Traffic Update For Week of Thanksgiving Is Here

View San Marcos Traffic Update in a larger map

Location Begin Date Est. End Date
     
SPRINGTOWN WAY: A mill and overlay project will begin on Springtown Way on November 16 from 7 a.m. – 5 p.m. daily, weather permitting, for the exception of Saturday and Sunday. The project will last 4 to 6 weeks. City of San Marcos Streets Dept., 512.393.8025 Nov. 16 @ 7 a.m. Nov. 16 @ 5 p.m.
RATTLER ROAD 5K RACE: Rattler Rd. from San Marcos High School to HWY 123 will be closed to through traffic from 7 a.m. to 10 a.m. on Saturday, November 19 for the Rock N Rattler 5k race. Ray Martinez, 512.644.1743 Nov. 19 @ 7 a.m. Nov. 19 @ 10 a.m.
 COMANCHE: Southbound Comanche between Lindsey and Pat Garrison will close on Monday, Nov. 7 and Nov. 11 from 7 a.m. – 2 p.m. for construction maintenance. Be aware of flaggers. Skyline builders/Matthew Ostrowski, 512.699.6465 Nov. 7 @ 7 a.m – 2 p.m.  Nov. 11 @ 7 a.m. – 2 p.m.
100 S. LBJ: Imagine Alley, located off of the 100 block of S. LBJ will be closed for a Wine and Waissal Walk event on Friday, November 11 from 5 p.m. – 9 p.m. City of San Marcos Main Street Program, 512.393.8430 Nov. 11  @ 5 p.m. Nov. 11 @ 9 p.m.
IH 35/ HWY 123: Southbound frontage road off of IH 35 to RM 12 will have intermittent lane closures for guardrail installation and striping on November 14 – 18 from 8 p.m. to 5 a.m., weather permitting. TxDOT, 512.709.5969 Nov. 14 @ 8 p.m. Nov. 18 @ 5 a.m.
120 E. SAN ANTONIO ST: The alley located between Allstate and The Marc will be closed for tour bus parking during filming of Texas Music Scene on Wednesday, November 16 from 6 a.m. to 6 a.m. and also on November 18, 19 & 20 from 2 p.m. to 2 p.m. daily. Omar Dawoud, 512.787.3771 Nov. 16 @ 6 a.m. to 6 a.m.  Nov. 18 – 20 @ 2 p.m. to 2 p.m.
MILL ST.: All lanes in both directions will be closed between Lockhart and Mill St. and Uhland and First St. on Nov. 1 – 11 from 8 a.m. to 5 p.m. daily, weather permitting, for street maintenance. City of San Marcos Engineering/Capital Improvement/Cobb Fendley & Associates, 713.485.8058 Nov. 1 @ 8 a.m. Nov. 11 @ 5 p.m.
SESSOM DR: From N.LBJ to Aquarena Springs. There will be alternating multi-lane closures for overhead utility work associated with the Sessom Bike/Pedestrian project along Sessom. Daily closures will start on Oct. 24, 2016 and last through Jan. 1, 2017, weather permitting. There will be some occasional overnight lane closures required. San Marcos Electric Utility Dept., 512.393.8300 Present Jan. 1, 2017
106 CHARLES AUSTIN DR: Due to the demolition of the Riverside Apartments, the parking lots serving them will be under construction Sept. 26 – Nov. 10. There are no road closures, but drivers are asked to be aware of construction zone. TXST, 512.245.2202 Sept. 26 Nov. 10
817 CHESTNUT ST: One lane will be closed for new construction to site through end of November. Street will continue to be passable to all traffic. J4 Development, 469.236.0922 Present End of November 
N LBJ:  From Holland St. to Camaro Way will be closed to through traffic until the Spring of 2017. Road closure will occur during daytime construction hours. City contractor will be replacing utility lines in the area. Through traffic including Emergency Vehicles, will be routed around the project limits; please follow the detours. Engineering/Capital Improvements, 512.393.8130 Present Spring 2017
WOODS ST: A segment of Woods St between Comanche and North Street will be closed during construction of the new Texas State University Engineering & Science Building beginning Monday, August 15 until August 2018. Project Manager Scott Rouse, 512.245.2202 Aug 15, 2016 August 2018
EAST SAN ANTONIO STREET: Half a block closed from the alley to N. LBJ every Saturday from 8 a.m. – 3 p.m. for the Farmers Market on the Square. Main Street Program, 512.393.8430. Year Round

 

 Year Round

     

Street Maintenance

Low Water Crossing & Common Flood-Prone Streets
1400 block Uhland Road at Blanco River
Cape Road at San Marcos River
200 block C.M. Allen Parkway at Children’s Park
1600 block Hunter Road at Purgatory Creek
William Pettus Road at the Creek
900 block of Cheatham Street & Sycamore Street
McKie Street at IH 35
300 block of Ellis between Knox & Alabama Streets
200 – 400 block of South LBJ between Cheatham and MLK

 

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button