MyI35 Corridor Weekly Road Construction Alerts For Sunday, Oct. 15 – Friday, Oct. 20

TxDOT, My I35 and Central Texas Regional Mobility Authority’s Weekly Corridor Traffic and Road Construction Update for the IH-35 Corridor

TxDOT knows you’ve got to get where you need to go.

While construction is tough on everyone, TxDOT is trying to do everything they can to minimize disruptions. TxDOT knows you’ve got to   get where you need to go.

•  I – 3 5   L A N E   C L O S U R E   A L E R T S  •  F R I D A Y  1 0 / 1 5  –  F R I D A Y  1 0 / 2 0  •

 



I – 3 5   F R O M   U S   7 9   T O   S H   4 5  N O R T H

PROJECT OVERVIEWNew braided ramps (where one ramp crosses over the other) are being constructed along the northbound I-35 mainlanes between Hester’s Crossing and RM 620 to eliminate merging conflicts.

The northbound and southbound intersections of US 79 and the I-35 frontage roads are also being reconstructed to add a third left-turn for westbound US 79.

• THIS WEEK’S PROJECT TRAFFIC ADVISORY • 

Closures are weather permitting.  

  • Northbound I-35 reduced to one lane between RM 620 & Westinghouse Rd. Ramps will close as needed. | Nightly from 9 p.m. until 5 a.m. Monday, October 16 through Thursday, October 19

 

 

  • Southbound to northbound U-turn closed at US 79 | From 8 p.m. until 5 a.m. Tuesday, October 17

Read more on construction phasing and additional project details HERE.



I – 3 5   A T   O L T O R F   S T R E E T

PROJECT OVERVIEW | Improvements include the reconstruction of the Oltorf Street bridge, improving entrance/exit ramps and frontage roads, constructing new extended entrance/exit lanes for mainlanes and ramps, and adding U-turns in both directions at Oltorf Street.

Bicycle and pedestrian enhancements will also be made along the I-35 frontage roads in each direction within the project limits.

• THIS WEEK’S PROJECT TRAFFIC ADVISORY •

Closures are weather permitting.

  • Alternating closures northbound I-35 frontage road between Woodward St & Oltorf St | Daily from 9 a.m. until 3 p.m. Monday, October 16 through Thursday, October 19

 

  • Southbound I-35 frontage road right lane closed at Oltorf St | Nightly from 8 p.m. until 5 a.m. Monday, October 16 through Wednesday, October 18

 

  • Northbound I-35 reduced to one right lane between Woodward St & Woodland Ave exit | Nightly from 10 p.m. until 6 a.m. Monday, October 16 through Wednesday, October 18

 

  • Southbound I-35 right lane closed at Oltorf St | Nightly from 10 p.m. until 6 a.m. Monday, October 16 through Wednesday, October 18

 

  • Alternating single lane closures northbound I-35 frontage road between Cesar Chavez & Martin Luther King Jr | Nightly from 10 p.m. until 6 a.m. Monday, October 16 through Wednesday, October 18

 

  • Alternating single lane closures southbound I-35 between Airport Blvd & Martin Luther King Jr | Nightly from 9 p.m. until 5 a.m. Monday, October 16 through Wednesday, October 18

Read more on construction phasing and additional project details HERE.



 

I – 3 5   A T   5 1 S T   S T R E E T

PROJECT OVERVIEWWork includes adding a southbound intersection bypass lane to allow through-traffic to bypass the traffic signal, re-configuring the entrance/exit ramps, and realigning the southbound frontage road to add a new roundabout that improves traffic flow and safety.

Bicycle and pedestrian enhancements will also be made within the project limits. 

• THIS WEEK’S PROJECT TRAFFIC ADVISORY •

Closures are weather permitting.

  • Southbound I-35 Airport Blvd exit ramp closed. The new Airport Blvd exit ramp will open north of 51st Street on Oct. 30. | Temporarily closed until Monday, October 30

 

 

  • Southbound I-35 right lane closed between 51st St & Airport Blvd | From 9 p.m. until 5 a.m. Sunday, October 15

Read more on construction phasing and additional project details HERE.



I – 3 5   F R O M   S T A S S N E Y   L A N E   T O   W I L L I A M   C A N N O N   D R.   

PROJECT OVERVIEW | The project will reconstruct the bridge structures at Stassney Lane and William Cannon Drive, as well as the frontage road bridge over Williamson Creek.

New U-turn bridges will be added in both directions at Stassney Lane and William Cannon Drive, and the I-35 mainlanes will be widened to incorporate shoulders and extended entrance/exit lanes to allow for better merging.

Bicycle and pedestrian enhancements are also being made, and new safety lighting is being installed.

• THIS WEEK’S PROJECT TRAFFIC ADVISORY •

Closures are weather permitting.

  • Southbound I-35 frontage road left lane closed between Stassney Ln & William Cannon Dr exit | From 9 a.m. until 3 p.m. Monday, October 16

     

     

 

  • Southbound I-35 frontage road left lane closed between William Cannon Dr & the Slaughter Ln exit. The Slaughter Ln exit #227 will also close. | Daily from 9 a.m. until 3 p.m. Monday, October 16 through Wednesday, October 18

 

  • Southbound I-35 left lane closed between Stassney Ln & William Cannon Dr | 10 p.m. Monday, October 16 to 6 a.m. Tuesday, October 17

 

  • Northbound I-35 frontage road right lane closed between Stassney Ln & Nelms Dr | Daily from 9 a.m. until 3 p.m. Wednesday, October 18 & Thursday, October 19

 

  • Southbound I-35 frontage road left lane closed between Stassney Ln & William Cannon Dr | From 9 a.m. until 3 p.m. Wednesday, October 17 & Thursday, October 19

 

  • Northbound I-35 entrance ramp from Slaughter Ln closed | 9 p.m. Monday, October 16 to 5 a.m. Tuesday, October 17

Read more on construction phasing and additional project details HERE.



I – 3 5   A T   F M   3 4 0 6 

PROJECT OVERVIEWThe intersection of FM 3406 and the I-35 frontage roads are being improved, and the FM 3406 bridge over I-35 is being reconstructed.

• THIS WEEK’S PROJECT TRAFFIC ADVISORY •

Closures are weather permitting.

 

  • I-35 frontage roads reduced to one lane in both directions at FM 3406 | Nightly from 8 p.m. until 5 a.m. Sunday, October 15 through Thursday, October 19

Read more on construction phasing and additional                                                                           project details HERE.

 



I – 3 5   F R O M   R M   1 4 3 1   T O   F M   3 4 0 6  ( S O U T H B O U N D )

PROJECT OVERVIEW | Two ramps on the southbound I-35 frontage roads between RM 1431 and FM 3406 are being reconstructed and reversed to address traffic congestion and improve I-35 frontage road and mainlane operations.

 

• THIS WEEK’S PROJECT TRAFFIC ADVISORY •

Closures are weather permitting.

 

  • Southbound I-35 reduced to one left lane between RM 1431 & Chandler Creek | 9 p.m. Thursday, October 19 to 5 a.m. Friday, October 20

Read more on construction phasing and additional                                                                           project details HERE.

 



My I35 Traffic Alerts are provided by Central Texas Regional Mobile Authority (CTRMA) & TxDOT.



 

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button