Jannah Theme License is not validated, Go to the theme options page to validate the license, You need a single license for each domain name.

Railroad Crossings To Receive Maintanence

The lane closure will last two hours at each crossing. Two-way traffic will continue with the aid of flagger control.

Union Pacific Railroad has notified the City of San Marcos that their contractor, Advanced Work Zone, will work on the railroad crossing at CM Allen Pkwy, Patton St. and Wonder World Dr.

This Friday, April 7 from 8 a.m. to 5 p.m.

The lane closure will last two hours at each crossing. Two-way traffic will continue with the aid of flagger control.


 

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button