Jannah Theme License is not validated, Go to the theme options page to validate the license, You need a single license for each domain name.

Weekly Road Construction, Traffic Report, Low Water Crossings For San Marcos

LOCATION BEGIN DATE EST. END DATE
 McCARTY LANE: As part of the City’s new pavement management program to provide preventative maintenance to city streets, McCarty Lane from IH-35 to the railroad crossing will undergo street maintenance on June 13 – 17 daily from 8 a.m. – 5 p.m. Project length is estimated 5 days, weather permitting. Please park vehicles off the street or they may be towed at owners’ expense. City of San Marcos Streets Dept., 512.393.8025  June 13 @ 8 a.m.  June 17 @ 5 p.m.
WONDER WORLD DRIVE AT THE CENTER TEXAS MEDICAL CENTER: City contractor will be working in the area to repair a water leak. The closure is currently scheduled for June 7, weather permitting. Future closures will also occur through the end of June as needed. The outside lane of westbound Wonder World Drive will be reduced to 10 foot during the day. The outside lane of eastbound Wonder World Drive will be closed from 9 a.m. until 4 p.m. Project will last until the end of June. Engineering/Capital Improvements, 512.393.8130 June 7 @ 9 a.m. End of June
SPRING LAKE HILLS: Slurry street maintenance on Spring Lake Hills June 6 – 14, weather permitting, from 7 a.m. to 5 p.m. daily. Please park your vehicle off the street or it may be towed at your own expense. City of San Marcos Streets Dept., 512.393.8025 June 6 @

7 a.m.

June 14 @

5 p.m.

 SESSOM CREEK: Slurry street maintenance on Sessom Creek May 31 – June 10, weather permitting, from 7 a.m. to 5 p.m. daily. Please park your vehicle off the street or it may be towed at your own expense. City of San Marcos Streets Dept., 512.393.8025  May 31 @ 7 a.m.  June 10 @

5 p.m.

LAUREL/CHARLES AUSTIN/LP 82: The outside right lane from Laurel St. heading west bound to the Charles Austin intersection and the outside right lane from 300’ east of Sessom Drive on the east bound lanes through the LP 82/Charles Austin intersection will be closed for the installation of traffic signal poles on south and north side of the road. Please use alternate route as detour. This will occur on Wednesday June 8 and June 9 from 9 a.m. to 4 p.m., weather permitting. TxDOT, 512.619.4676 June 8 @ 9 a.m. June 9 @ 4 p.m.
IH35/YARRINGTON: The southbound exit ramp 210 will be under maintenance to widen ramp on June 6 and 7 from 9 a.m. – 3 p.m. TxDOT, 737.600.3137 June 6 @ 9 a.m. June 7 @ 3 p.m.
 HOLLAND/MOORE ST: Beginning Monday, February 15 at 7 a.m. Moore Street at Holland will be closed to correct traffic flow issues and to make enhancements to the Holland St. entrance into the Speck garage; however, the east entrance into Speck Garage on Academy St. will remain open. Moore St. and the Holland St. entrance into the garage will reopen on June 9. Texas State University, 512.719.5251  Feb. 15 @ 7 a.m.  June 9
 YARRINGTON RD: IH35/YARRINGTON: The southbound exit ramp 210 will be under maintenance to widen ramp on June 6 and 7 from 9 a.m. – 3 p.m. TxDOT, 737.600.3137 June 6 @ 9 a.m. June 7 @ 3 p.m.
 816 HOPKINS: The alley way between 817 Hopkins and Belvin St. will be under construction for street maintenance  through June 10 from 8 a.m. – 5 p.m. daily, weather permitting. Alley will be passable to thru traffic. City of San Marcos Streets Dept., 512.393.8025  Present June 10 @ 5 p.m.
ED J.L. GREEN: Advance notice of street maintenance from Sessom Dr. to Laurel Ridge on March 8 through April 11 from 8 a.m. to 5 p.m daily, except weekends. Please park your vehicle off the street or it may be towed. Project is estimated to last approximately 4 to 6 weeks, weather permitting. City of San Marcos Street Dept., 512.393.8025 Postponed for a month Postponed for a month
817 CHESTNUT ST: One lane will be closed for new construction to site   through June 10, 2016. Street will continue to be passable to all traffic. J4 Development, 469.236.0922 Dec. 7, 2015 June 10, 2016
 NORTH LBJ FROM CAMARO WAY TO CRADDOCK: This road will be open to two-way traffic, but the lanes will be shifted west to allow space for the City contractor to construct a new lift station on the corner of N. LBJ and Craddock. Project will last until summer 2016. Engineering/CIP, 512.393.8130 Present Summer 2016
EAST SAN ANTONIO STREET: Half a block closed from the alley to N. LBJ every Saturday from 8 a.m. – 3 p.m. for the Farmers Market on the Square. Main Street Program, 512.393.8430. Year Round  

Year Round

 

LOW WATER CROSSING & COMMON FLOOD-PRONE STREETS
1400 block Uhland Road at Blanco River
Cape Road at San Marcos River
200 block C.M. Allen Parkway at Children’s Park
1600 block Hunter Road at Purgatory Creek
William Pettus Road at the Creek

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button