I35 Corridor Weekly Road Construction Alerts For Saturday, April 7 – Saturday, April 13

TxDOT, My I35 and Central Texas Regional Mobility Authority’s Weekly I35 Corridor Traffic and Road Construction Update…

TxDOT knows you’ve got to get where you need to go.

While construction is tough on everyone, TxDOT is trying to do
everything they can to minimize disruptions.

•  I – 3 5    L A N E    C L O S U R E    A L E R T S  •

•  S A T U R D A Y    4 / 7   –   S A T U R D A Y    4 / 13  •

 

 



I – 3 5   T O   F M   3 4 0 6

PROJECT OVERVIEW | The intersection of FM 3406 and the I-35 frontage roads are being improved, and the FM 3406 bridge over I-35 is being reconstructed.

THIS WEEK’S PROJECT TRAFFIC ADVISORY

Closures are weather permitting

 

  • The FM 3406 (Old Settlers Blvd) bridge will close to eastbound traffic. Westbound traffic will detour to the newly constructed U-turn bridge. | Until summer 2018.

Read more on construction phasing and additional project details HERE.



I – 3 5   A T   O L T O R F   S T .

PROJECT OVERVIEW | Improvements include the reconstruction of the Oltorf Street bridge, improving entrance/exit ramps and frontage roads, constructing new extended entrance/exit lanes for mainlanes and ramps, and adding U-turns in both directions at Oltorf Street.

Bicycle and pedestrian enhancements will also be made along the I-35 frontage roads in each direction within the project limits.

THIS WEEK’S PROJECT TRAFFIC ADVISORY

Closures are weather permitting

 

  • Southbound I-35 frontage road left lane closed at Oltorf St. | Nightly from 8 PM until 5 AM Sunday, April 8 through Wednesday, April 11.

 

  • Northbound I-35 two left lanes closed approaching and under Oltorf St. | Nightly from 10 PM until 5 AM Sunday, April 8 through Thursday, April 12.

 

  • I-35 frontage roads right lane closed in both directions as needed between Woodard St. and Oltorf St. Watch for flaggers. | Daily from 9 AM until 3 PM Monday, April 9 through Friday, April 13.

 

  • Southbound I-35 left lane closed in each direction at Oltorf St. | 10 PM Monday, April 9 to 6 AM Tuesday, April 10.

 

  • Oltorf St. eastbound right lane closed across I-35. | Nightly from 8 PM until 5 AM Sunday, April 8 through Wednesday, April 11.

 

Read more on construction phasing and additional project details HERE.



I – 3 5   F R O M   R U N D B E R G   L N .   T O   U S   2 9 0   E A S T

PROJECT OVERVIEW | This project includes main-lanes and frontage road reconstruction and the addition of three new flyovers at US 183.

The project also includes reconstruction of the St. Johns Avenue Bridge, the addition of frontage road U-turns on both sides, intersection bypass lanes under St. Johns Avenue in both directions, extended entrance/exit lanes, and ramp and shoulder improvements.

THIS WEEK’S PROJECT TRAFFIC ADVISORY

Closures are weather permitting

 

  • Southbound I-35 frontage road right lane closed between Park Plaza Dr. & E. Powell Ln. | Until 5 AM Monday, April 30.

 

  • Southbound I-35 frontage road right lane closed between Huntland Dr. & US 290 E. | Until 5 AM Tuesday, July 3.

 

  • Powell St. closed at I-35. Detour via Wonsley St. or Georgian Dr. | Until 5 AM Friday, April 13.

 

  • Southbound I-35 frontage road right lane closed between US 183 to US 290 E. | Nightly from 9 PM until 5 AM Thursday, April 4 through Friday, April 13.

 

  • Southbound I-35 frontage road right lane closed between Huntland Dr. & Koenig Ln. | Nightly from 9 PM until 5 AM Sunday, April 8 through Thursday, April 12.

 

  • Southbound I-35 right lane closed between US 183 & US 290 E. The southbound exit to US 290 E./RM 2222 will also close. | Nightly from 10 PM until 5 AM Monday, April 9 through Thursday, April 12.

 

  • Northbound I-35 left lane closed between US 290 E. & US 183. | Nightly from 9 PM until 5 AM Tuesday, April 10 through Thursday, April 12.

 

  • Northbound I-35 reduced to one lane between Yager Ln. & Grand Ave. Parkway. The entrance ramps will also close as needed. | From 9 PM until 5 AM Wednesday, April 11 & Thursday, April 12.

 

Read more on construction phasing and additional project details HERE.



I – 3 5   F R O M   U S   7 9   T O   S H   4 5   N O R T H

PROJECT OVERVIEW | New braided ramps (where one ramp crosses over the other) are being constructed along the northbound I-35 mainlanes between Hester’s Crossing and RM 620 to eliminate merging conflicts.

The northbound and southbound intersections of US 79 and the I-35 frontage roads are also being reconstructed to add a third left-turn for westbound US 79.

• THIS WEEK’S PROJECT TRAFFIC ADVISORY •

Closures are weather permitting

  • Northbound I-35 frontage road left lane closed between Mays Crossing & McNeil Rd. | From 8 PM until 5 AM Tuesday, April 10.

 

Read more on construction phasing and additional project details HERE.



I – 3 5   F R O M   S T A S S N E Y   L N .   T O   W I L L I A M   C A N N O N   D R.

PROJECT OVERVIEW | The project will reconstruct the bridge structures at Stassney Lane and William Cannon Drive, as well as the frontage road bridge over Williamson Creek.

New U-turn bridges will be added in both directions at Stassney Lane and William Cannon Drive, and the I-35 mainlanes will be widened to incorporate shoulders and extended entrance/exit lanes to allow for better merging.

Bicycle and pedestrian enhancements are also being made, and new safety lighting is being installed.

• THIS WEEK’S PROJECT TRAFFIC ADVISORY •

Closures are weather permitting

  • Northbound I-35 reduced to one right lane between Boggy Creek Dr. & Stassney Ln. | Nightly from 9 PM until 5 AM Sunday, April 8 through Thursday, April 12.

 

  • Southbound I-35 left lane closed under William Cannon Dr. | Nightly from 10 PM until 6 AM Sunday, April 8 through Wednesday, April 11.

 

  • Southbound I-35 frontage road closed between Stassney Lane and William Cannon Dr. | 9 AM until 3 PM Monday, April 9.

 

  • I-35 frontage roads will have various closures in both directions between Stassney Ln. and William Cannon Dr. Watch for flaggers. | Daily from 9 AM until 3 PM Monday, April 9 through Friday, April 13.

 

  • Northbound I-35 frontage road right lane closed between William Cannon Dr. and Stassney Ln. | 9 AM until 3 PM Tuesday, April 10.

 

  • Southbound I-35 reduced to left lane between William Cannon Dr. and entrance ramp before Slaughter Ln. | 10 PM Thursday, April 12 until 6 AM, Friday, April 13. 

Read more on construction phasing and additional project details HERE.


My I35 Traffic Alerts are provided by Central Texas Regional Mobile Authority (CTRMA) & TxDOT.


 

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button