What To Expect On San Marcos Roads During Week Of Sunday, April 8

San Marcos’ Weekly Road Construction & Traffic Report

Short & Long Term Road Construction Projects Affecting San Marcos Traffic Sunday, April 8 – Saturday, April 14, 2018

Can’t see the whole table? Touch it and scroll right.

WEEKLY ROAD CONSTRUCTION SCHEDULE

LOCATION BEGIN DATE EST. END DATE
MEDICAL PARKWAY: Medical Parkway between Wonder World and Leah will have a curb replacement project. The street will be open to traffic, please use caution, drive slowly, and watch for heavy equipment, construction workers and traffic control flaggers. All vehicles need to be parked off street or they may be towed at owners own expense. Shawn Wolfshohl, 512.393.8036. Apr. 5
9 AM
Apr. 13
3 PM
COMANCHE STREET: Comanche Street will be reduced single lanes in both directions to repair a leaking water main.
Apr. 13
5 PM
Apr. 15
6 PM
DURANGO STREET: Durango St. between Jaurez St and Luciano Flores Street will be closed for reclaimed waterline project. Rockin Q Construction, 512.738.6666. Oct. 30
8 AM
Apr. 30
5 PM
LP 82: Both the East-and Westbound lanes will be reduced to a single lane. TxDOT, 512.393.8130. Apr. 4
9 AM
Apr. 13
3:30 PM
SAN MARCOS PARKWAY: San Marcos Parkway to Leah Ave. is scheduled to undergo a street overlay project, daily. The street will remain open to traffic. Please use caution, drive slowly and watch for heavy equipment, construction workers, and traffic control flaggers. All vehicles should be parked off the street or they may be towed at owner’s expense. Jesse Shroyer, 512.393.8036. Mar. 7
8 AM
Apr. 13
5 PM
RIVER ROAD: River Road to Davis Lane is scheduled to undergo a street overlay project. The street will remain open to traffic with the exception of two closures, scheduled on April 11-13, 2018 and April 16-17, 2018. Please use caution, drive slowly and watch for heavy equipment, construction workers, and traffic control flaggers. All vehicles need to be parked off the street or they may be towed at owner’s expense. Jesse Shroyer, 512.393.8036.
Apr. 9
8 AM
Apr. 25
5:30 PM
LP 82: LP 82 from Charles Austin to Mill Street will be closed in both directions. TxDOT, 512.393.8130. Apr. 12
8 PM
Apr. 13
6 AM
LONG TERM: CRADDOCK AVENUE: Craddock Avenue between Old Ranch Road 12 and Bishop Street will have partial lane closures for median work. Community Enhancement, Amy Kirwin, 512.393.8419. Current
8 AM
Sept. 30
4 PM
LONG TERM CLOSURE – CHEATHAM STREET: Cheatham Street and the 400-500 Blocks of Guadalupe will have partial lane closures for new construction. Gary Bellomy Cheatham Street, L.P., 512.694.8839. Present
Dec. 31


• LONG TERM CLOSURE – OAK RIDGE DRIVE: Single lane closures daily for the installation of utility mains. City of San Marcos Engineering/CIP Dept., 512.393.8130. Present Aug.
2018
 LONG TERM CLOSUREWOODS STREET: A segment of Woods Street between Comanche and North Street will be closed during construction of the new Texas State University Engineering & Science Building. Project Manager Scott Rouse, 512.245.2202. Aug.
2015
Aug.
2018
 LONG TERM CLOSURE MCKIE ST: Mckie St. will be closed from IH-35 Frontage Rd. to apartment entrance for utility installation. Rockin Q Construction, 512.738.6666. Current
8 AM
Dec. 7
5 PM
 LONG TERM CLOSURE – MCKIE STREET: Mckie Street between the 400 and 600 blocks will be closed in both directions for the installation of a new water main. Erik Pelayo, Under Ground Water Solutions Co. 512.278.9333. Jan. 8
7 AM
Apr. 30
6 PM
 LONG TERM CLOSURE – VISTA ST: All lanes in both directions will be closed from 310 – 312 Vista Street for utility construction. Texas State University, 512.245.2202. Present Aug. 1
2018
LONG TERM CLOSURE – LP 82/AQUARENA SPRINGS: TxDOT introduced a new traffic signal at the intersection of Post/Bobcat traffic will be detoured to the new signal. TxDOT, 512.393.8130. February
2017
Spring
2018
** CLOSURE EVERY SATURDAY – EAST SAN ANTONIO STREET: Half a block closed from the alley to N. LBJ every Saturday from for the Farmers Market on the Square. Main Street Program, 512.393.8430. Every
Saturday
8 AM
Every
Saturday
3 PM


 

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button