBJ: North LBJ from Conch Street to University Street will have alternating lane closures for paving. Please use caution, drive slowly and watch for heavy equipment, construction workers, and traffic control flaggers. Bob Quinn, Rockin Q Construction, 512.738.6666 | July 31 8 AM |
Aug. 3 6 PM |
MEDICAL PARKWAY: Medical Parkway from Wonder World to Leah Ave. is scheduled to undergo a Mill and Asphalt Overlay. Please use caution, drive slowly and watch for heavy equipment, construction workers, and traffic control flaggers. All vehicles should be parked off the street. Or they may be towed at owner’s expense. Jesse Shroyer, 512.393.8036 | June 27 7 AM |
July 31 5:30 PM |
VISTA STREET: Vista street will have all lanes in both directions will be closed from 310 – 312 for utility construction. Texas State University, 512.245.2202 | Present 8 AM |
July 31 6 PM |
BISHOP STREET: Bishop Street at Belvin Street and West San Antonio will have partial lane closures for Geotechnical Boring. Please use caution, drive slowly and watch for construction workers, and traffic control flaggers. Michael C. Fucinari, 210.415.4447 |
July 30 8 AM |
July 31 4:00 PM |
• LONG TERM CLOSURE – MCKIE STREET: The 400 and 600 blocks of Mckie Street will be closed in both directions for the installation of a new water main. Erik Pelayo, Under Ground Water Solutions Co., 512.278.9333 |
Current 7 AM |
Aug. 31 6:00 PM |
• LONG TERM CLOSURE – STUDENT CENTER DRIVE: Student Center Drive from Matthews to the North Loading Dock of the Alkek Library will be closed for the expansion of the LBJ Student Center. Service and delivery access to Alkek Library and Derrick Hall loading docks will be available, via Russell and Pickard Streets. Texas State University, 512.245.2202 |
Current | Jan. 21 2020 |
• LONG TERM CLOSURE – CRADDOCK AVENUE: Craddock Avenue between Old Ranch Road 12 and Bishop Street will have partial lane closures for median work. Community Enhancement, Amy Kirwin, 512.393.8419 | Current 8 AM |
Sept. 30 4 PM |
• LONG TERM CLOSURE – CHEATHAM STREET & GUADALUPE: Cheatham Street and the 400-500 Blocks of Guadalupe will have partial lane closures for new construction. Gary Bellomy, Cheatham Street, L.P., 512.694.8839 | Present | Dec. 31 2018 |
• LONG TERM CLOSURE – OAK RIDGE DRIVE: Single lane closures daily for utility installation. City of San Marcos Engineering/CIP Dept., 512.393.8130 | Present | Sept. 3:30 PM |
• LONG TERM CLOSURE – WOODS STREET: A segment of Woods Street between Comanche and North Street will be closed during construction of the new Texas State University Engineering & Science Building. Scott Rouse, Project Manager, 512.245.2202 | Aug. 2015 |
Aug. 2018 |
• LONG TERM CLOSURE – MCKIE STREET: Mckie St. will be closed from IH-35 Frontage Rd. to apartment entrance for utility installation. Rockin Q Construction, 512.738.6666 | Current 8 AM |
Dec. 7 5 PM |
• LONG TERM CLOSURE – CONCHO STREET: Eastbound Concho Street between LBJ and Guadalupe will be closed, LBJ and Guadalupe will also have narrow lanes between University Drive and Concho Street, through the summer of 2020 for Construction. 3411 Builders, Inc., Richard Bagby, 832.449.0328 | Aug. 6 2018 |
July 2020 |
• LONG TERM CLOSURE – CM ALLEN: CM Allen between University Drive and Hopkins Street will be closed for the Reconstruction of the Roadway. City of San Marcos Engineering/CIP Dept., 512.393.8130 | July 25 9 AM |
Apr. 2019 5 PM |
** CLOSURE EVERY SATURDAY – EAST SAN ANTONIO STREET: Half a block closed from the alley to N. LBJ every Saturday from for the Farmers Market on the Square. Main Street Program, 512.393.8430 | Every Saturday 8 AM |
Every Saturday 3 PM |