San Marcos’ Weekly Road Construction & Traffic Report

San Marcos’ Weekly Road Construction & Traffic Report

Short & Long Term Road Construction Projects

WEEKLY ROAD CONSTRUCTION SCHEDULE

 

LOCATION BEGIN DATE EST. END DATE
SESSOM DR: Single lane closures from N. LBJ to Peques through April 28, weather permitting, from 7 a.m. to 6 p.m. daily for sidewalk construction. City of San Marcos Engineering/CIP Dept., 512.393.8130 Present April 28
LP 82/AQUARENA SPRINGS: TxDOT will be introducing a new traffic signal at the intersection of Post/Bobcat. Traffic will be reduced to one lane in each direction and then detour to the new signal. This will last approximately 45 days starting on February 15. TxDOT, 512.393.8130 Feb. 15 End of April
RR 12/CRADDOCK: On south bound RR 12 to Craddock, maintenance work will commence for new water main construction on March 1 – April 27 from 8 a.m. – 5 p.m. daily, weather permitting. South bound traffic will be re-routed to center turn lane. KIVA, 512.295.8900     Mar. 1      8 a.m.     Apr. 27     5 p.m.
IH 35/YARRINGTON SOUTH: The inside and outside lanes of north and south bound IH35/Yarrington will be intermittently closed for concrete work at the new north bound entrance ramps #203, 206, 301, 302 and south bound Exit ramp #203 & 206 on April 18 – 21 from 9 p.m. – 5 a.m. One lane will remain open for smooth traffic flow. Please note that the entrance ramp North of Yarrington Rd., mile marker 210, will be permanently closed and removed as part of the final configuration. TxDOT, 512.587.8895  Apr. 18   9 p.m.

   Apr. 21    5 a.m.

IH35/YARRINGTON NORTH ENTRANCE RAMP: The entrance ramp to IH 35, north of FM 150 will be closed during the lane closures due to safety concerns for the public. Traffic will need to travel down the frontage road to the Blanco River and use Entrance Ramp #207 during this time. TxDOT, 512.587.8895    Apr. 18     9 p.m.     Apr. 21     5 a.m.
100 E. HOPKINS: The Kissing Alley located off the 100 block of Hopkins between Guadalupe and LBJ will be closed on  Thursday, April 20 from 5:30 p.m. – 9:30 p.m. for a downtown Walkabout. City of San Marcos Main Street Program, 512.393.8430 Apr. 20 5:30 p.m. Apr. 20 9:30 p.m.
500 FRANKLIN DR: South and north bound of the 500 block of Franklin will have one lane closed for Pothole Utility work on April 17 – 28 from 9 a.m. – 4 p.m. Michael Hammack, 512.942.6213   Apr. 17    9 a.m.    Apr. 28     4 p.m.
ARMSTRONG/MCARTHUR ST: Construction for a waste water connection will occur on Armstrong and McArthur St. from April 10 – 15 from 9 a.m. – 6 p.m. Street will be passable to regular and emergency vehicles. AJP Construction, 512.351.6479   Apr. 10   9 a.m.   April 15   6 p.m.
205 S CM ALLEN (CHILDREN’S PARK): There will be a temporary street closure for The ‘Just for Fun’ Parade that will take place on Saturday 22 starting at 10 a.m. The San Marcos Police Dept. officers will escort the annual parade that will begin and end at the Children’s Park and travel along CM Allen Parkway, Hopkins, Fredericksburg and Hutchison Street. Ronald Akin, 830.639.4528   Apr. 22   10 a.m. Apr. 22
EDWARD GARY/CM ALLEN: Pavement repairs will commence on LP 82 between Edward Gary Street and CM Allen on April 14 from 8 a.m. – 6 p.m. TxDOT, 512.353.1061   Apr. 14   8 a.m.   Apr. 14   6 p.m.
DASH 4 DONUTS 4 MILE RACE: The race will start at the 100 block of Edward Gary on Saturday, April 29. The course will leave all roads open for the exception of South Edward Gary between San Antonio and LBJ which will be closed from 7 a.m. – 11 a.m. San Marcos Police Officers with marked patrol vehicles as well as traffic cones, signs and volunteers will be posted throughout the course for easy directional assistance. Elias Verver, 512.423.0254    Apr. 29   7 a.m.     Apr. 19     11 a.m.
LONG TERM CLOSURE – WOODS ST: A segment of Woods St between Comanche and North Street will be closed during construction of the new Texas State University Engineering & Science Building beginning Monday, August 15 until August 2018. Project Manager Scott Rouse, 512.245.2202 Aug 15, 2016 August 2018
LONG TERM CLOSURE – EAST SAN ANTONIO STREET: Half a block closed from the alley to N. LBJ every Saturday from 8 a.m. – 3 p.m. for the Farmers Market on the Square. Main Street Program, 512.393.8430.  Year Round Year Round
LONG TERM CLOSURE – N LBJ:  From Holland St. to Camaro Way will be closed to through traffic until the summer of 2017. Road closure will occur during daytime construction hours. City contractor will be replacing utility lines in the area. Through traffic including Emergency Vehicles, will be routed around the project limits; please follow the detours. Engineering/Capital Improvements, 512.393.8130 Present Summer 2017
LONG TERM CLOSURE – VISTA ST.: All lanes in both directions will be closed from 310 – 312 Vista Street for utility construction until July 31, 2018. Texas State University, 512.245.2202 Present July 31, 2018

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button